Kitchen Renovation Cost Dubai 2026
Faded walls, patchy finishes, builder-grade paint? We transform your villa with premium paints and professional preparation. From AED 8,000.
Kitchen Renovation Cost Dubai 2026
All prices include labour, materials, and project management. No hidden fees. Get a fixed-price quote for your specific project.
Budget Kitchen Refresh
Cabinet refacing, new countertops, splashback, painting. Keep existing layout. 3-4 weeks.
- Cabinet door replacement
- New countertops (engineered stone)
- Splashback tiling
- Fresh paint
- New handles & fixtures
Standard Kitchen Renovation
New custom joinery, stone countertops, appliance integration, flooring. 5-7 weeks.
- Custom built cabinetry
- Natural stone countertops
- Full appliance integration
- New flooring
- Plumbing & electrical upgrades
Premium Kitchen Build
Complete redesign with island, premium brands, smart storage, luxury finishes. 6-8 weeks.
- Island with waterfall countertop
- Imported materials (Gaggenau, Miele)
- Smart pull-out storage systems
- Under-cabinet LED lighting
- Full MEP overhaul
What Affects the Price?
Every project is different. Here are the main factors that determine your final cost.
Cabinet Material
MDF with spray finish: AED 800-1,200/m. Solid wood: AED 1,500-2,500/m. Imported European: AED 3,000+/m.
Countertop Choice
Engineered quartz: AED 400-800/sqft. Natural marble: AED 600-1,200/sqft. Dekton/Neolith: AED 800-1,500/sqft.
Appliances
Mid-range (Bosch/Siemens): AED 15K-25K set. Premium (Miele/Gaggenau): AED 40K-80K set. Supplied by us at trade pricing.
Layout Changes
Moving plumbing or electrical adds AED 5K-15K. Moving gas connection adds AED 3K-8K. Island installation adds AED 10K-20K.
Flooring
Porcelain tiles: AED 80-150/sqm installed. Natural stone: AED 200-400/sqm. Wood-look tiles: AED 100-200/sqm.
Timeline
A kitchen renovation without layout changes: 3-4 weeks. With layout changes and new plumbing: 5-7 weeks. Full redesign with island: 6-8 weeks.
Kitchen Renovation Cost by Finish Level
Four tiers to match every budget. All include design, labour, materials, and a 3-year warranty.
| Tier | Cost Range | What You Get |
|---|---|---|
| Budget Kitchen | AED 35,000 -- 55,000 | Laminate cabinets, quartz countertops, standard fixtures, basic tiling |
| Mid-Range | AED 55,000 -- 85,000 | Solid wood cabinets, quartz/granite countertops, Grohe fixtures, porcelain tiling |
| Premium | AED 85,000 -- 150,000 | Custom cabinets, marble countertops, integrated appliances, LED lighting |
| Luxury | AED 150,000 -- 300,000+ | Italian design, natural stone, Gaggenau/Miele appliances, smart features, island |
Prices based on a typical 12-15 sqm kitchen. Larger kitchens or layout changes will adjust the cost. Get your exact quote
Kitchen Renovation Cost Breakdown by Component
Understand where every dirham goes. Cabinetry is the biggest expense, typically 40-50% of total cost.
| Component | Cost Range | % of Total |
|---|---|---|
| Cabinetry | AED 15,000 -- 80,000 | 40-50% |
| Countertops | AED 5,000 -- 40,000 | 10-15% |
| Appliances | AED 8,000 -- 60,000 | 15-20% |
| Plumbing & Fixtures | AED 3,000 -- 15,000 | 5-8% |
| Electrical | AED 2,000 -- 8,000 | 3-5% |
| Tiling & Backsplash | AED 3,000 -- 12,000 | 5-8% |
| Flooring | AED 4,000 -- 15,000 | 5-8% |
Kitchen Renovation Timeline: 4-6 Weeks
A typical kitchen renovation takes 4-6 weeks from demolition to handover. Here is the week-by-week breakdown.
Week 1: Demolition & Preparation
Strip out old kitchen, remove tiles and flooring. Prepare plumbing and electrical rough-ins.
Week 2: MEP & Tiling
Complete plumbing and electrical. Install floor and wall tiles, backsplash.
Week 3-4: Cabinetry & Countertops
Install cabinets, fit countertops (templated and fabricated during weeks 1-2). Mount sink and fixtures.
Week 5: Appliances & Finishing
Install all appliances, LED lighting, handles, soft-close mechanisms. Paint touch-ups.
Week 6: Snagging & Handover
Quality inspection, snagging fixes, deep clean. Kitchen handed over ready to use.
Explore More Renovation Costs
Get Your Exact Price in 24 Hours
Send us your floor plan or photos on WhatsApp. We will reply with a detailed fixed-price quote within 24 hours. Free site visit included.
Kitchen Renovation Cost Dubai 2026 — FAQ
Frequently Asked Questions About Kitchen Renovation Cost
How much does kitchen renovation cost cost in Dubai?
Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.
How long does kitchen renovation cost take in Dubai?
Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.
Do I need permits or NOC for kitchen renovation cost?
External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.
Do you use subcontractors?
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.
What warranty do you provide?
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.
Which communities in Dubai do you cover?
We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.
