Updated 2026-06-26 — Latest 2026 prices and availability
The average shower renovation cost in Dubai typically ranges from AED 8,000 for a basic upgrade to AED 35,000 for a luxury enclosure, including tiling, waterproofing, and new fixtures. Factors like material choice, size, and complexity of plumbing work influence the final price. First Unicorn Interiors offers transparent pricing and a 3-year warranty on all shower renovation projects, completed in 5-10 working days.
Faded walls, patchy finishes, builder-grade paint? We transform your villa with premium paints and professional preparation. From AED 8,000.
All prices include labour, materials, and project management. No hidden fees. Get a fixed-price quote for your specific project.
New tiling, vanity, fixtures, fresh look. No layout changes. 2-3 weeks.
Full renovation with premium finishes, walk-in shower, freestanding bath option. 3-5 weeks.
Complete redesign with imported materials, underfloor heating, smart fixtures. 4-6 weeks.
Every project is different. Here are the main factors that determine your final cost.
Local porcelain: AED 50-100/sqm. Premium imported: AED 150-400/sqm. Natural marble: AED 300-800/sqm.
Standard (RAK/Duravit): AED 3K-8K set. Premium (Villeroy & Boch, TOTO): AED 10K-20K set.
Standard glass: AED 2K-5K. Frameless walk-in: AED 5K-10K. Custom configurations: AED 8K-15K.
Off-the-shelf: AED 2K-5K. Custom built with stone top: AED 5K-12K. Imported designer: AED 10K-25K.
Essential and non-negotiable. Membrane + testing: AED 2K-5K per bathroom. This prevents leaks that cause AED 20K+ in damage.
Standard fixture replacement: AED 3K-5K. Full pipe relocation: AED 5K-12K. Underfloor heating: AED 3K-8K addition.
Planning a bathroom renovation? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

From a simple guest powder room refresh to a full luxury master bathroom renovation -- here are the 2026 Dubai prices.
| Bathroom Type | Cost Range | What's Included |
|---|---|---|
| Guest / Powder Room | AED 15,000 -- 30,000 | New tiles, vanity, toilet, basin, mirror. Standard fixtures. 2-3 weeks. |
| Master Bathroom | AED 35,000 -- 65,000 | Premium tiles, walk-in shower, double vanity, bathtub option, full waterproofing. 3-4 weeks. |
| Luxury Spa Bathroom | AED 65,000 -- 120,000+ | Imported marble, rain shower, freestanding tub, heated floors, smart toilet, custom joinery. 4-6 weeks. |
Most Dubai villas have 3-5 bathrooms. Renovating multiple bathrooms together saves 10-15% on total cost.
Every bathroom quote is broken down into these key components so you see exactly where your money goes.
| Component | Standard | Premium |
|---|---|---|
| Wall & Floor Tiling | AED 3,000 -- 8,000 | AED 8,000 -- 25,000 |
| Sanitaryware & Fixtures | AED 3,000 -- 8,000 | AED 10,000 -- 25,000 |
| Vanity Unit | AED 2,000 -- 5,000 | AED 5,000 -- 15,000 |
| Glass Shower Enclosure | AED 2,000 -- 5,000 | AED 5,000 -- 12,000 |
| Waterproofing | AED 2,000 -- 3,500 | AED 3,500 -- 5,000 |
| Plumbing | AED 2,000 -- 5,000 | AED 5,000 -- 12,000 |
| Electrical & Lighting | AED 1,500 -- 3,000 | AED 3,000 -- 8,000 |
Waterproofing is non-negotiable -- skipping it risks AED 20,000+ in water damage to floors below.
See it before you build it
Free 3D design concept for your bathroom renovation — based on 800+ completed Dubai projects.
A single bathroom renovation typically takes 2-3 weeks. Multiple bathrooms can run in parallel to save time.
Strip old tiles, fixtures, and vanity. Apply waterproofing membrane and perform 48-hour flood test.
Rough-in plumbing. Install floor tiles, wall tiles, and grouting. Precision cuts around fixtures.
Install vanity, toilet, shower enclosure, taps, mirrors. Connect all plumbing.
Silicone sealing, accessories, lighting, final testing. Deep clean and handover.

Send us your floor plan or photos on WhatsApp. We will reply with a detailed fixed-price quote within 24 hours. Free site visit included.
Bathroom renovation in Dubai costs AED 15,000 to AED 120,000 in 2026, depending on size and finishes. Basic 5 sqm updates start at AED 25,000 for plumbing and tiling, while luxury 20 sqm spa-like bathrooms reach AED 100,000 including smart fixtures. First Unicorn Interiors provides 3-year warranty on all projects.
What will yours cost?
Get a personalised estimate in 60 seconds with our renovation calculator.
Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.
Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.
External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.
We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.
Vanity renovation cost in Dubai typically ranges from AED 8,500 for a simple powder-room refresh to AED 28,000 for a full master-bathroom vanity upgrade with stone tops, LED mirrors and custom cabinetry. First Unicorn Interiors handles everything from material selection to final handover, including Dubai Municipality drawings and DEWA electrical approvals. Most projects in Jumeirah, Arabian Ranches or Dubai Hills take 12–18 working days once permits are cleared. Clients should budget an extra 15 % for any hidden plumbing or waterproofing work discovered after demolition. All vanity packages include a 3-year workmanship warranty and are quoted in AED only.
A luxury vanity using imported marble or quartz in Dubai starts at AED 14,500 for a 120 cm single-bowl unit and climbs to AED 24,000 when double bowls, integrated sinks and back-lit mirrors are added. First Unicorn Interiors sources slabs directly from Italy and India, cutting lead times to 10–14 days. Installation includes moisture-proof marine-ply carcasses, soft-close drawers and LED lighting tied into the existing DEWA circuit. In Palm Jumeirah or Emirates Hills, additional RERA-compliant waterproofing membranes add AED 1,800. The entire scope is delivered with stamped Dubai Municipality drawings and a 3-year warranty.
Any vanity renovation that alters plumbing, electrics or waterproofing requires Dubai Municipality approval plus NOC from the master developer. First Unicorn Interiors prepares architectural drawings, DEWA load calculations and RERA declarations within 5–7 working days. In freehold communities such as Dubai Hills or Tilal Al Ghaf, an extra DLD file is lodged for record. Turnaround for stamped permits averages 10–12 days. Projects inside ready villas can often proceed with a minor-works permit only, saving AED 2,500 in fees. All submissions are handled in-house to keep the vanity renovation cost transparent and on schedule.
From signed quotation to final clean-up, a standard vanity renovation takes 18–22 calendar days. Week one covers demolition, waterproofing and rough-in; week two is cabinetry installation and stone templating; week three finishes tiling, mirror mounting and DEWA inspection. First Unicorn Interiors uses a 40-40-20 AED payment schedule: 40 % on approval, 40 % on cabinet delivery, 20 % on handover. Clients in JLT or Business Bay receive daily progress photos via WhatsApp +971 58 565 8002. Any delay caused by late material arrival is absorbed by the company, keeping the vanity renovation cost fixed.
Shower renovation cost in Dubai typically ranges from AED 25,000 to AED 65,000 for a standard 4–6 m² wet area, depending on whether you choose basic ceramic, porcelain, or premium marble finishes. First Unicorn Interiors handles the full scope: demolition, waterproofing to Dubai Municipality standards, new concealed piping, linear or square drain installation, and DEWA-compliant electrical upgrades for rain showers or steam units. Most projects in communities such as Jumeirah Village Circle, Arabian Ranches, or Dubai Hills Estate are completed in 12–18 working days once permits are secured. Owners must obtain a renovation NOC from the master developer (Emaar, Nakheel, or DAMAC) plus Dubai Municipality building-permit approval before work begins. The quoted price includes removal of existing tiles, new concealed cistern if required, anti-slip flooring, LED niche lighting, and a 3-year workmanship warranty. Budget AED 8,000–12,000 extra if structural waterproofing repairs or relocation of drainage lines are discovered after opening the floor.
Material choice is the largest variable. Basic imported porcelain tiles with a linear drain cost AED 25,000–32,000. Moving to large-format marble or sintered stone with niche LED lighting and thermostatic rain shower pushes the budget to AED 45,000–65,000. Labour and waterproofing add another AED 6,000–9,000. Hidden costs appear when existing waterproofing has failed or drainage needs re-routing; these repairs can add AED 4,000–7,000. Community rules also matter: Emaar and Nakheel projects require specific approved contractors and charge NOC fees of AED 1,500–3,500. Dubai Municipality inspection fees are AED 750–1,200. First Unicorn Interiors provides a fixed-price contract after site inspection so owners avoid surprise variation orders.
A straightforward shower renovation is finished in 12–15 working days. The sequence includes 2 days demolition and waterproofing, 3–4 days tiling and plumbing rough-in, 2 days for DEWA electrical inspection if new circuits are added, and 3 days for grouting, sealing, and final cleaning. Before work starts, the owner must secure a renovation permit from Dubai Municipality (AED 750–1,200) and an NOC from the master developer (AED 1,500–3,500). RERA-registered contractors must also file a brief scope with the building management. First Unicorn Interiors manages all submissions; clients only sign the application forms. In freehold communities such as Dubai Hills or Jumeirah Golf Estates, additional architectural review can extend approval by 5–7 days, so total lead time from contract to site start is usually 10–14 calendar days.
Yes. Combining the shower with vanity, toilet, and flooring upgrades saves on mobilisation fees and reduces total downtime. A complete 8–10 m² bathroom renovation in Dubai starts at AED 45,000 for mid-range finishes and reaches AED 85,000–110,000 for luxury marble and smart toilets. The shower area itself remains AED 25,000–35,000 within this package. First Unicorn Interiors coordinates DEWA disconnection, Dubai Municipality inspections, and developer NOC under one permit, shortening the overall timeline to 18–22 working days. Owners in apartments benefit from single-access logistics; villa owners may need separate soakaway approval if drainage is altered. The 3-year warranty covers all wet-area waterproofing and tiling workmanship across the entire bathroom scope.
Bathroom renovation cost Dubai 2026 ranges from AED 25,000 for a standard 4–6 m² guest bathroom to AED 55,000–75,000 for a master suite with wet-room shower, freestanding tub and smart controls. Prices include full demolition, waterproofing, new plumbing, electrical upgrades, tiling, vanity, mirror cabinet and final finishes. Most Dubai Municipality approvals are handled by First Unicorn Interiors; typical turnaround is 10–14 working days for NOC and building-permit issuance in communities such as Jumeirah Village Circle, Arabian Ranches and Dubai Hills. DEWA disconnection/reconnection fees average AED 850–1,200 and must be scheduled before waterproofing works begin. A 3-year workmanship warranty covers all waterproofing membranes, tiling and sanitaryware installation. Average project duration is 18–25 calendar days from permit approval to handover.
Any bathroom renovation exceeding simple cosmetic updates requires Dubai Municipality approval plus NOC from the master developer. First Unicorn Interiors prepares architectural drawings, structural calculations if walls are moved, and DEWA electrical/plumbing layouts. Submission to Dubai Municipality typically takes 7–10 days; once approved, a building permit is issued within another 3–5 days. In freehold communities such as DAMAC Hills or Emaar South, an additional RERA-registered developer NOC costs AED 1,500–3,000. DLD notification is mandatory only when the renovation value exceeds AED 50,000. Skipping permits risks fines of AED 5,000–20,000 and potential reversal orders.
From permit approval to final inspection, a standard bathroom renovation takes 18–25 days. Demolition and waterproofing consume days 1–4; plumbing and electrical rough-in days 5–8; tiling and waterproofing test days 9–13; vanity, fixtures and painting days 14–18; and final DEWA reconnection plus Dubai Municipality inspection days 19–22. In high-rise buildings with limited service hours, add 3–5 days. First Unicorn Interiors provides a day-by-day schedule and guarantees completion within the quoted timeline or compensates AED 300 per late day under the 3-year warranty terms.
Expect 15–20 % contingency beyond the base AED 25,000–75,000 quote. Common extras include asbestos testing (AED 1,800), structural beam checks if relocating soil pipes (AED 4,500–7,000), new DEWA meter upgrade (AED 2,200), marble threshold replacement (AED 1,200–2,800), and silent exhaust fan upgrade to meet Dubai Green Building Regulations (AED 950). In older Jumeirah properties, corroded cast-iron stacks often require full replacement at AED 6,000–9,000. First Unicorn Interiors includes a transparent allowance schedule so clients avoid mid-project surprises.
Toilet renovation cost in Dubai typically ranges from AED 25,000 to AED 45,000 for a standard 3x4 meter bathroom, depending on the scope of work, materials, and permits required. This includes demolition, waterproofing, plumbing, tiling, fixtures, and labor. For luxury finishes like marble or smart toilets, costs can exceed AED 60,000. Timelines average 15-25 working days, but delays may occur due to Dubai Municipality approvals or building NOC processing. First Unicorn Interiors handles all permits, including DEWA connections and RERA compliance, with a 3-year warranty on workmanship. Key factors affecting price: community regulations (e.g., Emaar, Nakheel), structural changes requiring Dubai Municipality approval, and material import costs. Always budget 10-15% contingency for unforeseen issues like plumbing upgrades or mold remediation.
The average cost for a standard toilet renovation in Dubai is AED 25,000 to AED 35,000 for a mid-range finish, including standard tiles, vanity, toilet, shower, and labor. For premium materials like porcelain tiles, branded fixtures (e.g., Grohe, Hansgrohe), and custom joinery, expect AED 35,000 to AED 50,000. Luxury renovations with marble, heated floors, and smart toilets can reach AED 60,000+. Prices exclude structural changes, which require additional permits and engineering fees (AED 3,000–5,000). First Unicorn Interiors provides fixed-price quotes with no hidden charges.
For a toilet renovation in Dubai, you typically need: 1) NOC from the building owner or master developer (e.g., Emaar, Nakheel, Damac) – processing takes 3-7 days and costs AED 500–2,000. 2) Dubai Municipality building permit if structural changes (e.g., moving walls, plumbing rerouting) – fee AED 1,000–3,000, plus engineering drawings (AED 2,000–4,000). 3) DEWA approval for electrical/plumbing modifications – AED 500–1,000. 4) RERA compliance for contractor registration. First Unicorn Interiors manages all paperwork, ensuring no fines or delays.
A typical toilet renovation in Dubai takes 15-25 working days. Breakdown: demolition and waste disposal (2-3 days), waterproofing and plumbing (3-5 days), tiling and flooring (4-6 days), electrical and lighting (2-3 days), fixture installation (2-3 days), and finishing touches (2-3 days). Delays can occur due to NOC processing (3-7 days), material availability, or unforeseen structural issues. First Unicorn Interiors guarantees project completion within the agreed timeline or offers a discount.
A glimpse of current First Unicorn projects — interiors, kitchens, bathrooms, pools and glasswork.
All projects →