Civil Works

Roads, drainage, utilities, and infrastructure — the groundwork for every development.

800+ Projects
15+ Years UAE
In-House Team
Municipality Licensed
1-Year Warranty
The Challenge

Infrastructure Is the Foundation That Nobody Sees — Until It Fails

A beautifully finished building sitting on poorly graded land with inadequate drainage will flood in the first rain. A development without properly designed utility infrastructure will face chronic issues with water pressure, electrical capacity, and sewage flow. Dubai's rapid development pace means these problems are more common than they should be.

The challenge with civil works in Dubai is the combination of flat terrain, high water tables, extreme heat, and the need to coordinate with multiple utility authorities simultaneously. DEWA, Etisalat, Dubai Municipality drainage, RTA — each has their own submission requirements, inspection schedules, and connection timelines. Managing these parallel workstreams while keeping the main construction programme on track requires experienced coordination.

We treat civil works as the critical path they are, not as an afterthought to be rushed at the end of a project. Proper grading, well-designed drainage, correctly installed utilities, and durable roads and hardscape are what separate a development that performs from one that requires constant maintenance.

Civil works, Dubai
What We Deliver

Complete Civil Works Capability

Every element of site infrastructure — from grading to utility connections — delivered by experienced civil engineering teams.

🛣

Road Construction

Internal access roads, parking areas, service roads, and pedestrian pathways. Sub-base preparation, base course, asphalt, kerbing, road markings, and signage — all built to RTA standards and master developer specifications.

💧

Drainage Systems

Storm water drainage networks, surface water collection, soakaways, attenuation tanks, and connections to the municipal drainage network. Designed for Dubai's rainfall patterns and flat terrain with appropriate gradients and capacity.

Utility Installation

Electrical duct banks and cable laying, water supply networks, sewer connections, telecommunications ducting, and district cooling connections. All utility installations coordinated with DEWA, Etisalat, and relevant authorities.

🏔

Grading & Earthworks

Site clearing, cut and fill operations, compaction, and final grading. Every site is graded to ensure positive drainage away from buildings, proper road profiles, and compliance with approved levels drawings.

🌳

Landscaping

Hard landscaping including interlocking pavers, natural stone, and concrete finishes. Soft landscaping with irrigation systems designed for Dubai's climate. Boundary planters, feature areas, and common space greening.

🧱

Boundary Walls

Reinforced concrete and block boundary walls, precast concrete panels, and decorative wall systems. Including foundations, damp-proofing, rendering, and finishes. Designed to community standards and master developer guidelines.

Our Work

Civil Works Projects

Investment Guide

Civil Works Pricing

Indicative ranges based on development size, scope of infrastructure, and site conditions. Every project receives a detailed quotation based on civil engineering drawings.

Small Development

AED 500K – 1.5M

Villa plots and small residential developments with basic infrastructure requirements.

  • Site grading and levelling
  • Boundary walls
  • Driveway and parking
  • Storm water drainage
  • Utility connections (DEWA, Etisalat)
  • Landscaping and irrigation
  • External lighting
Get a Quote

Large Development

AED 5M+

Extensive developments with complex infrastructure, multiple utility networks, and master-plan coordination.

  • Major road construction
  • Complex drainage engineering
  • Sub-station and transformer pads
  • District cooling connections
  • Extensive landscaping programme
  • Multi-authority coordination
  • Phased infrastructure delivery
Get a Quote
Our Process

Civil Works Methodology

1

Survey & Design

Topographic survey, existing utility mapping, civil engineering design, and authority submissions. We confirm levels, drainage routes, and utility connection points before mobilising.

2

Enabling Works

Site clearing, demolition of existing structures (if required), temporary facilities, and site establishment. Dewatering and temporary drainage installed where needed.

3

Infrastructure

Grading, utility trenching and installation, drainage network, road sub-base and base, kerbing, asphalt, boundary walls, and hard landscaping. Each element tested and inspected before covering.

4

Completion

Soft landscaping, irrigation commissioning, external lighting, signage, authority inspections, utility commissioning, and as-built documentation. Site handed over with all infrastructure operational.

Common Questions

Civil Works FAQ

For villa plots and small developments, we provide site grading and levelling, internal road construction, storm water drainage, sewer connections to the municipal network, water supply connections, electrical duct banks and cable laying, telecommunications ducting, boundary walls and fencing, hard and soft landscaping, and external lighting. We coordinate all utility connections with DEWA, Etisalat, and the relevant municipality.
Dubai's flat terrain and high water table make drainage design critical. We design gravity-fed systems with appropriate gradients, install soakaways and attenuation tanks where required, connect to the municipal storm water network, and provide pumped solutions for below-grade areas. All designs comply with Dubai Municipality drainage regulations and are tested before handover.
Yes. We construct internal access roads, parking areas, service roads, and pedestrian pathways. This includes sub-base preparation, base course, asphalt laying, kerbing, road markings, signage, and speed control measures. All road works comply with RTA standards and master developer requirements.
Yes. Utility coordination is one of the most time-consuming aspects of civil works in Dubai. We manage the full process: DEWA applications for water and electricity, Etisalat applications for telecommunications, Dubai Municipality for sewer and drainage connections, and district cooling providers where applicable. Our team handles submissions, inspections, and connection commissioning.
For a small villa development, civil works typically take 2 to 4 months. Medium developments with internal roads and multiple utility connections require 4 to 8 months. Large developments with extensive infrastructure can take 8 to 14 months. These timelines run in parallel with building construction where possible to minimise overall project duration.

Need Civil Works for Your Development?

Share your site plan and infrastructure requirements. We will review the scope and provide a detailed quotation.