Concrete shell, multi-layer waterproofing, plant room, MEP, tiling — with full Trakhees/Nakheel/DDA NOC handled. From AED 200K, 8-week typical build, 5-year structural warranty.
| Community | Scope | Duration | Budget Range |
|---|---|---|---|
| Emirates Hills | New build pool + landscaping | 12 weeks | AED 285K |
| Arabian Ranches | Pool renovation + new tile | 6 weeks | AED 95K |
| Dubai Hills | New build pool + plant room | 10 weeks | AED 220K |
| Palm Jumeirah | Infinity pool refurbishment | 8 weeks | AED 165K |
Want a similar pool construction estimate?
WhatsApp My Project BriefMost pool companies in Dubai subcontract everything. That means delays, finger-pointing, and surprise costs. We do it differently.
Excavation, steel reinforcement, gunite/shotcrete shell, waterproofing, tiling, coping, and commissioning.
Sand/cartridge filtration, pumps, skimmers, return jets, underwater lighting, and electrical connections.
Glass mosaic, porcelain, or natural stone. Coping stones, bullnose edges, and custom waterline patterns.
Pool decking, planters, pergolas, outdoor showers, and garden integration around your new pool.
Heat pumps, solar panels, integrated spas, and jacuzzi jets for year-round swimming.
Community NOC, municipality permits, engineering drawings, and safety compliance — all included.
No obligation at any stage. You only pay when you sign.
We visit your property within 24 hours. Measure, photograph, assess soil and access conditions.
Within 24 hrsPhotorealistic 3D renders of your pool in your actual garden. Line-by-line pricing — the number doesn't move.
3–5 working days50/40/5/5 payment milestones. Daily WhatsApp photos and progress reports. One group chat until handover.
4–8 weeksFull snagging, equipment training, water chemistry handover, and 3-year warranty. Plus 3 months free maintenance.
3-year warrantyEvery pool below was designed, built, and finished by First Unicorn — no subcontractors.






Slide to compare before and after. These are real Dubai projects completed by our in-house team.
Kitchen Renovation — Dubai Hills
Bathroom Renovation — Arabian Ranches
Living Room Renovation — Jumeirah Park
We build both. Here's an honest comparison to help you decide.
| Factor | Fibreglass | Concrete (Gunite) |
|---|---|---|
| Installation time | 2–3 weeks | 6–10 weeks |
| Cost (8x4m) | AED 70K–100K | AED 80K–120K |
| Shape flexibility | Pre-moulded shapes only | Any shape, depth, or feature |
| Surface finish | Smooth gelcoat — non-porous | Tiles, pebble, or plaster |
| Maintenance | Lower — algae-resistant surface | Higher — requires regular brushing |
| Durability | 25+ years with gelcoat renewal | 30+ years with retiling every 10–15 yrs |
| Best for | Standard shapes, fast install, low upkeep | Custom designs, infinity edges, large pools |
| Resale value | Good | Excellent — perceived as premium |
Not sure which to choose? Book a free site visit and we'll recommend the best option for your villa, soil type, and budget.
All prices include excavation, construction, tiling, filtration, and commissioning. No hidden costs.
| Pool Type | Price Range (AED) | Includes |
|---|---|---|
| Plunge Pool (3x2m) | 55,000 – 80,000 | Shell, tiling, filtration, coping |
| Standard Pool (8x4m) | 80,000 – 120,000 | Full build, tiling, filtration, decking |
| Lap Pool (12x3m) | 100,000 – 150,000 | Full build, lane markings, heating option |
| Full Custom / Infinity | 150,000 – 400,000+ | Bespoke design, vanishing edge, water features |
| Pool Renovation / Retiling | 25,000 – 80,000 | Drain, prep, waterproof, retile, refill |
| Landscaping Package | 30,000 – 100,000 | Decking, planters, pergola, outdoor shower |
Prices are guide ranges. Your fixed-price quote is confirmed after a free site visit. Payment terms: 50/40/5/5 milestones.
"Complete ground floor renovation — kitchen, living room, guest bathroom. Fixed quote of AED 185,000, delivered in 9 weeks. Professional, transparent, and exactly on budget."
"Full kitchen renovation with custom joinery and marble countertops. Quoted AED 68,000, final bill AED 68,000. Couldn\'t ask for more."
"Third contractor we tried after two disasters. First Unicorn finished what others couldn\'t. Their in-house team is exceptional."
"Entire ground floor — kitchen, living area, guest bathroom, new flooring. Delivered in 8 weeks, exactly AED 210,000 as quoted. Already planning phase two."
No subcontractors. Our excavation crew, steel fixers, tilers, plumbers, and electricians are all employed by us.
The number on your contract is the number you pay. No variation orders, no surprise costs after excavation.
One group chat with your project manager. Daily photos, daily progress, every question answered same-day.
Fully licensed by the Department of Economic Development. We handle all municipality and community permits.
Structural, waterproofing, and equipment warranty. Plus 3 months of free pool maintenance after handover.
50% on signing, 40% across milestones, 5% at pre-handover, 5% at final handover. Your money is protected.
We build pools in every major community. Approvals for each developer handled in-house.
Tell us about your project. We send a price range and a free 3D concept within one working day — no sales calls, no spam.
Pool construction slots fill fast in Q2. Secure your build date now and swim by summer.
Get Pool Project Estimate →Free site visit. Fixed-price quote. 4–8 week build. 3-year warranty. One call to get started.
Average response time: under 2 hours