Plan your Dubai pool build with realistic 2026 costs for shell works, waterproofing, filtration, tiling, approvals and landscape integration.
All prices include labour, materials, and project management. Fixed-price quotes — no hidden fees.
Compact pool 3x4m or 4x5m. Perfect for smaller gardens. Cooling dip + visual feature. 6-8 weeks.
Family pool 5x8m or 6x10m. Steps, shallow end, proper depth. Most popular choice. 8-12 weeks.
Vanishing edge, overflow, or custom shape. Integrated spa/jacuzzi. Architectural statement. 10-16 weeks.
3x4m plunge: AED 80-120K. 5x8m standard: AED 120-200K. 6x12m large: AED 200-350K. 8x15m+ Olympic: AED 400K+. Price scales roughly with volume of water.
Concrete (most durable, most expensive): AED 120K+. Steel panel: AED 80-150K. No fiberglass — we build to last. Concrete is the Dubai standard.
Standard porcelain: AED 150-250/sqm. Glass mosaic: AED 300-600/sqm. Natural stone: AED 400-800/sqm. Pool interior tiling typically AED 15K-40K.
Basic filtration: AED 8K-15K. Premium (variable speed pump, salt chlorinator): AED 15K-25K. Heating (heat pump): AED 8K-15K. Automatic cover: AED 15K-30K.
Pools must be rear/side garden only. 1m minimum setback from all walls. Underground plant equipment. Child safety barriers required. No pools on townhouses.
Monthly maintenance: AED 500-1,000. DEWA (water + pump electricity): AED 300-600/month. Chemical costs: AED 200-400/month. Annual equipment service: AED 1,500-3,000.
Planning a pool construction? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

From compact plunge pools to custom infinity designs -- here are the 2026 Dubai prices for pool construction.
| Pool Type | Typical Size | Cost Range |
|---|---|---|
| Plunge Pool | 3 x 2m | AED 55,000 -- 80,000 |
| Standard Family | 8 x 4m | AED 80,000 -- 120,000 |
| Lap Pool | 12 x 3m | AED 100,000 -- 150,000 |
| Infinity / Custom | Custom | AED 150,000 -- 400,000+ |
| Renovation / Retiling | Existing pool | AED 25,000 -- 80,000 |
All prices include excavation, structure, tiling, filtration, and commissioning. Get your personalised quote
Both have their place, but concrete dominates the Dubai market for good reason.
| Factor | Concrete | Fibreglass |
|---|---|---|
| Cost | AED 80K -- 400K+ | AED 55K -- 120K |
| Build Time | 6-12 weeks | 2-3 weeks |
| Customisation | Fully custom shape & size | Pre-set shapes only |
| Durability | 30+ years | 15-20 years |
| Finish Options | Tile, mosaic, stone, plaster | Gel coat (limited colours) |
| Resale Value | High -- preferred in Dubai | Moderate |
| Dubai Suitability | Recommended | Suitable for small plots |
We build concrete pools exclusively. Concrete handles Dubai's heat, soil movement, and high water table better than fibreglass.
See it before you build it
Free 3D design concept for your pool construction — based on 800+ completed Dubai projects.
Budget AED 3,000 -- 8,000 per year for maintenance, depending on pool size and whether you use a service contract.
| Item | Monthly Cost | Annual Cost |
|---|---|---|
| Professional Maintenance (weekly visit) | AED 300 -- 800 | AED 3,600 -- 9,600 |
| Chemicals (chlorine, pH balancers) | AED 150 -- 400 | AED 1,800 -- 4,800 |
| DEWA (water + pump electricity) | AED 200 -- 500 | AED 2,400 -- 6,000 |
| Annual Equipment Service | -- | AED 1,500 -- 3,000 |
| Total Annual Running Cost | -- | AED 3,000 -- 8,000 |

Every villa community in Dubai requires a No Objection Certificate (NOC) before pool construction. We handle the entire process.
| Developer | NOC Timeline | Key Requirements |
|---|---|---|
| Nakheel (Palm, Jumeirah Islands) | 4-6 weeks | Structural drawings, 1m setback, rear/side garden only, child safety barrier |
| Emaar (Emirates Hills, Dubai Hills) | 3-5 weeks | Architectural drawings, landscape plan, underground equipment room |
| DAMAC (DAMAC Hills, Akoya) | 3-4 weeks | Plot boundary clearance, structural engineer report, safety fencing |
| Meraas / Dubai Holding | 4-6 weeks | Full engineering package, DM approval, landscape integration plan |
We handle all NOC applications, drawings, and engineer reports as part of our service. NOC fees (AED 2,000-5,000) are separate from construction cost.
What will yours cost?
Get a personalised estimate in 60 seconds with our renovation calculator.
WhatsApp us your floor plan or photos. Fixed-price quote within 24 hours. Free site visit included for projects over AED 10,000.
Swimming pool construction in Dubai costs AED 55,000–400,000+ in 2026, depending on size, type, and features. Basic 4x8m concrete pools start at AED 55K for residential installs, while luxury infinity-edge designs exceed AED 300K. First Unicorn Interiors provides end-to-end builds with 3-year warranty, including permits from Dubai Municipality.
Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.
Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.
External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.
We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.
A glimpse of current First Unicorn projects — interiors, kitchens, bathrooms, pools and glasswork.
All projects →How much does it cost to build a pool in Dubai? In 2026, the average cost to build a swimming pool in Dubai ranges from AED 145,000 for a basic 8m x 4m concrete pool to AED 500,000+ for a luxury infinity or glass-walled design. This price typically includes excavation, structural works, waterproofing, tiling, filtration, and basic lighting, but excludes landscaping, pool house, heating, and advanced automation. For a standard villa pool in communities like Arabian Ranches, Emirates Hills, or Palm Jumeirah, expect to pay between AED 180,000 and AED 350,000 fully installed. Timelines vary from 6 to 12 weeks for a simple pool, while complex designs can take 4-6 months. Dubai Municipality requires a building permit for any pool construction, and you must also obtain NOC from your master developer (e.g., Nakheel, Emaar, Damac) and approval from DEWA for electrical connections. At First Unicorn Interiors, we handle all approvals and construction, offering a 3-year warranty. Contact us on WhatsApp +971 58 565 8002 for a detailed quote.
Several factors influence the final price. Size and depth are primary: a 6m x 3m pool starts around AED 120,000, while a 10m x 5m pool costs AED 200,000+. Type matters—concrete pools are more expensive than vinyl or fiberglass, but are more durable and customizable. Location within Dubai affects logistics and permits; communities like Palm Jumeirah may have stricter regulations and higher delivery fees. Additional features such as heating (AED 15,000–30,000), saltwater systems (AED 10,000–20,000), infinity edges (AED 50,000+), glass panels (AED 100,000+), and LED lighting (AED 5,000–15,000) add up. Landscaping and decking can add 20-30% to the total. Also, if your property has difficult soil or limited access, excavation costs rise. Always get a detailed quotation that includes all permits and engineering fees.
Yes, hidden costs often include municipality fees (AED 2,000–5,000), engineering/design fees (AED 5,000–15,000), NOC fees from the master developer (AED 500–2,000), and DEWA connection charges (AED 1,000–3,000). You may also need a civil defense approval if your pool is indoors or has specific safety features. Additionally, if your property is in a villa community, you might need to pay a security deposit to the community management. Always budget an extra 10-15% for contingencies. At First Unicorn Interiors, we include all necessary permits in our package, so you don't face surprise costs. We handle Dubai Municipality approvals and coordinate with your developer.
The typical timeline is 8-16 weeks for a standard pool. The process starts with a site survey and design (1-2 weeks), followed by permit approvals (2-4 weeks), then excavation and structural works (2-4 weeks), plumbing and electrical (1-2 weeks), tiling and finishing (1-2 weeks), and finally equipment installation and testing (1 week). For complex designs, add 4-6 weeks. Throughout, we ensure compliance with Dubai Municipality regulations and DEWA standards. We provide a project manager who updates you weekly. After completion, we offer a 3-year warranty on all works, and we can assist with pool maintenance contracts.
Yes please, you want a swimming pool in your Dubai villa — and you want to know what it will cost. For a new residential pool in 2026, the indicative range is AED 145,000-400,000, depending on size, finish, and complexity. A standard 8x4m pool with a skimmer typically falls in the AED 145,000-200,000 tier, while a lap or oversized family pool ranges AED 200,000-280,000, and an infinity or luxury pool with a balance tank can reach AED 280,000-400,000. These figures are indicative only; final cost is confirmed after an on-site survey. In Dubai, you must also factor in approvals. Depending on your community, you may need Dubai Municipality approval (10-15 working days), a DEWA connection (7-14 days), and a master developer NOC (10-20 days for Emaar, Nakheel, or Damac). For communities like Palm Jumeirah or Jebel Ali, Trakhees approval takes 15-25 days. If you live in Damac Hills, the DAMAC NOC via the DAMAC Living app takes 5-15 days and may involve an admin fee of AED 1,050-5,000 and a security deposit of AED 5,000-20,000. The entire process, from approval to completion, typically takes 6-16 weeks. First Unicorn Interiors handles design, approvals, and construction, with a 3-year warranty. Call us on WhatsApp +971 58 565 8002 for a survey-based quote.
Building a pool in Dubai requires several approvals, depending on your location. For villa communities under Dubai Municipality, you need building plan approval (10-15 working days) and a DEWA connection or modification (7-14 days). If you live in a master-planned community like Emaar, Nakheel, or Damac, you must obtain a master developer NOC (10-20 days). For Palm Jumeirah or Jebel Ali, Trakhees approval is required (15-25 days). In Damac communities, the DAMAC NOC via the DAMAC Living app takes 5-15 days, with an admin fee of AED 1,050-5,000 and a security deposit of AED 5,000-20,000. Note that some approvals run in parallel, so total time is not the sum. For example, Dubai Municipality and DEWA can be processed simultaneously. Always check with your community management for specific requirements.
The timeline for a new residential pool in Dubai is typically 6-16 weeks, depending on the tier. A standard pool (AED 145,000-200,000) takes 6-10 weeks, a lap or large pool (AED 200,000-280,000) takes 8-12 weeks, and an infinity or luxury pool (AED 280,000-400,000) takes 12-16 weeks. This includes construction, but not the approval period, which can add several weeks. For example, Dubai Municipality approval takes 10-15 working days, and a master developer NOC takes 10-20 days. In Damac communities, the NOC takes 5-15 days. To avoid delays, ensure all approvals are secured before construction begins. First Unicorn Interiors manages the entire process, from design to handover, ensuring timely completion.
Yes, renovating an existing pool is a cost-effective option. For a renovation or refurbishment, the indicative range is AED 30,000-100,000, with a timeline of 3-6 weeks. This includes resurfacing, retiling, and upgrading plant equipment. Renovation is exempt from the minimum new-build cost of AED 145,000. However, you still need approvals for structural changes, such as Dubai Municipality approval (10-15 working days) and possibly a master developer NOC (10-20 days). If your pool is in a Damac community, the DAMAC NOC is required (5-15 days). Renovation is ideal if your pool structure is sound but needs aesthetic or mechanical upgrades. First Unicorn Interiors specializes in pool renovation, ensuring quality workmanship with a 3-year warranty.
Swimming pool construction in Dubai is a licensed structural package — excavation, reinforced shell, waterproofing, tiling, plant room and commissioning — not a landscaping add-on. First Unicorn Interiors prices a new residential pool at AED 145,000-400,000 over 6-16 weeks. A standard skimmer pool of about 8x4m is AED 145,000-200,000 and 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 and 8-12 weeks. An overflow or infinity pool with a balance tank is AED 280,000-400,000 and 12-16 weeks. Landscaping is often paired. A new pool costs more than resurfacing an existing shell. These are indicative ranges only. Final cost depends on finish level, materials sourcing, structural complexity and developer approval cycle, confirmed only after an on-site survey. Architectural design, engineering drawings and 3D visualisation precede the municipality file. Work cannot start until Dubai Municipality issues building plan approval (10-15 working days) and, in freehold villas, Emaar, Nakheel or Damac issues a master-developer NOC (10-20 working days). Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions take 15-25 working days. DAMAC Hills 1 routes through DDA; Damac Hills 2 through Dubai Municipality. DEWA connection or modification takes 7-14 working days; Civil Defence fire and life safety takes 5-10 working days. Several run partly in parallel — do not sum them. Dubai Land Department title and RERA community by-laws sit behind those NOCs. First Unicorn Interiors files the drawings and warrants the works for 3 years. WhatsApp +971 58 565 8002.
A new-build residential pool from First Unicorn Interiors is never priced below AED 145,000. The published band is AED 145,000-400,000, and the right place inside that band is the pool type, not a guess. A standard skimmer pool of about 8x4m is AED 145,000-200,000. A lap pool or oversized family pool is AED 200,000-280,000. An overflow or infinity pool with a balance tank is AED 280,000-400,000. Finish level, villa size and community grade move the same design up or down without creating a new headline figure: a larger plot and a luxury specification cost more; a compact essential finish costs less. Landscaping is often paired with the pool package, which is why a garden-only quote is not a construction quote. These are indicative ranges only. Final cost depends on finish level, materials sourcing, structural complexity and developer approval cycle, confirmed only after an on-site survey. If you already have a pool, resurfacing, retiling and plant upgrades are a different job at AED 30,000-100,000 over 3-6 weeks — not a new build. WhatsApp +971 58 565 8002 for a survey.
Swimming pool construction is building works. Dubai Municipality building and fit-out plan approval takes 10-15 working days and is the core municipal gate. Civil Defence fire and life safety review takes 5-10 working days. DEWA connection or modification takes 7-14 working days. In Emaar, Nakheel and Damac freehold communities the master-developer NOC takes 10-20 working days and sits alongside, not instead of, municipality. Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions take 15-25 working days. DAMAC Hills 1 applications route to DDA; Damac Hills 2 route to Dubai Municipality. DAMAC Living-app NOCs take 5-15 working days, with an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000 against common-area damage and overruns. Damac Hills 2 also needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC, and Al Sa'fat 2.0 sustainability statements are required for structural additions over 50% BUA. Several of these clocks run partly in parallel — do not sum them. Dubai Land Department title and RERA community by-laws determine who must sign. First Unicorn Interiors files the architectural and engineering drawings. Approval risk is medium.
New swimming pool construction runs 6-16 weeks of site works after drawings and NOCs are in motion. A standard skimmer 8x4m pool is 6-10 weeks. A lap pool or oversized family pool is 8-12 weeks. An overflow or infinity pool with a balance tank is 12-16 weeks because the weir, balance tank and plant room add structure, waterproofing and commissioning. Approval risk is medium: Dubai Municipality (10-15 working days), master-developer NOC (10-20 working days) and, on the Palm or in Jebel Ali, Trakhees (15-25 working days) often overlap the early programme. DEWA (7-14 working days) and Civil Defence (5-10 working days) sit on the same parallel track. Do not add those days to the construction weeks. If the shell, structure and set-out already exist, renovation-refurbishment is the cheaper path: resurfacing, retiling and plant upgrades at AED 30,000-100,000 over 3-6 weeks. That is not a new build and sits below the AED 145,000 new-pool floor because the excavation and shell are already there. First Unicorn Interiors warrants the works for 3 years. Figures as of 17 August 2026 are indicative and confirmed only after survey. WhatsApp +971 58 565 8002.