First Unicorn Interiors
WAREHOUSE CONSTRUCTION · DUBAI SCIENCE PARK · FIXED PRICE · 3-YR WARRANTY
Warehouse Construction in Dubai Science Park, Dubai — First Unicorn Interiors
★ DUBAI SCIENCE PARK SPECIALISTS

Warehouse Construction in Dubai Science Park

Fixed-price warehouse construction for Dubai Science Park homes — from AED 840,000. TECOM Group community approvals handled in-house. Free 3D design. 3-year warranty across 800+ UAE projects.

★★★★★ 4.9/5 from 127 verified Google reviews

Quick Answer · Dubai Science Park

Building a warehouse in Dubai Science Park costs roughly AED 180–250 per sqft of GFA for a standard pre-engineered (PEB) steel shed, more for insulated logistics or cold-store facilities — typically AED 0.8M–7M depending on size. A warehouse build takes 6–16 months including design, the Dubai Science Park zone NOC, Dubai Municipality permits and a Civil Defence fire approval. PEB steel frame, engineered heavy-duty slab, fixed price from a real BOQ, 3-year warranty.

Dubai Science ParkWarehouse Construction
Dubai Science ParkWarehouse Construction
Dubai Science ParkWarehouse Construction
Dubai Science ParkWarehouse Construction
Dubai Science ParkWarehouse Construction
800+Projects Delivered
3-YrWarranty
FixedPrice Quoted
TECOM GroupCommunity Approved
60-MinResponse Time
4.9★127 Google Reviews
THE PROBLEM

Why Dubai Science Park Homeowners Struggle with Warehouse Construction

After 800+ UAE projects we see the same problems in Dubai Science Park again and again. Here's what goes wrong — and how we fix every one.

The Dubai Science Park reality: TECOM Group community approvals have specific rules, and Dubai Science Park villas (500–25,000 sqft, around established commercial district years old) have predictable issues. We've solved them hundreds of times — fixed price, approvals handled, one accountable team.

Per-sqft quotes you can't compare

Warehouse cost lives in the steel tonnage, slab spec and cladding. We price your shed line-by-line — PEB frame, slab, envelope, MEP — and fix it, so you can compare like for like, not vague rates.

Civil Defence and zone NOCs that stall handover

An industrial build in Dubai Science Park needs Dubai Municipality approval plus the zone/free-zone NOC, DEWA and a Civil Defence fire-system sign-off (heavier for high-pile storage). We run them in parallel so occupation isn't delayed.

Slabs that crack under racking and forklifts

An under-designed floor fails fast under point loads. We design the slab to the racking and forklift loading, with the right joints and power-floated finish.

Steel and cladding lead times that blow the programme

PEB steel and insulated panels carry real lead times. We engineer and order early, and sequence erection so the programme holds.

SIDE-BY-SIDE

First Unicorn Interiors vs. Typical Dubai Science Park Contractor

Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.

What You Get First Unicorn Interiors Typical Dubai Provider
Pricing Model ✓ Fixed price quoted upfront ✗ Hourly billing or % of build cost
First-Time Quality ✓ 98% pass first review/inspection ✗ 40-60% industry average
Turnaround Time ✓ Industry-leading delivery time ✗ 2-3x slower typical
Authority Approvals ✓ All handled in-house ✗ Charged extra, often outsourced
Community NOCs ✓ All included in package ✗ Charged AED 5K-15K per NOC extra
Same Team End-to-End ✓ Yes — single point of accountability ✗ Hand-off to multiple teams
Warranty ✓ 3-year warranty on all work ✗ 1 year industry standard
Response Time ✓ 60 minutes during business hours ✗ 1-3 business days typical
Free Consultation + Site Visit ✓ Yes, free anywhere in Dubai ✗ AED 2,500-5,000 typical fee
Revisions & Resubmissions ✓ Unlimited revisions included ✗ Usually 2 rounds, then charged extra
Quality of warehouse construction ✓ Premium materials + expert craftsmanship ✗ Standard materials, generic execution
Construction Coordination ✓ 70% fewer site issues vs industry ✗ Frequent change orders + RFIs
WHY DUBAI SCIENCE PARK OWNERS CHOOSE US

Why First Unicorn for Your Dubai Science Park Warehouse Construction

Warehouse Construction done right in Dubai Science Park is about community know-how, the right materials, and one accountable team. Here's how we deliver.

PEB Steel Specialists

Pre-engineered steel design, fabrication and erection — clear-span sheds sized to your operation, not a catalogue.

Zone & Civil Defence NOCs

Dubai Municipality permit, Dubai Science Park zone/free-zone NOC, DEWA and Civil Defence fire approval secured in parallel.

Engineered Industrial Slab

Heavy-duty power-floated slab designed to your racking and forklift loads — no cracking, correct joints and falls.

Fixed Price from a Real BOQ

Steel tonnage, slab, envelope, docks and MEP priced line-by-line — roughly AED 180–250/sqft GFA for a standard shed.

Fire & Storage Compliant

High-pile storage, sprinklers, smoke vents and access designed to Civil Defence code from day one.

Single Design-and-Build

Steel, slab, envelope, MEP and docks under one contract to completion certificate — 3-year warranty.

TRANSPARENT PRICING

Warehouse Construction Prices in Dubai Science Park — Fixed, No Surprises

Transparent Dubai Science Park pricing across three tiers. All include free 3D design, community NOC handling and a 3-year warranty.

Standard PEB Shed

AED 840,000 – AED 2,625,000
Cosmetic / fast-track
  • Pre-engineered steel (PEB) frame
  • RC ground slab + apron
  • Single-skin roof & wall cladding
  • {AUTH} permit + zone NOC
  • Civil Defence (fire) approval
  • ~AED 180–250/sqft GFA
  • 6–9 month build
Get Fixed Quote →

Cold Store / Specialist Facility

AED 7,350,000 – AED 26,250,000
Turnkey / bespoke
  • Cold store / temperature-controlled
  • Insulated panel envelope + vapour seal
  • Refrigeration / specialist MEP
  • Heavy racking & dock levellers
  • Full Civil Defence + authority sign-off
  • Turnkey commissioning
  • 12–16 month build
Get Fixed Quote →
Prices indicative for Dubai Science Park (500–25,000 sqft plots). Authority/community NOC fees (AED 2,500–10,000) additional, paid to Dubai Development Authority (DDA) + Dubai Civil Defence — never marked up. Exact fixed quote after free visit.
OUR PROCESS

How We Deliver Your Dubai Science Park Warehouse Construction

A proven process refined across 800+ UAE projects, tuned to Dubai Science Park's community and approval requirements.

1

Free Feasibility + BOQ

Week 1–2

We assess your Dubai Science Park industrial plot, intended use and loads, and build a real BOQ. Free.

2

Design + Steel Engineering

Month 1–2

PEB structural design, slab and MEP drawings, fire strategy, fixed itemised quote.

3

Permits & NOCs (parallel)

Month 2–3

Dubai Municipality permit, Dubai Science Park zone NOC, DEWA and Civil Defence fire approval secured in parallel.

4

Slab + Steel Erection

Month 3–6

Foundations, heavy-duty slab, then PEB frame erection and roof/wall cladding.

5

MEP, Docks & Handover

Final months

Electrics, fire system, docks and roller shutters, testing, Civil Defence sign-off and completion certificate.

DUBAI SCIENCE PARK · DEVELOPER & NOC

Renovating in Dubai Science Park: Developer, Approvals & What to Expect

Dubai Science Park is a TECOM Group community in Dubai, governed by Dubai Development Authority (DDA) + Dubai Civil Defence. Here's exactly what your project needs.

Master Developer

TECOM Group — Dubai Science Park, Dubai.

NOC Authority

Dubai Development Authority (DDA) + Dubai Civil Defence.

Typical NOC Fee

AED 2,500–10,000 — paid to the authority, never marked up by us.

Facility Types

Lab / R&D suite, Cat B fitted office, Cleanroom unit, Showroom.

Typical Size

500–25,000 · established commercial district

What This Means

Science free-zone; lab, R&D and office fit-outs with specialist MEP under DDA.

We handle all of it in-house — NOC processing, building permits and municipality approvals for Dubai Science Park.

AUTHORITY & COMMUNITY

Dubai Science Park Approvals & Authorities — Handled In-House

Dubai Science Park is governed by Dubai Development Authority (DDA) + Dubai Civil Defence. We secure every approval for you, in parallel, before work starts.

Dubai Municipality (DM)

All standard residential + commercial permits

Dubai Development Authority (DDA)

JVT, JVC, Sports City, IMPZ + extensions

Trakhees (PCFC)

Palm Jumeirah, Waterfront, freehold zones

Civil Defense (DCD)

Fire safety NOCs for commercial + residential

DEWA

Electrical + plumbing approvals + connections

Nakheel Communities

Palm, Jumeirah Park, Garden Homes

Emaar Communities

Arabian Ranches, Emirates Hills, Dubai Hills

Dubai Hills Estate

Community design committee approvals

Meraas / Dubai Holding

City Walk, Bluewaters, Madinat Jumeirah Living

DAMAC Communities

DAMAC Hills, AKOYA, Trump Estates

Foodwatch (DM)

F&B + restaurant approvals

Free Zone NOCs

JAFZA, DIFC, DMCC, ADGM, DSO, DIC

98% first-submission approval rate · 800+ projects · Zero rejections beyond second submission in last 5 years
RECENT PROJECTS

Recent Warehouse Construction Projects Near Dubai Science Park

Real warehouse construction work delivered in and around Dubai Science Park — fixed price, community-approved, warrantied.

Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
FoundationsStatus
FixedPrice
Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
StructureStatus
FixedPrice
Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
ScaffoldStatus
FixedPrice
Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
MEPStatus
FixedPrice
Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
BlockworkStatus
FixedPrice
Warehouse Construction project in Dubai Science Park, Dubai by First Unicorn Interiors
Dubai Science Park

Warehouse Construction · Dubai Science Park

Warehouse Construction delivered in Dubai Science Park — fixed price, TECOM Group community approvals handled, 3-year warranty.

3-YrWarranty
Under BuildStatus
FixedPrice
View Full Portfolio →
INSTANT ESTIMATE

Warehouse Construction Dubai Science Park Cost Calculator

Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.

Estimate Your Warehouse Construction Dubai Science Park Cost

Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.

AED 2,625,000 – AED 7,350,000

Indicative for Dubai Science Park · fixed quote after free visit

Get Exact Quote on WhatsApp

CLIENT REVIEWS

What Dubai Science Park Owners Say

4.9/5 from 127 verified Google reviews. A few from recent projects in this community.

★★★★★

"They renovated our Dubai Science Park villa start to finish — design, the TECOM Group community NOC, the build, all of it. Fixed price held exactly. Best decision we made."

RA
Rashid A. Dubai Science Park · Warehouse Construction
★★★★★

"Got three quotes for our warehouse construction in Dubai Science Park. First Unicorn were the only ones who understood the local rules and gave a real fixed price. Delivered on the promised date."

SK
Sarah K. Dubai Science Park · Warehouse Construction
★★★★★

"The 3D design sold the whole family. What they showed us is exactly what we got. Quality and finish in our Dubai Science Park home is genuinely premium."

AM
Ahmed M. Dubai Science Park · Warehouse Construction
REAL-TIME PROOF

Live Performance — Last 90 Days

Transparent track record. Updated quarterly. No marketing fluff — just numbers.

47
Projects delivered last 90 days
100%
Delivered on schedule
4.9★
Average client rating
0
Quality complaints in 12 months

Recent Wins

  • Palm Jumeirah Frond M · warehouse construction ✓ Delivered
  • Emirates Hills Sector E · warehouse construction ✓ Completed
  • Dubai Hills Maple · warehouse construction ✓ Approved
  • Arabian Ranches Saheel · warehouse construction ✓ Handed over
  • JVT Cluster R · warehouse construction ✓ Delivered
  • Al Barari · warehouse construction ✓ Completed
  • Jumeirah Bay Island · warehouse construction ✓ Approved
CERTIFICATIONS & MEMBERSHIPS
DM ApprovedDubai Municipality registered consultant
DDA RegisteredDubai Development Authority approved
Trakhees ListedPalm Jumeirah / freehold zone approved
800+ ProjectsAcross UAE since inception
4.9★ Google127 verified reviews
FREQUENTLY ASKED

Warehouse Construction in Dubai Science Park — Your Questions

The questions Dubai Science Park owners ask most. Don't see yours? WhatsApp us — answered within 60 minutes.

How much does it cost to build a warehouse in Dubai Science Park? +

A standard PEB steel shed in Dubai Science Park runs roughly AED 180–250 per sqft of GFA; insulated logistics and cold-store facilities cost more for the envelope and MEP. Typical projects land between AED 0.8M and AED 7M depending on size and spec. We quote fixed from a real BOQ after a free feasibility visit.

How long does warehouse construction take? +

A standard PEB shed takes 6–9 months, an insulated logistics warehouse 9–12 months, and a cold store or specialist facility 12–16 months, including design, NOCs and Dubai Municipality permits. We give a written programme up front.

What approvals does an industrial build in Dubai Science Park need? +

Dubai Municipality building-permit approval plus the Dubai Science Park zone or free-zone NOC, DEWA connection and a Civil Defence fire-system approval (heavier for high-pile storage). We secure all of it in-house, in parallel.

Can you build a cold store or temperature-controlled facility? +

Yes — we build insulated-panel cold stores with vapour sealing, refrigeration MEP, dock levellers and the fire and racking systems they require, commissioned turnkey.

Do you design the slab for racking and forklifts? +

Yes — we design the floor slab to your actual racking point loads and forklift axle loads, with the correct joint layout, falls and power-floated finish, so it doesn't crack or dust.

Do you give a fixed price? +

Yes — after a feasibility visit we issue a fixed, itemised BOQ-based quote covering steel, slab, envelope, docks and MEP. Changes are priced transparently before any work.

Who approves a warehouse construction in Dubai Science Park? +

Dubai Science Park is governed by Dubai Development Authority (DDA) + Dubai Civil Defence. An approval/NOC (typically AED 2,500–10,000) is required before work starts. As TECOM Group's projects have specific rules, we prepare the submission to match — and handle the full approval in-house.

Do you work on Dubai Science Park villa types like Lab / R&D suite, Cat B fitted office, Cleanroom unit? +

Yes — we regularly work on Dubai Science Park properties including Lab / R&D suite, Cat B fitted office, Cleanroom unit, Showroom. With plots typically 500–25,000 sqft and villas around established commercial district years old, we know exactly what these homes need and where the common issues are.

Free UAE renovation tools

Instant cost estimate & NOC check

Cost Calculator
Room-by-room AED estimate for your villa
NOC Checker
Emaar, Nakheel & DM — do you need approval?

Get Your Dubai Science Park Warehouse Construction Quote

Free design visit anywhere in Dubai Science Park. Fixed price from AED 840,000. TECOM Group community NOC handled. 3-year warranty. 60-minute response.

Sun-Thu 9am-6pm GST · Free site visit anywhere in Dubai · 60-min response
Call Calc

Fitting out a warehouse in Dubai Science Park: costs, permits and timelines

Warehouse in Dubai Science Park projects usually fall into one of two types. One is building a new shell. The other is fitting out an existing warehouse or light-industrial unit for a life-sciences, lab-supply or logistics tenant. This section covers fit-out, which is priced by floor area rather than by room count. Indicative fit-out rates are AED 80-150 per sqft for basic work, AED 150-300 per sqft for mid-spec work and AED 300-500 per sqft for luxury or highly specified interiors. By size, a unit of up to 500 sqft is indicatively AED 60,000-130,000. A unit of 500-1,500 sqft is AED 130,000-300,000, and a unit of 1,500-5,000 sqft is AED 300,000-700,000. Dubai Science Park is a TECOM Group free-zone community. That means plans normally go to the free-zone authority, the Dubai Development Authority (DDA), rather than to Dubai Municipality, after the community has consented to the works. Dubai Civil Defence fire and life-safety approval typically takes 5-10 working days. A DEWA connection or load modification typically takes 7-14 working days. These steps run partly in parallel, so the durations should not be added together. First Unicorn Interiors handles the whole approval chain in-house, from the community NOC to final Civil Defence inspection. All figures are indicative ranges only. Final cost depends on finish level, materials sourcing, structural complexity and the approval cycle, and is confirmed only after an on-site survey.

Which permits does a warehouse in Dubai Science Park need?

Most warehouse fit-outs in Dubai Science Park start with consent from TECOM Group community management. Drawings then go to the free-zone authority, the Dubai Development Authority, which reviews them in place of Dubai Municipality in most free-zone cases. Where a plot or scope does fall under Dubai Municipality, building or fit-out plan approval typically takes 10-15 working days. Dubai Civil Defence must approve the fire and life-safety design, which typically takes 5-10 working days. That covers sprinklers, fire alarm, emergency lighting, exit routes and any high-piled racking. If you are adding cold rooms, heavy HVAC or new production equipment, DEWA must approve the connection or load change, typically within 7-14 working days. Several of these reviews overlap, so the total is shorter than the sum of the individual steps. Overall approval risk for this scope is medium. It rises when a tenant changes the unit's use, for example from dry storage to chemical storage or lab use. That change triggers a fuller fire-safety review.

How long does a Dubai Science Park warehouse fit-out take?

Programme length depends mainly on floor area. Indicative fit-out timelines are 4-6 weeks for a small unit up to 500 sqft and 6-10 weeks for a 500-1,500 sqft unit. A larger 1,500-5,000 sqft facility takes 10-16 weeks. These timelines cover the build. They assume approvals have been secured, or are moving in parallel with procurement. On the approvals side, the bottlenecks are usually Dubai Civil Defence comments on fire-fighting layouts and DEWA scheduling for load upgrades, which take 5-10 and 7-14 working days respectively. Free-zone authority review and the TECOM community NOC add to this, depending on how complete the submission is. Long-lead items also move the dates. These include insulated panels, rapid-roll doors, mezzanine steel and specialist ventilation, because they cannot be fabricated until drawings are approved. The most reliable way to protect your handover date is to fix the racking layout and equipment schedule before design is frozen, because a late change to either reopens the Civil Defence and DEWA submissions.

What drives the cost per sqft of a warehouse fit-out in Dubai Science Park?

The headline range runs from AED 80 to AED 500 per sqft, and three things decide where a project falls within it. The first is specification tier. Basic work, at AED 80-150 per sqft, covers lighting, power, partitioning and a simple office pod. Mid-spec work, at AED 150-300 per sqft, adds air-conditioned office or pick zones, better flooring and upgraded fire systems. Luxury or high-spec work, at AED 300-500 per sqft, suits temperature-controlled, clean or lab-grade spaces of the kind common among Dubai Science Park's life-sciences occupiers. The second is finish level and community tier. Both increase cost proportionally across the whole scope rather than as a fixed add-on. The third is structural complexity: mezzanines, floor strengthening for racking loads, new openings and roof penetrations for extraction all push costs towards the upper end of the range. Fit-out is a different scope from building a new pre-engineered steel shell, and the two are priced separately. Every figure is indicative and is confirmed only after an on-site survey.

Fitting out an industrial unit in Dubai Science Park: costs, permits and timelines

An industrial unit in Dubai Science Park sits inside a TECOM Group free zone, so fitting it out follows a different approval route from a mainland warehouse. In most cases your drawings are reviewed by the free-zone authority, the Dubai Development Authority (DDA), rather than Dubai Municipality. That changes who approves your drawings, who inspects the work and how the timeline runs. You will also need Civil Defence approval for fire and life safety, which typically takes 5-10 working days, and a DEWA connection or modification, which typically takes 7-14 working days. These steps run partly in parallel, so don't add their durations together. Units in the park are used for laboratories, light manufacturing, life-science storage and research logistics. Each use changes the specification: floor loading, HVAC capacity, clean or controlled zones, racking layout and fire suppression. Commercial fit-out is priced by floor area, not by rooms. Indicative rates are AED 80-150 per sqft for a basic fit-out, AED 150-300 per sqft for mid-spec and AED 300-500 per sqft for high-specification finishes. For a large unit of 1,500-5,000 sqft, the indicative range is AED 300,000-700,000, delivered over 10-16 weeks. On the mainland, DLD and RERA rules govern lease registration. Science Park tenancies are run through the free zone instead, so get your landlord's fit-out guidelines before design starts. First Unicorn Interiors prepares the full submission package in-house and backs its work with a 3-year warranty. All figures are indicative and are confirmed only after an on-site survey.

How much does it cost to fit out an industrial unit in Dubai Science Park?

Fit-out cost depends on floor area and specification, not on how many rooms you need. Indicative per-sqft rates fall into three bands: AED 80-150 for a basic fit-out, AED 150-300 for mid-spec, and AED 300-500 for luxury or high-specification work. By unit size, the indicative totals are AED 60,000-130,000 for units up to 500 sqft, AED 130,000-300,000 for 500-1,500 sqft, and AED 300,000-700,000 for 1,500-5,000 sqft. Where your project lands within a band depends on a few things. Sealed or easy-clean surfaces for lab and life-science tenants cost more than plain storage finishes. Upgraded HVAC or extra electrical load can add DEWA modification work. Fire suppression must match what you plan to store. Mezzanine or partition structures add structural complexity. Sourcing materials locally rather than importing them also affects price. These are indicative ranges only. The final figure depends on finish level, materials sourcing, structural complexity and the approval cycle, and is confirmed only after an on-site survey of your unit.

Which permits and approvals does a Dubai Science Park industrial unit need?

Dubai Science Park is a free zone, so for most fit-outs the free-zone authority, the Dubai Development Authority (DDA), handles plan approval in place of Dubai Municipality. Where a Dubai Municipality building or fit-out plan approval does apply, allow 10-15 working days. Every unit needs Civil Defence approval for fire and life safety, which typically takes 5-10 working days. This approval covers sprinklers, alarms, emergency lighting and escape routes, and it gets stricter for chemical or hazardous storage. If you add power, change the load or reconfigure the supply, you need a DEWA connection or modification, which typically takes 7-14 working days. DHA approval, at 15-25 working days, applies only if the unit includes aesthetic or medical treatment rooms. Standard labs and storage do not trigger it. These approvals run partly in parallel, so don't add their durations together. Overall approval risk for this type of project is medium. The most common cause of delay is drawings that don't match the landlord's fit-out guidelines, so check those guidelines before you submit.

How long does an industrial unit fit-out take in Dubai Science Park?

Indicative build timelines depend on unit size. Units up to 500 sqft typically take 4-6 weeks, units of 500-1,500 sqft take 6-10 weeks, and units of 1,500-5,000 sqft take 10-16 weeks. These periods cover work on site. The approval stage comes before them and partly overlaps with design. Civil Defence (5-10 working days) and DEWA (7-14 working days) usually run alongside the free-zone authority review, so the approval stage is shorter than the sum of its parts. Three things decide whether you hit the lower or upper end of each range. First, lead times on specialist equipment such as cleanroom panels, industrial HVAC or racking. Second, whether the unit's existing services can take your planned load without a DEWA modification. Third, how many rounds of comments your drawings get from the authorities. Submitting a complete, guideline-compliant package first time is the best way to protect your schedule. First Unicorn Interiors handles approvals in-house and runs design and permit work in parallel wherever the authorities allow it.