Real pricing from completed projects. Not estimates — actual costs per kitchen, broken down by material, scope, and community.
Kitchen renovation in Dubai costs between AED 25,000 and AED 180,000 depending on size, materials, and scope. The average Dubai villa kitchen renovation sits around AED 45,000 to AED 75,000 for a complete transformation including cabinetry, countertops, appliances, tiling, plumbing, and electrical.
| Scope | Price Range (AED) | What's Included |
|---|---|---|
| Budget Refresh | 25,000 — 40,000 | New cabinet doors, paint, handles, splashback, basic countertop |
| Mid-Range | 45,000 — 75,000 | Full new cabinetry, quartz countertops, new appliances, tiling, lighting, plumbing updates |
| Premium | 80,000 — 120,000 | Custom handleless cabinetry, natural stone, Miele/Gaggenau appliances, smart lighting, island with waterfall edge |
| Ultra-Luxury | 120,000 — 180,000+ | Bespoke Italian design, imported marble, full Gaggenau suite, wine cooler, butler's pantry, structural changes |
Cabinetry is the single largest cost in any kitchen renovation. Flat-pack imported cabinets start around AED 800 per linear metre. Custom-built in-house joinery with soft-close hinges, push-to-open mechanisms, and handleless profiles costs AED 1,800 to AED 3,500 per linear metre. We build all our cabinetry in-house — no outsourcing, no middleman markup.
| Material | Cost per linear metre (AED) | Durability |
|---|---|---|
| Laminate | 300 — 600 | 5-10 years |
| Quartz (Silestone, Caesarstone) | 800 — 1,500 | 20+ years |
| Granite | 600 — 1,200 | 20+ years |
| Marble (Calacatta, Statuario) | 1,500 — 4,000 | Lifetime (needs sealing) |
| Dekton / Neolith | 1,200 — 2,500 | Virtually indestructible |
Budget packages (Bosch/Siemens) run AED 8,000 to AED 15,000 for a full set. Premium packages (Miele, Gaggenau, Sub-Zero) can reach AED 40,000 to AED 80,000. We source direct from authorised UAE distributors — same warranty, better pricing.
Basic ceramic: AED 35-80 per sqm installed. Premium porcelain: AED 80-200 per sqm. Natural stone: AED 150-400 per sqm. Glass splashback: AED 200-500 per sqm.
Moving a sink or adding a dishwasher connection adds AED 2,000-5,000. Full electrical rewiring for new lighting layout: AED 3,000-8,000. Under-cabinet LED lighting: AED 1,500-3,000.
| Community | Typical Kitchen Size | Average Cost (AED) |
|---|---|---|
| Arabian Ranches (Saheel, Alvorada) | 15-20 sqm | 55,000 — 85,000 |
| Springs / Meadows | 10-15 sqm | 35,000 — 60,000 |
| Dubai Hills (Sidra, Maple) | 18-25 sqm | 65,000 — 110,000 |
| Emirates Hills | 25-40 sqm | 90,000 — 180,000 |
| Palm Jumeirah | 20-35 sqm | 80,000 — 150,000 |
| JVC / JVT | 8-14 sqm | 25,000 — 50,000 |
| Damac Hills | 12-20 sqm | 40,000 — 75,000 |
A complete kitchen renovation in Dubai typically takes 3 to 6 weeks from demolition to handover. Budget refresh (doors, paint, handles) can be done in 1-2 weeks. Premium with structural changes: 6-8 weeks. Our in-house team handles demolition, plumbing, electrical, tiling, joinery, countertop installation, appliance fitting, and final styling — one team, one timeline, no coordination headaches.
Watch out for these hidden costs that other contractors leave out of their initial quote:
Send us your kitchen photos on WhatsApp. We will reply with a detailed quote within 2 hours.
WhatsApp Us for a Free Quote