Quick Answer
First Unicorn delivers building construction across 21 communities and zones in the UAE as a single design-and-build team — fixed price from a real BOQ, every permit and NOC handled in-house, 3-year warranty.
Building & G+10 Construction — 21 Areas Across the UAE
Pick your community or zone for local pricing, approvals and a fixed quote.
Abu Dhabi
Build With the UAE's Single Design-and-Build Team
Fixed price from a real BOQ, every approval handled in-house, 3-year warranty across 800+ projects.
Construction in the UAE — Your Questions
Do I need a Grade-1 contractor?
In Dubai, a Grade-1 building classification is required above G+4, earned through DM-certified engineers. Other emirates use their own category systems (e.g. Abu Dhabi's DMT). We hold what your category requires.
How long does a G+10 take?
Typically 18–30 months depending on floors, basement and façade, plus 2–4 months of design and approvals. Built under FIDIC with mandatory milestone inspections to the Building Completion Certificate.