Apartment Renovation Dubai

200+ apartment renovations completed across Downtown, Marina, JBR, Business Bay and beyond. High-rise expertise, premium results.

Interior — First Unicorn Interiors project, Dubai

Ready to Transform Your Apartment?

200+ apartment renovations. We handle building approvals, logistics and everything in between.

Living — First Unicorn Interiors project, Dubai

Explore More

Renovation Services

Swimming PoolKitchen RenovationBathroom RenovationVilla RenovationGlass & AluminiumSolar PanelsLandscapingFlooring

Villa Communities

Palm JumeirahArabian RanchesEmirates HillsDubai HillsDAMAC HillsTilal Al Ghaf
At a Glance

Apartment renovation in Dubai by First Unicorn Interiors starts at AED 50,000 for basic updates, AED 100,000+ for full modernizations including kitchen and bathroom overhauls, and takes 4-8 weeks depending on scope. With over 800 projects completed, they provide 3-year warranties on all workmanship.

Key facts
  • Apartment renovations start at AED 50K for 1-bedroom units, up to AED 200K for luxury 3-bedroom fits.
  • Process includes DM approvals and NOC processing, typically 2-4 weeks for permits.
  • In-house team handles design, 3D visualization, and full fit-outs with 800+ projects experience.
  • Kitchen remodels from AED 45K, bathrooms from AED 25K, backed by 3-year warranty.
  • Contact via WhatsApp +971 58 565 8002 for free quotes and site visits.

Quick answers

How much does apartment renovation cost in Dubai?
Basic apartment renovation costs AED 50,000 to AED 80,000 for a 1-bedroom unit including painting and flooring. Mid-range full renovations range from AED 100,000 to AED 150,000 covering kitchen and bathroom updates. Luxury projects exceed AED 200,000 with custom joinery and smart home integrations.
How long does apartment renovation take in Dubai?
Small-scale apartment updates take 2-4 weeks for cosmetic changes like painting and lighting. Standard full renovations require 4-6 weeks including fit-outs and minor structural work. Large luxury projects span 6-8 weeks with approvals and custom installations.
What permits are needed for apartment renovation in Dubai?
Apartment renovations require Building Permit and No Objection Certificate (NOC) from Dubai Municipality (DM) for structural changes. DEWA approval is needed for electrical and plumbing modifications. For leased properties, landlord NOC and RERA compliance apply, processed via DM's online portal.
What services are included in apartment renovation?
Services cover architectural design, 3D visualization, interiors fit-outs, kitchen and bathroom renovations starting at AED 45K and AED 25K. Includes electrical, plumbing, flooring, and painting with in-house team execution. Over 800 projects ensure quality within 4-8 weeks.
How does First Unicorn Interiors handle apartment approvals?
They manage full municipality approvals including DM building permits and NOC processing in 2-4 weeks. Engineering drawings and 3D visualizations are prepared in-house. Costs for approvals range AED 5,000-10,000 depending on project scale.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.

Apartment renovation in Dubai — tower-by-tower

Real 2026 prices, NOC rules, working-hours windows and lift-protection requirements by tower cluster — Marina, JBR, JLT, Downtown, Business Bay, DIFC, City Walk and DAMAC Hills. Read the apartment renovation Dubai guide →

Frequently Asked Questions About Apartment Renovation in Dubai

How much does apartment renovation cost in Dubai?

Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.

How long does apartment renovation take in Dubai?

Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.

Do I need permits or NOC for apartment renovation?

External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.

Do you use subcontractors?

No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.

What warranty do you provide?

All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.

Which communities in Dubai do you cover?

We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.

Planning an apartment renovation? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

Related Services & Cost Guides

Villa Renovation Cost Guide → Kitchen Renovation Cost Guide → Bathroom Renovation Cost Guide → Marble Flooring Dubai →
Home Renovation Design Interiors Contracting All Communities Apartments Guides Buying Guides Pricing FAQ Calculator Blog Portfolio Contact Get Quote