Fixed-price warehouse construction for Dubai South businesses — from AED 350/sqft. Dubai South approvals handled in-house. Free 3D design. 3-year warranty across 800+ UAE projects.
Quick Answer · Dubai South
Building a warehouse in Dubai South costs roughly AED 350–600 per sqft of GFA — about AED 3.5M–6M for a 10,000 sqft warehouse. Cold stores and specialist facilities are quoted per project. A warehouse build takes 6–16 months including design, the Dubai South zone NOC, Dubai Municipality permits and a Civil Defence fire approval. PEB steel frame, engineered heavy-duty slab, fixed price from a real BOQ, 3-year warranty.

Dubai South's Logistics District sits beside Al Maktoum International Airport, with plots aimed at air-freight, e-commerce and contract-logistics warehouses. Sites are typically new builds on clear plots, which makes PEB steel structures, insulated envelopes and large dock and yard areas the norm. The permitting route depends on the plot — Dubai South's planning authority or Dubai Municipality — and we confirm it from your affection plan before design starts.
| Warehouse size (GFA) | Cost (AED) | Typical facility |
|---|---|---|
| 5,000–10,000 sqft | 1,750,000–6,000,000 | Small warehouse or light-industrial unit |
| 10,000–25,000 sqft | 3,500,000–15,000,000 | Logistics warehouse |
| 25,000 sqft and above | From 8,750,000 | Large distribution warehouse |
| Cold store / specialist | Priced per project | Insulated, temperature-controlled or hazardous storage |
Warehouse construction runs AED 350–600 per sqft of GFA depending on size, clear height, insulation and MEP. Programmes, including design and approvals: a standard PEB shed takes 6–9 months, an insulated logistics warehouse 9–12 months and a cold store 12–16 months. Authority fees are paid at cost.
Dubai South planning authority or Dubai Municipality — confirmed from the affection plan
Plot-use approval and master-plan design rules
Fire-system design and high-pile storage approval
Load approval, substation and connections
See also our warehouse construction guide for Dubai.
After 800+ UAE projects we see the same problems in Dubai South again and again. Here's what goes wrong — and how we fix every one.
Warehouse cost lives in the steel tonnage, slab spec and cladding. We price your shed line-by-line — PEB frame, slab, envelope, MEP — and fix it, so you can compare like for like, not vague rates.
An industrial build in Dubai South needs Dubai Municipality approval plus the zone/free-zone NOC, DEWA and a Civil Defence fire-system sign-off (heavier for high-pile storage). We run them in parallel so occupation isn't delayed.
An under-designed floor fails fast under point loads. We design the slab to the racking and forklift loading, with the right joints and power-floated finish.
PEB steel and insulated panels carry real lead times. We engineer and order early, and sequence erection so the programme holds.
Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.
| What You Get | First Unicorn Interiors | Typical Dubai Provider |
|---|---|---|
| Pricing Model | ✓ Fixed price quoted upfront | ✗ Hourly billing or % of build cost |
| First-Time Quality | ✓ 98% pass first review/inspection | ✗ 40-60% industry average |
| Turnaround Time | ✓ Industry-leading delivery time | ✗ 2-3x slower typical |
| Authority Approvals | ✓ All handled in-house | ✗ Charged extra, often outsourced |
| Community NOCs | ✓ All included in package | ✗ Charged AED 5K-15K per NOC extra |
| Same Team End-to-End | ✓ Yes — single point of accountability | ✗ Hand-off to multiple teams |
| Warranty | ✓ 3-year warranty on all work | ✗ 1 year industry standard |
| Response Time | ✓ 60 minutes during business hours | ✗ 1-3 business days typical |
| Free Consultation + Site Visit | ✓ Yes, free anywhere in Dubai | ✗ AED 2,500-5,000 typical fee |
| Revisions & Resubmissions | ✓ Unlimited revisions included | ✗ Usually 2 rounds, then charged extra |
| Quality of warehouse construction | ✓ Premium materials + expert craftsmanship | ✗ Standard materials, generic execution |
| Construction Coordination | ✓ 70% fewer site issues vs industry | ✗ Frequent change orders + RFIs |
Warehouse Construction done right in Dubai South is about community know-how, the right materials, and one accountable team. Here's how we deliver.
Pre-engineered steel design, fabrication and erection — clear-span sheds sized to your operation, not a catalogue.
Dubai Municipality permit, Dubai South zone/free-zone NOC, DEWA and Civil Defence fire approval secured in parallel.
Heavy-duty power-floated slab designed to your racking and forklift loads — no cracking, correct joints and falls.
Steel tonnage, slab, envelope, docks and MEP priced line-by-line — roughly AED 350–600/sqft GFA.
High-pile storage, sprinklers, smoke vents and access designed to Civil Defence code from day one.
Steel, slab, envelope, MEP and docks under one contract to completion certificate — 3-year warranty.
Transparent Dubai South pricing across three tiers. All include free 3D design, community NOC handling and a 3-year warranty.
A proven process refined across 800+ UAE projects, tuned to Dubai South's community and approval requirements.
We assess your Dubai South industrial plot, intended use and loads, and build a real BOQ. Free.
PEB structural design, slab and MEP drawings, fire strategy, fixed itemised quote.
Dubai Municipality permit, Dubai South zone NOC, DEWA and Civil Defence fire approval secured in parallel.
Foundations, heavy-duty slab, then PEB frame erection and roof/wall cladding.
Electrics, fire system, docks and roller shutters, testing, Civil Defence sign-off and completion certificate.
Dubai South is the master-planned logistics and aviation zone around Al Maktoum International Airport. Warehouse permits go through the Dubai South planning authority or Dubai Municipality (depending on the plot), plus Civil Defence and DEWA. Here's exactly what your project needs.
Dubai South (Dubai Aviation City Corporation) — Logistics District, Dubai.
the Dubai South planning authority or Dubai Municipality (depending on the plot), plus Civil Defence and DEWA.
AED 4,000–18,000 — paid to the authority, never marked up by us.
Logistics warehouse, Light-industrial unit, Labour-accommodation + facility.
20,000–150,000 · master-planned industrial
Master-planned logistics and aviation zone. Logistics District plots next to Al Maktoum International Airport, built to Dubai South design rules plus Civil Defence and DEWA approvals.
We handle all of it in-house — NOC processing, building permits and municipality approvals for Dubai South.
Dubai South is governed by the Dubai South planning authority or Dubai Municipality (depending on the plot), plus Civil Defence and DEWA. We secure every approval for you, in parallel, before work starts.
Building permit and completion certificate for mainland industrial plots
Planning NOC and design approval where the plot sits inside a free or special zone
Fire-system design, racking and high-pile storage approval
Load approval, substation and water connections
Soil investigation, PEB/steel design checks and third-party inspection
Building completion certificate and Civil Defence final inspection before occupation
Real warehouse construction work delivered in and around Dubai South — fixed price, community-approved, warrantied.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.

Warehouse Construction delivered in Dubai South — fixed price, Dubai South approvals handled, 3-year warranty.
Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.
Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.
Indicative for Dubai South · fixed quote after free visit
Real stages and finishes from warehouse construction work delivered in and around Dubai South.






Transparent track record. Updated quarterly. No marketing fluff — just numbers.
The questions Dubai South owners ask most. Don't see yours? WhatsApp us — answered within 60 minutes.
Building a warehouse in Dubai South typically costs AED 350–600 per sqft of GFA, depending on size, clear height, insulation and MEP. Cold stores and specialist facilities are quoted per project. We quote fixed from a real BOQ after a free feasibility visit.
A standard PEB shed takes 6–9 months, an insulated logistics warehouse 9–12 months, and a cold store or specialist facility 12–16 months, including design, NOCs and Dubai Municipality permits. We give a written programme up front.
Dubai Municipality building-permit approval plus the Dubai South zone or free-zone NOC, DEWA connection and a Civil Defence fire-system approval (heavier for high-pile storage). We secure all of it in-house, in parallel.
Yes — we build insulated-panel cold stores with vapour sealing, refrigeration MEP, dock levellers and the fire and racking systems they require, commissioned turnkey.
Yes — we design the floor slab to your actual racking point loads and forklift axle loads, with the correct joint layout, falls and power-floated finish, so it doesn't crack or dust.
Yes — after a feasibility visit we issue a fixed, itemised BOQ-based quote covering steel, slab, envelope, docks and MEP. Changes are priced transparently before any work.
Dubai South is governed by the Dubai South planning authority or Dubai Municipality (depending on the plot), plus Civil Defence and DEWA. An approval/NOC (typically AED 4,000–18,000) is required before work starts. As Dubai South's projects have specific rules, we prepare the submission to match — and handle the full approval in-house.
Yes — we regularly work on Dubai South properties including Logistics warehouse, Light-industrial unit, Labour-accommodation + facility. With plots typically 20,000–150,000 sqft, we know the zone design rules, power-load and fire-system requirements these facilities need and where the common issues are.
Before you build — the approvals you'll need:
Free UAE renovation tools
Free design visit anywhere in Dubai South. Fixed price from AED 350/sqft. Dubai South community NOC handled. 3-year warranty. 60-minute response.