Guide
Kitchen Fitting in Dubai
Published 2026-07-06 • First Unicorn Interiors • 800+ projects completed
Kitchen Fitting — Complete Guide
Looking for information about kitchen fitting in Dubai? This comprehensive guide covers everything you need to know, including real pricing from our 800+ completed projects across 46 Dubai communities.
What Does Kitchen Fitting Cost in Dubai?
Based on our project data from 2026, here are the typical costs:
| Level | Price Range (AED) | What's Included |
| Budget | Contact for quote | Essential work with quality materials |
| Mid-Range | Contact for quote | Premium materials with custom design |
| Luxury | Contact for quote | Bespoke everything, imported materials |
Why Choose First Unicorn Interiors?
- 800+ Projects Completed — across 46 Dubai communities
- In-House Team of 50+ — no subcontractors, every trade covered
- 3-Year Warranty — on all workmanship
- Free 3D Design — see your space before work begins
- All Approvals Handled — NOC, municipality, building permits
Our Process
Every project follows our proven 5-step process:
- Free Consultation — site visit and requirements gathering
- 3D Design — full visualisation of the finished result
- Detailed Quote — itemised pricing, no hidden costs
- Construction — in-house team handles everything
- Handover — quality inspection, snagging, deep clean
Related Services
Explore more of our renovation services:
Frequently Asked Questions
How much does kitchen fitting cost?
Costs vary based on scope, materials, and finish level. Contact us for a free, itemised quote specific to your property. We provide transparent pricing with no hidden costs.
How long does it take?
Timeline depends on scope. Small projects 2-4 weeks, medium 4-8 weeks, full renovation 8-16 weeks. We provide an exact timeline in our quote.
Do you handle permits and approvals?
Yes. We handle all community NOCs, Dubai Municipality approvals, and building permits as part of our service.
Do you use subcontractors?
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass — is handled by our in-house team. This means better quality control and accountability.
What warranty do you provide?
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials.
Kitchen Fitting in Dubai: Complete Guide to Costs, Timelines & Permits
Kitchen fitting in Dubai involves more than just installing cabinets and appliances; it requires navigating local regulations, coordinating with multiple trades, and understanding the unique cost structures of the emirate. Based on our 800+ projects across 46 communities, we break down everything you need to know. A standard kitchen fitting in Dubai costs between AED 45,000 and AED 120,000, depending on size, materials, and complexity. For a mid-range 15 sqm kitchen with semi-custom cabinetry, expect AED 55,000–75,000 including installation, plumbing, and electrical work. Luxury kitchens with imported marble and bespoke joinery can exceed AED 150,000. Timelines range from 4 to 8 weeks for fitting alone, plus 2–4 weeks for design and approvals. All work must comply with Dubai Municipality building codes and DEWA electrical standards. If you live in a master community like Emirates Hills or The Palm, additional approvals from the developer (e.g., Nakheel, Emaar) are required. First Unicorn Interiors handles all permits and offers a 3-year warranty on all installations.
What permits are needed for kitchen fitting in Dubai?
For kitchen fitting in Dubai, you typically need a renovation permit from Dubai Municipality (DM) if structural changes are involved, such as moving walls, gas lines, or major plumbing. For non-structural fitting (cabinetry, appliances, countertops), no DM permit is required, but you must notify the building management or community developer. In freehold communities like Dubai Marina or JLT, the developer (e.g., Emaar, Nakheel) may require a No Objection Certificate (NOC) and a refundable deposit of AED 2,000–5,000. DEWA approval is needed for electrical modifications; costs for a new circuit or relocation range from AED 500–1,500. First Unicorn Interiors manages all paperwork, including DM permit fees (AED 150–500) and NOC applications, ensuring compliance with RERA rules for tenanted properties.
How long does a kitchen fitting take in Dubai?
A typical kitchen fitting in Dubai takes 4–8 weeks from start to finish, depending on scope. For a like-for-like replacement (same layout, new cabinets and appliances), expect 4–5 weeks: 1 week for demolition, 2–3 weeks for cabinetry installation, and 1 week for countertops, plumbing, and electrical connections. If you're changing the layout or adding structural work (e.g., moving a sink or gas line), add 2–3 weeks for approvals and structural modifications. Luxury kitchens with imported materials may take 8–12 weeks due to lead times. First Unicorn Interiors provides a detailed timeline in your free quote, with milestones for each phase. We also coordinate with DEWA for meter upgrades if needed (typically 3–5 working days).
What is included in a kitchen fitting package in Dubai?
A comprehensive kitchen fitting package in Dubai typically includes: design consultation, demolition of existing kitchen, supply and installation of cabinetry (base, wall, tall units), countertops (laminate, quartz, or granite), sink and faucet installation, plumbing connections for dishwasher and washing machine, electrical wiring for appliances (hob, oven, extractor), and tiling or backsplash (up to a certain area). Mid-range packages (AED 55,000–75,000) often include quartz countertops, soft-close hinges, and a 3-year warranty. Luxury packages (AED 100,000+) include bespoke joinery, marble countertops, integrated appliances, and under-cabinet lighting. Exclusions: structural wall removal, floor tiling, ceiling work, and appliance purchases (unless specified). First Unicorn Interiors offers a free quote with a detailed scope of work, including all materials and labor.
- Kitchen fitting costs AED 45K–120K for standard 15 sqm kitchens in Dubai.
- Permits required from Dubai Municipality if structural changes are made.
- NOC from developer (e.g., Emaar, Nakheel) needed in master communities.
- Timeline: 4–8 weeks for fitting; 2–4 weeks for design and approvals.
- All work backed by a 3-year warranty; free quote via WhatsApp +971 58 565 8002.