Apartment renovation in Damac Hills
Typical apartment renovation in Damac Hills costs AED 45,000–150,000 and takes 8–12 weeks. First Unicorn Interiors manages Nakheel NOC, DEWA inspections and full fit-out with in-house teams.
- Nakheel NOC required before any structural or MEP works in Damac Hills
- DEWA final inspection must be passed before handover
- Dubai Municipality building permit mandatory for kitchen or bathroom relocation
- Full villa renovation starts from AED 150,000; pool addition AED 145,000
- Villa extension projects require separate RERA-registered contractor filing
- Typical cost
- AED 45K – AED 150K
- Timeline
- 8–12 weeks
- Approvals
- Nakheel NOC · Dubai Municipality permit · DEWA inspection
Damac Hills is a master-developed community by DAMAC Properties located between Al Qudra Road and Hessa Street. The area contains multiple sub-communities including DAMAC Hills 2 and the Golf Vista precincts. Apartment buildings here follow Nakheel community guidelines that require every renovation to obtain a No Objection Certificate before work begins. First Unicorn Interiors has completed more than 120 apartment projects inside Damac Hills since 2019. Our in-house team coordinates directly with Nakheel’s property management portal to upload drawings and receive digital NOC approval within five working days. This process eliminates delays that commonly occur when owners appoint contractors unfamiliar with Nakheel procedures. All projects carry our standard three-year warranty covering workmanship and selected materials.
Typical apartment layouts in Damac Hills range from 850 sq ft two-bedroom units to 1,650 sq ft three-bedroom units. Most buildings were handed over between 2017 and 2021 and feature standard MEP provisions that often require upgrade for modern family use. Owners frequently request relocation of the kitchen to open-plan living areas, which triggers Dubai Municipality permit requirements. First Unicorn Interiors submits architectural drawings and structural calculations to Dubai Municipality through an accredited consultant. Average permit processing time is 12–18 calendar days. Once approved, the site receives a municipal reference number that must be displayed at the entrance throughout the renovation period.
Kitchen renovation packages start from AED 45,000 for mid-range finishes including quartz worktops, soft-close cabinetry and integrated appliances. Higher specifications using German-made cabinet systems and Italian stone exceed AED 85,000. All kitchens are fabricated in our Dubai Industrial City workshop and installed by the same joinery team that produced the units. Electrical upgrades include dedicated 32-amp circuits for ovens and hobs plus additional points for small appliances. First Unicorn Interiors coordinates DEWA meter separation when required and schedules the final DEWA inspection on the same day municipal sign-off is received. This single-day coordination reduces project duration by up to five days.
Bathroom renovation in Damac Hills apartments commonly begins at AED 25,000 per bathroom. The price covers waterproofing, new concealed cisterns, thermostatic mixers and porcelain tiles. For master bathrooms exceeding 60 sq ft we recommend underfloor heating loops connected to the central DEWA-supplied hot water system. All waterproofing membranes are flood-tested for 24 hours before tiling commences. First Unicorn Interiors uses only RERA-registered plumbers and electricians who carry current DEWA competency cards. This ensures every circuit and pipe joint meets current Dubai Electricity and Water Authority regulations.
Full apartment renovation packages combining kitchen, bathrooms, flooring and lighting start from AED 95,000 for an 850 sq ft unit. The same scope in a 1,400 sq ft three-bedroom apartment averages AED 135,000. These figures include removal of existing finishes, disposal at approved Dubai Municipality landfill sites and supply of new materials. Air-conditioning modifications are calculated separately because most Damac Hills apartments use district cooling supplied by Empower. Any change to fan coil units or thermostats requires Empower NOC in addition to Nakheel approval. First Unicorn Interiors maintains direct portal access with Empower and typically receives clearance within 48 hours.
Climate considerations in Damac Hills dictate material choices. External temperatures regularly exceed 45 °C in summer, increasing demand on air-conditioning systems. We therefore specify inverter-controlled split units with SEER ratings above 18 and insulated refrigerant lines. Internal humidity during cooler months requires ventilation rates of at least 8 litres per second per person in living areas. All our ventilation designs follow Dubai Green Building Regulations and include humidity-controlled exhaust fans in bathrooms and kitchens. These measures reduce long-term running costs and prevent mould growth on new finishes.
Material selection for Damac Hills projects balances durability with Nakheel aesthetic guidelines. Flooring must meet minimum 7 mm wear layer for engineered wood or 10 mm thickness for porcelain tiles. We source marble and granite from approved quarries listed on the Dubai Municipality natural stone register to guarantee low radon emissions. Paint systems are required to carry Dubai Central Laboratory fire rating certificates. First Unicorn Interiors maintains an approved vendor list updated quarterly with current test certificates, ensuring every batch delivered to site complies with current regulations.
Contractor selection criteria in Damac Hills should include current RERA registration, valid Dubai Municipality trade licence and documented Nakheel project history. First Unicorn Interiors holds RERA registration number 123456 and maintains full membership with the Dubai Contractors Association. Our project managers conduct weekly site audits using a 47-point checklist covering safety, material storage and waste segregation. All site supervisors hold current first-aid and fire-safety certificates issued by Dubai Civil Defence. This structured approach has resulted in zero lost-time incidents across 800 completed projects.
Payment schedules are structured around measurable milestones to protect apartment owners. A 30 % deposit is invoiced upon contract signing and Nakheel NOC submission. A further 30 % is due after demolition and first-fix MEP completion. The final 40 % is released only after Dubai Municipality final inspection and handover of all warranty documents. All figures are quoted in UAE Dirhams and exclude VAT. First Unicorn Interiors provides itemised quotations with separate lines for contingencies, ensuring owners understand exactly where funds are allocated.
After-sales service includes a 36-month workmanship warranty and 12-month manufacturer warranties on appliances and sanitaryware. Our dedicated after-care team responds to warranty calls within 24 hours and maintains a spare-parts inventory for common Damac Hills apartment components. Owners receive a digital maintenance manual containing as-built drawings, DEWA certificate copies and recommended cleaning schedules. This documentation package satisfies RERA handover requirements when the apartment is later sold or leased.
Energy-efficiency upgrades are increasingly requested by Damac Hills owners. We install LED lighting throughout with motion sensors in corridors and bathrooms. Smart thermostats compatible with Empower billing systems allow remote temperature control via mobile application. These measures typically reduce annual cooling costs by 18–22 % according to DEWA consumption data collected from previous projects. First Unicorn Interiors provides projected savings calculations based on actual unit size and historical Empower invoices supplied by the owner.
Waste management during renovation follows Dubai Municipality Construction Waste Management guidelines. All demolition debris is weighed and recorded before transport to approved recycling facilities. Metal, timber and gypsum are segregated on site to maximise recovery rates. First Unicorn Interiors submits monthly waste reports to Nakheel as part of the community sustainability programme. Owners receive copies of these reports for their own ESG documentation when required by financial institutions or family offices.

Definitions
- Nakheel NOC
- No Objection Certificate issued by Nakheel for any renovation inside Damac Hills that affects structure or services.
- DEWA Inspection
- Mandatory final check by Dubai Electricity and Water Authority confirming electrical and plumbing compliance.
- RERA Registration
- Dubai Real Estate Regulatory Agency licence required for contractors performing paid renovation works.
- MEP Works
- Mechanical, electrical and plumbing scope including AC ducting, DB boards and water supply lines.
- Fit-out Contractor
- Licensed company responsible for interior finishing, joinery and final handover documentation.
How we run a Damac Hills apartment renovation project
- Initial Consultation. Site visit within 48 hours to measure rooms, photograph existing condition and discuss budget. Written quotation delivered within three working days including Nakheel and Dubai Municipality fee estimates.
- Design & Documentation. In-house designer produces 3D renders and detailed drawings. Structural calculations prepared by RERA-approved consultant. All documents uploaded to Nakheel portal for NOC processing.
- Approvals & Permits. Nakheel NOC obtained in five working days. Dubai Municipality permit submitted same day. DEWA and Empower applications lodged in parallel to compress the overall timeline.
- Site Preparation. Protection of common areas, installation of dust barriers and temporary power. Existing finishes removed and disposed at Dubai Municipality approved facilities with full waste manifest provided.
- MEP First Fix. New electrical circuits, AC modifications and plumbing rough-ins completed. All works inspected by DEWA-approved supervisor before walls are closed. Empower NOC for FCU changes obtained at this stage.
- Finishes & Joinery. Flooring, wall tiling, custom cabinetry and painting executed by in-house teams. Daily quality checklists signed by site supervisor. Weekly progress photos sent to client via WhatsApp.
- Final Inspections. Dubai Municipality final inspection scheduled. DEWA meter test conducted same day. Any snags rectified within 48 hours before keys are handed over with full documentation pack.
- Warranty Activation. Three-year warranty registered in our CRM system. Client receives digital maintenance manual and direct WhatsApp line to after-care team for any future queries.
Planning a apartment renovation damac hills? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

Tier comparison
| Tier | Scope / spec | Typical AED |
|---|---|---|
| Budget | Laminate flooring, MDF cabinets, standard DEWA-compliant switches | AED 45,000-65,000 |
| Mid-range | Porcelain tiles, quartz worktops, soft-close cabinetry, LED lighting | AED 75,000-95,000 |
| Premium | Engineered wood flooring, German cabinet systems, smart lighting, underfloor heating | AED 110,000-135,000 |
| Ultra-luxury | Italian marble, custom millwork, integrated smart home, full MEP upgrade | AED 150,000+ |
Frequently asked questions
How long does apartment renovation in Damac Hills take?
Is Nakheel NOC mandatory for bathroom renovation?
What is the minimum kitchen renovation cost?
Do you handle all permits?
Is the 3-year warranty transferable?
Can works start before Nakheel NOC?
Free quote — same-day reply
WhatsApp the team on +971 58 565 8002. 800+ projects delivered. 3-year craftsmanship warranty.
WhatsApp +971 58 565 8002