First Unicorn Structures
FOUNDATIONS · CONCRETE · STEEL · RETROFIT
Major structural works in Dubai construction project with concrete pouring and rebar
★ FOUNDATIONS · CONCRETE · STEEL · BIM · PE OVERSIGHT

Structural Works Done Right. BS + ACI Standards.

Premium structural works as standalone contractor — foundations, concrete, steel, retrofit. BS + ACI international standards. Senior PE oversight. 5-year structural warranty. For developers, EPCs, and main contractors.

PALM JUMEIRAHStructural reinforcement — beachfront villa
EMIRATES HILLSColumn & beam strengthening — mansion
DUBAI HILLSFoundation repair & underpinning
ARABIAN RANCHESLoad-bearing wall modification
AL BARARISteel structure fabrication & erection
200+Projects Built
FixedPrice Quotes
DM/DCDApprovals
AED 5MInsurance
60-MinResponse
4.9★127 Reviews
THE PROBLEM

Why Most Dubai Structural Subcontractors Cause Project Delays

After 100+ structural projects (standalone + as part of full builds), here's why structural delays are the #1 cause of project schedule slip — and how proper engineering eliminates them.

The hidden cost of cheap structural quotes: Most structural subcontractors quote low using inadequate rebar, undersized columns, missing shear walls. Mistakes discovered during inspection cause demolition + rework worth millions. Premium engineering pays back 10-100x.

Inadequate Engineering Causes Major Rework

Cheap quotes use generic structural design without site-specific analysis. Result: discovered issues during inspection, requiring demolition. We engineer to site-specific BS + ACI standards from start.

Concrete Quality Issues Surface in 5-10 Years

Substandard concrete (wrong mix, improper curing, alkali-silica reaction) causes settlement, cracks, structural issues 5-10 years later. We use grade-tested concrete + proper curing protocol.

Foundation Mistakes Sink Buildings

Inadequate foundation depth, undersized footings, improper soil testing — Dubai's saline soil amplifies these issues. We do mandatory geotechnical testing + senior PE foundation review.

Rebar Corruption Costs Owners Millions

Substandard rebar (low yield, missing tying, wrong placement) causes structural failures. We source from approved suppliers with mill certificates + on-site QC every pour.

SIDE-BY-SIDE

First Unicorn Structures vs. Typical Dubai Structural Sub

Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.

What You Get First Unicorn Structures Typical Dubai Provider
Pricing Model Fixed price quoted upfront Hourly billing or % of build cost
First-Time Quality 98% pass first review/inspection 40-60% industry average
Turnaround Time Industry-leading delivery time 2-3x slower typical
Authority Approvals All handled in-house Charged extra, often outsourced
Community NOCs All included in package Charged AED 5K-15K per NOC extra
Same Team End-to-End Yes — single point of accountability Hand-off to multiple teams
Warranty 3-year warranty on all work 1 year industry standard
Response Time 60 minutes during business hours 1-3 business days typical
Free Consultation + Site Visit Yes, free anywhere in Dubai AED 2,500-5,000 typical fee
Revisions & Resubmissions Unlimited revisions included Usually 2 rounds, then charged extra
Quality of structural works Premium materials + expert craftsmanship Standard materials, generic execution
Construction Coordination 70% fewer site issues vs industry Frequent change orders + RFIs
WHY 100+ DUBAI PROJECTS CHOSE US

8 Reasons First Unicorn Structures Wins

Structural works are mission-critical. Here's how we deliver consistently for developers, EPCs, and main contractors.

Senior PE Oversight Standard

Senior Professional Engineer (PE) reviews all designs + critical pours. 15+ years Dubai experience. Engineering accountability.

Geotechnical Testing Mandatory

Site-specific soil testing before foundation design. Bearing capacity, settlement, soil chemistry. Critical for Dubai's saline conditions.

BIM Structural Modeling

BIM Level 2 structural models. Coordination with architectural + MEP. Clash detection. Quantity takeoff accuracy.

BS + ACI International Standards

British Standards (BS) for design + American Concrete Institute (ACI) for concrete work. Internationally accepted standards.

On-Site QC Every Pour

Senior structural engineer present at every concrete pour. Slump tests, cube tests sent to certified labs. Documentation maintained.

Retrofit + Strengthening Specialty

Existing building retrofitting, column jacketing, FRP wrapping, additional shear walls. Often more complex than new build.

5-Year Structural Warranty

5-year structural warranty (vs UAE-mandated 10-year for major defects). Quality differentiator.

Free Engineering Review

Free review of existing engineering drawings, quote analysis, clash check. Pay only when you commit to construction.

TRANSPARENT PRICING

Structural Works Packages — Quoted Fixed

Three packages: standalone foundation/concrete to full structural with retrofit.

Premium + Retrofit Specialty

AED 600 – 2,000+/sqft
Premium · Retrofit specialty
  • Everything in Full +
  • Existing building retrofitting
  • Column jacketing + FRP wrapping
  • Additional shear walls (in existing)
  • Seismic strengthening
  • Foundation underpinning
  • Specialty concrete (high-strength, fiber)
  • Steel composite construction
  • Heritage building structural
Retrofit Quote →
Pricing per sqft of structural area. Geotechnical + BIM included in all packages. Free engineering review within 7 days.
OUR PROCESS

From Free Engineering Review to Structural Handover

A proven 6-stage process refined across 100+ Dubai structural projects.

1

Free Engineering Review + Quote

Day 1-7 · FREE

Review of existing drawings, geotechnical recommendation, BIM compatibility check, fixed-price quote within 7 days.

2

Engineering Design + BIM

Day 7-30

Site-specific structural design, geotechnical testing, foundation design, frame design, BIM Level 2 modeling, MEP coordination, senior PE review.

3

Procurement + Mobilization

Day 21-45 · Parallel

Approved supplier rebar (mill certificates), concrete supplier setup, formwork system, equipment mobilization, site setup.

4

Excavation + Foundation

Day 45-120

Excavation per soil report, shoring if needed, foundation execution (raft, piles, footings), waterproofing, basement walls (if applicable). Daily QC.

5

Superstructure

Day 120-360+

Floor-by-floor structural frame execution, columns, beams, slabs, shear walls. Senior PE present at critical pours. Cube testing per ACI.

6

Structural Handover + Documentation

End + 5-Year Warranty

As-built drawings, BIM model handover, concrete cube test reports, QA/QC documentation, structural certificate. 5-year warranty active.

STRUCTURAL EXPERTISE

Engineering Standards + Capabilities

International engineering standards. Senior Professional Engineer oversight. Comprehensive structural capabilities.

British Standards (BS)

Design code for structural elements

ACI 318

American Concrete Institute design code

ACI 301

Concrete construction specifications

AISC Steel

American Institute of Steel Construction

BIM Level 2

Building Information Modeling standard

ISO 9001 QMS

Quality Management Systems

Senior PE Oversight

Professional Engineer review

Foundations: Raft + Piles

Spread footings, raft, drilled piles, micropiles

Concrete: Grade 30-80

Standard to high-strength concrete

Post-Tensioned Slabs

For long spans + reduced thickness

Steel Composite

Steel + concrete composite construction

Retrofit + Strengthening

Column jacketing, FRP, underpinning

98% first-submission approval rate · 800+ projects · Zero rejections beyond second submission in last 5 years
RECENT PROJECTS

Structural Works Across Dubai

Six recent structural projects (standalone + as part of full builds). Each delivered to BS + ACI standards.

Major foundation works Dubai
DUBAI MARINA

Marina Tower Foundation

Major foundation work for G+15 mixed-use tower. Deep raft foundation with shoring. Geotechnical-driven design. Senior PE oversight every pour.

DeepRaft
GeotechnicalDriven
PEOversight
Heavy rebar reinforcement Dubai
BUSINESS BAY

Business Bay Tower Rebar

Dense rebar reinforcement for column connections. ACI tying standards. Mill certificates verified. On-site QC every section.

ACITying
MillCertificates
On-SiteQC
Concrete pouring Dubai
DOWNTOWN DUBAI

Downtown Tower Concrete Pour

Major concrete pour for 30,000 sqft floor slab. Grade 50 concrete. Cube tests sent to BlueGrass certified lab. PE present.

Grade50
CubeTests
CertifiedLab
Steel structural work Dubai
DIFC

DIFC Steel Composite Structure

Steel composite construction for premium office tower. Large steel beams + concrete encasement. AISC standards.

SteelComposite
AISCStandards
PremiumOffice
Concrete formwork Dubai
AL FURJAN

Al Furjan Aluminum Formwork

Modern aluminum formwork system for G+8 residential. Reusable system, faster floor cycle (5-day cycle vs 7-day standard).

AluminumFormwork
5-DayCycle
FasterSchedule
Structural retrofit Dubai
JUMEIRAH

Jumeirah Heritage Retrofit

Heritage building structural retrofit: column jacketing, FRP wrapping, additional shear walls. Heritage compliance maintained.

HeritageCompliant
ColumnJacketing
FRPWrapping
View Full Portfolio →
INSTANT ESTIMATE

Structural Works Cost Calculator

Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.

Estimate Your Structural Works Cost

Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.

AED 400 – 800/sqft

Full structural package · 6-month execution

Get Exact Quote on WhatsApp

CLIENT REVIEWS

What 100+ Dubai Developers + Contractors Say

4.9/5 from 127 verified reviews. Recent structural projects:

★★★★★

"We engaged First Unicorn for foundation + structural frame on our G+15 Marina tower. Zero structural issues at handover. Cube tests all exceeded spec. Senior PE oversight every pour was the differentiator."

RA
Rashid A. Marina · G+15 Foundation + Frame
★★★★★

"Heritage building retrofit in Jumeirah — column jacketing, FRP wrapping, additional shear walls. Maintained heritage facade while strengthening structure. Engineering complexity handled flawlessly."

SK
Sarah K. Jumeirah · Heritage Retrofit
★★★★★

"Aluminum formwork system delivered 5-day floor cycles vs the 7-day cycles we got from previous contractors. Saved 5 weeks on overall schedule. Quality identical or better."

AM
Ahmed M. Al Furjan · G+8 Aluminum Formwork
REAL-TIME PROOF

Live Performance — Last 90 Days

Transparent track record. Updated quarterly. No marketing fluff — just numbers.

12
Structural projects active
100%
Pass rate on cube tests
0
Structural defects in 7 years
4.9★
Average client rating

Recent Wins

  • Marina · G+15 foundation + frame ✓ All cube tests passed
  • Business Bay · Tower rebar ✓ ACI standards
  • Downtown · 30,000 sqft slab ✓ Grade 50 verified
  • DIFC · Steel composite tower ✓ AISC standards
  • Al Furjan · 5-day cycle formwork ✓ Schedule beat
  • Jumeirah · Heritage retrofit ✓ Strengthened
  • JBR · Foundation underpinning ✓ Stabilized
CERTIFICATIONS & MEMBERSHIPS
DM ApprovedDubai Municipality registered consultant
DDA RegisteredDubai Development Authority approved
Trakhees ListedPalm Jumeirah / freehold zone approved
800+ ProjectsAcross UAE since inception
4.9★ Google127 verified reviews
At a Glance

Structural works in Dubai by First Unicorn Structures start at AED 50,000 for basic foundations, AED 150,000 for concrete pouring in villas, and AED 200,000 for steel fabrication. Compliant with BS and ACI standards, projects include PE oversight and 5-year warranty. Typical timelines are 4-8 weeks for foundations and 6-12 weeks for full steel structures, serving developers and EPCs with fixed-price quotes.

Key facts
  • Premium structural works from AED 50K, covering foundations, concrete, steel, and retrofits in Dubai.
  • BS + ACI standards with senior PE oversight; 5-year structural warranty included.
  • 200+ projects completed; fixed-price quotes and AED 5M insurance coverage.
  • 60-minute response time; 4.9★ rating from 127 reviews.
  • DM/DCD approvals handled; BIM and engineering for delay-free projects.

Quick answers

What is the cost of foundation work in Dubai?
Basic foundation work for a villa starts at AED 50,000 to AED 100,000, including excavation and pouring. For larger structures or underpinning, costs range from AED 120,000 to AED 250,000. All quotes are fixed-price with no hidden fees.
How long does a structural works project take?
Small foundation repairs take 1-2 weeks. Standard villa concrete and steel works require 4-6 weeks. Full retrofit or steel erection projects span 8-12 weeks, depending on scope and approvals.
What permits are needed for structural works in Dubai?
Dubai Municipality (DM) issues building permits and NOCs for structural modifications. DEWA approval is required for any electrical integrations. For community-specific works, master developers like Emaar or Nakheel provide additional approvals.
What standards do you follow for concrete works?
We adhere to BS EN 206 for concrete quality and ACI 318 for structural design. All mixes are tested to 30-50 MPa strength, ensuring durability in Dubai's climate. Over 150 concrete projects completed without defects.
How much does steel structure fabrication cost?
Steel fabrication and erection for a standard villa extension costs AED 150,000 to AED 300,000. Includes design, welding, and installation per BS 5950 standards. 100+ steel projects with zero structural failures.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.
FREQUENTLY ASKED

Everything Dubai Developers Ask About Structural Works

15 most common questions. WhatsApp us for anything else — answered within 60 minutes.

How much do structural works cost in Dubai? +

AED 250/sqft (standalone foundation + concrete) to AED 2,000+/sqft (premium with retrofit). 3-tier: Standalone (AED 250-500/sqft), Full Structural (AED 400-800/sqft), Premium + Retrofit (AED 600-2,000/sqft).

What standards do you follow? +

British Standards (BS) for design, American Concrete Institute (ACI 318/301) for concrete, AISC for steel. ASHRAE for related MEP. ISO 9001 for quality management. International standards accepted by DM.

Do you do standalone structural (subcontractor)? +

Yes — common scenario. Many main contractors hire us as structural subcontractor while handling architectural + MEP themselves. We deliver structural per their schedule.

What about retrofit + strengthening? +

Yes — retrofit specialty. Column jacketing, FRP wrapping, additional shear walls, foundation underpinning, seismic strengthening, heritage compliance. More complex than new build.

Do you handle deep foundations? +

Yes — raft foundations, drilled piles (concrete + steel), micropiles, spread footings. Geotechnical-driven design. Senior PE oversight. UAE saline soil expertise.

What concrete grades do you use? +

Grade 30 (residential), Grade 40-50 (commercial), Grade 60-80 (premium high-strength), specialty fiber concrete for specific applications. Mix designs verified by certified labs.

Do you handle post-tensioned slabs? +

Yes — post-tensioned slabs for long spans (8m+) and reduced thickness. Common in commercial + parking podiums. Engineering + execution in-house.

Can you handle steel composite construction? +

Yes — steel composite (steel + concrete) for premium commercial. AISC standards. Often used in long-span lobbies, mezzanines, structural transfers.

What about BIM modeling? +

Yes — BIM Level 2 standard. Architectural + structural + MEP coordination. Clash detection eliminates issues. Owner gets structural BIM model at handover.

Do you have geotechnical capabilities? +

Yes — geotechnical testing in-house (drilling + lab analysis) or coordinated with certified lab. Soil bearing, settlement analysis, soil chemistry. Critical for Dubai's saline conditions.

Can you handle structural underpinning? +

Yes — underpinning for foundation strengthening or extension below existing foundation. Specialty work requiring senior structural review. Common for heritage + extension projects.

What QC do you provide? +

On-site QC every concrete pour: slump tests, cube tests sent to certified labs (BlueGrass, Inspectorate, Bureau Veritas). Mill certificates for all rebar. Documentation maintained per ISO 9001.

Do you provide structural insurance? +

Yes — AED 5M+ project-specific structural insurance. 5-year structural warranty (vs UAE-mandated 10 years). Errors + omissions insurance for engineering.

What documentation do you provide at handover? +

As-built drawings, BIM model, concrete cube test reports (all pours), rebar mill certificates, QA/QC documentation per ISO 9001, structural certificate, geotechnical reports. Comprehensive package.

How do I get started? +

WhatsApp +971 58 565 8002 with project details — location, building type, BUA target, scope (full structural or specific element). Free engineering review within 7 days, fixed-price quote within 7 days.

Get Structural Works to BS + ACI Standards. Senior PE Oversight.

Free engineering review, fixed-price quote in 7 days. 100+ structural projects. BS + ACI standards. Senior PE oversight standard.

Sun-Thu 9am-6pm GST · Free site visit anywhere in Dubai · 60-min response