Renovation
Overview Full Villa Apartment Kitchen Bathroom Home Cost Guides
Communities
Villa Communities Apartment Areas
Portfolio About Blog Guides Contact
WhatsApp Us

Apartment Renovation in DAMAC Hills

DAMAC Hills apartment renovation — First Unicorn Interiors Dubai

Apartment renovation in DAMAC Hills (Akoya by DAMAC) typically costs AED 55,000–180,000 for studios to 3-bedroom units in Carson, Vita, Loreto and Park Greens towers. Kitchen-only renovations start at AED 45,000, bathrooms at AED 25,000, and full apartment renovations from AED 55,000. DAMAC Properties requires a master-developer NOC before any work starts, and Dubai Municipality permits are needed for any structural, electrical or plumbing change. First Unicorn Interiors handles the full DAMAC NOC + DM approval workflow in-house, typically 14–21 days before site mobilisation.

TL;DR — Key facts
  • Full apartment renovation in DAMAC Hills from AED 55,000 (fixed-price BOQ)
  • Kitchen renovation from AED 45,000 · bathroom from AED 25,000
  • DAMAC master-developer NOC + Dubai Municipality permits handled in-house
  • Typical turnaround 4–10 weeks, including 14–21 day approval phase
  • 3-year workmanship warranty on every project, in-house team of 50+
  • Lead contact +971 58 565 8002 (WhatsApp) — free site visit

Updated 2026-05-14 · First Unicorn Interiors editorial team · Dubai, UAE

15+ Years
UAE Experience
800+ Projects
Delivered
3-Year
Warranty
Why DAMAC Hills is Different

DAMAC Hills Apartments — What Makes Them Unique

DAMAC Hills (formerly Akoya by DAMAC) is a master-planned community in Dubai's southern corridor, sitting along Hessa Street near the Hessa — Emirates Road interchange. While the community is best known internationally for its Trump International Golf Club Dubai and its high-end villa clusters, a very large share of the resident base actually lives in apartment towers — not villas. The apartment-tower clusters include Carson, Vita, Loreto, Park Greens, Bellavista, Golf Promenade, Golf Town, Orchid, Genesis, Park Central, Topanga and Zinnia. Most were handed over between 2017 and 2024, which means the earlier towers (Carson, Vita) are now hitting the 6–8 year mark where original fit-out is starting to age and owners are commissioning full apartment renovations.

The DAMAC Hills apartment renovation market has its own quirks that don't apply to apartments in, say, JBR or Downtown. First, every renovation needs a master-developer NOC issued by DAMAC Properties' Owners' Association department — not just a building NOC. DAMAC's renovation policy is stricter than Emaar's; they require contractor licence verification, third-party insurance certificates and a deposit (typically AED 2,000–5,000) held against any common-area damage. Second, the apartment layouts handed over by DAMAC tend to use a fairly generic developer-grade finish — basic porcelain floor tiles, white melamine kitchen carcasses, mid-tier sanitaryware — so the upgrade path from "developer finish" to "premium owner-occupier finish" is well-trodden. We've renovated apartments across most of the named towers; the typical scope is replacing the kitchen entirely, upgrading both bathrooms, refinishing floors and re-doing the joinery in the master bedroom.

Third, DAMAC Hills sits about 25–30 minutes' drive from central Dubai, which affects logistics. Material deliveries are slower, our site teams stage and store materials on-site (DAMAC permits temporary container storage for licenced contractors), and we typically run a 5-day-a-week schedule rather than 6 to keep crews fresh on the longer commute. That doesn't increase the price — it's just how we plan a DAMAC Hills job realistically. Investor owners (which is a sizeable portion of the apartment stock here) usually opt for a 4-week quick-turn package focused on kitchen, bathrooms and paint, designed to drive up the rental yield. Owner-occupiers typically commission a fuller 6–10 week scope including custom joinery, flooring change and smart-home integration.

Modern apartment renovation living room, Dubai
Key Terms Explained

DAMAC Hills Apartment Renovation Glossary

Master-developer NOC (DAMAC)
A No-Objection Certificate issued by DAMAC Properties Owners' Association before any renovation can start. Required for every apartment in Carson, Vita, Loreto, Park Greens or any other DAMAC Hills tower. Application requires contractor trade licence, contractor insurance, scope drawings and a refundable security deposit.
Building NOC
Issued separately by the specific tower's owners' association after the DAMAC master-developer NOC. Covers timing windows (typically 8 am–6 pm, no Friday morning works), lift-protection rules and access-route restrictions.
Dubai Municipality Building Permit
Required when the renovation touches structural walls, primary plumbing risers, electrical distribution boards or any change in the registered floor plan. Issued by Dubai Municipality's Building Department. Submitted by a Dubai-registered Engineering Consultant.
DEWA approval
Dubai Electricity and Water Authority sign-off required when renovation changes electrical load (e.g. new aircon zones, induction hobs, EV charger). Issued after final electrical drawings are approved.
BUA (Built-Up Area)
The licensed floor area registered against the apartment at Dubai Land Department. Renovations cannot increase BUA in an apartment without DAMAC and DM joint approval, which is rarely granted in apartment towers.
Fit-out vs renovation
A "fit-out" is the first installation on a bare-shell apartment; "renovation" is changing or upgrading an already-fitted apartment. DAMAC Hills handover is fully fitted, so any work post-handover is renovation.
Snagging
The handover-stage walkthrough where the owner lists defects the contractor must rectify before sign-off and warranty activation. We provide a written snag list and rectify within 7 days.
How It Works

The DAMAC Hills Apartment Renovation Process (Step by Step)

  1. Free site visit and brief (Day 0). A senior project lead visits your apartment, takes laser measurements, photographs every surface, and discusses your scope and finishing preferences. We leave with enough information to draft a fixed-price BOQ within 48 hours.
  2. Fixed-price BOQ and 3D visualisation (Days 1–5). We send a line-item Bill of Quantities (no allowances, no provisional sums) plus a full 3D render of the kitchen, bathrooms and any joinery. You sign nothing until you've seen exactly what you're paying for.
  3. DAMAC NOC and DM permit submission (Days 5–25). Once you sign, we submit the master-developer NOC to DAMAC Properties OA and any Dubai Municipality permits required by your scope. DAMAC's NOC turnaround is typically 10–14 working days; DM permits add 5–14 days where structural changes are involved.
  4. Site mobilisation and protection (Day 1 on-site). Lift, corridor and entrance door fully protected with hardboard and plastic sheeting per DAMAC OA rules. Site set-up, dust extraction, waste-management plan in place before any demolition.
  5. Demolition, MEP first-fix, structural changes (Weeks 1–3). Existing fittings stripped, plumbing and electrical first-fix rough-ins, any approved structural changes built. Daily WhatsApp photo updates from our site supervisor.
  6. Wet-area works, tiling, joinery installation (Weeks 3–6). Bathroom waterproofing and tiling, kitchen carcass and worktop install, wardrobe joinery installation. Second-fix MEP follows tiling.
  7. Finishing, snagging and DEWA reconnection (Weeks 6–9). Painting, final fittings, appliance install, deep clean. Internal QC snag, owner snag, rectification within 7 days, DEWA reconnection if isolated.
  8. Handover and 3-year warranty activation (Week 9–10). Final walkthrough, signed handover, warranty document issued covering 3 years on workmanship plus manufacturer warranties on fittings. NOC security deposit reclaimed from DAMAC OA.
Real DAMAC Hills Prices

What an Apartment Renovation Actually Costs in DAMAC Hills

The honest answer: an apartment renovation in DAMAC Hills runs from AED 55,000 for a quick-turn 1-bedroom investor package up to AED 220,000+ for a 3-bedroom owner-occupier premium renovation. The variance comes from three things — size, scope and finish level. Here are real numbers from First Unicorn jobs in Carson, Vita, Loreto and Park Greens over the last 18 months, not made-up "from AED X" marketing prices:

Studio apartment, 450–550 sqft (Carson, Vita): full kitchen replacement plus bathroom upgrade, paint, basic joinery — AED 55,000–85,000 typical. The kitchen alone is usually AED 45,000–55,000 because the footprint is small but quality cabinetry, worktop and appliance integration drive most of the cost.

1-bedroom, 700–900 sqft (Carson, Loreto, Park Greens): kitchen, bathroom, paint, flooring change, master-bedroom wardrobes — AED 75,000–130,000. Adding marble or large-format porcelain flooring instead of standard porcelain adds AED 15,000–25,000.

2-bedroom, 1,100–1,400 sqft (Vita, Bellavista, Golf Promenade): kitchen, two bathrooms, full flooring, all joinery, paint, basic smart-home (lighting, AC, curtains) — AED 110,000–180,000.

3-bedroom, 1,500–1,800 sqft (Park Central, Topanga, Genesis): kitchen, three bathrooms, all flooring, all joinery, full smart-home, premium finishing (book-matched marble, Italian sanitaryware) — AED 170,000–260,000+.

What pushes the price up: book-matched marble (adds AED 25,000–60,000), Italian kitchen brands like Pedini or Boffi (doubles the kitchen cost), full smart-home with lighting/AC/blinds/security (adds AED 25,000–50,000), structural changes requiring DM permit (adds AED 12,000–25,000 in engineering, drawings and longer timeline), bespoke joinery (every linear metre of custom built-in adds AED 1,800–3,500 depending on materials).

What pulls the price down: keeping existing tile in wet areas and just regrouting (saves AED 8,000–15,000 per bathroom), refacing kitchen cabinets instead of full replacement (saves AED 20,000–35,000 but only viable if carcasses are sound), staying within the developer's existing electrical and plumbing layout (no DM permit needed), choosing standard porcelain over marble.

Our quotes are fixed price — no provisional sums, no "subject to site conditions". The number on the BOQ is the number you pay, unless you change scope in writing.

At a Glance

DAMAC Hills Apartment Renovation — What You Get at Each Price Point

Honest ranges for the four most common DAMAC Hills apartment renovation scopes. Prices are 2026 First Unicorn BOQs.

ScopeStudio / 1-bed2-bed3-bedTimeline
Quick-turn (kitchen + bathroom paint refresh, for rental)AED 45K–65KAED 65K–90KAED 90K–120K3–4 weeks
Standard full renovation (kitchen + all bathrooms + paint + flooring)AED 75K–120KAED 110K–160KAED 150K–200K5–7 weeks
Premium full renovation (all of standard + custom joinery + smart home)AED 110K–160KAED 150K–210KAED 200K–260K7–10 weeks
Luxury (premium + book-matched marble + Italian brands)AED 160K–230KAED 220K–320KAED 280K–420K9–12 weeks
Inside the DAMAC Hills NOC Process

Approvals: What DAMAC and Dubai Municipality Need Before You Start

Most owners we meet are surprised at how strictly DAMAC enforces its NOC process. Unlike some master developers who treat the NOC as a paperwork formality, DAMAC Properties' Owners' Association actively inspects sites and will halt work if a renovation starts without an approved NOC. We've seen contractors barred from working in DAMAC Hills for 12 months after one unauthorised job. So step one is always: secure the NOC before any tools come on site.

The DAMAC NOC application typically requires: a copy of your title deed (or current tenancy contract if you're an investor renting), your Emirates ID, the contractor's Dubai Municipality trade licence (we're licensed under DED 1167512), the contractor's third-party insurance certificate (minimum AED 1 million coverage), a scope-of-works letter signed by the owner, drawings of any structural change, and the security deposit. The deposit is refundable on satisfactory site close-out and is typically AED 2,000 for a small apartment and AED 5,000 for larger units or works involving common areas (e.g. corridor floor protection requirements).

If your scope involves anything structural — moving a wall, changing a wet-area footprint, adding new electrical circuits, swapping a gas hob for an induction hob with a load increase — you also need a separate Dubai Municipality Building Permit. DM permits in 2026 are issued via the Building Permit System portal, processed by a registered Engineering Consultant who submits stamped drawings on your behalf. We work with two consultants who handle DAMAC Hills regularly and turn around stamped sets in 5–10 working days. DM processing on top adds 5–14 days depending on permit type. For straightforward non-structural renovations (replace kitchen in same footprint, replace bathroom in same footprint, paint, flooring) you don't need DM permits — the DAMAC OA NOC is enough.

DEWA approval kicks in if your electrical load changes. Adding a high-load appliance (induction hob, EV charger, additional aircon) requires DEWA load-increase approval, which is filed alongside the DM permit. Plumbing changes that don't touch the building riser are within the apartment's licensed plumbing envelope and don't need DEWA approval. We always do a load calculation at site visit so we know on Day 0 whether DEWA is in scope.

One thing worth noting: DAMAC enforces strict working hours and noise rules. Demolition and heavy hammering are typically allowed only between 9 am and 5 pm, Saturday to Thursday. Friday morning is no-work. Drilling and noisy works are not permitted during Eid and major UAE holidays. Our schedules account for all of this from Day 0, so we don't hit timeline surprises mid-project. The 4–10 week ranges we quote already include these constraints.

Finally — if you're an investor renovating between tenants, time the renovation start to coincide with the tenancy end date plus 10 days. The 10-day buffer accommodates DAMAC NOC processing, which we file the day the apartment becomes vacant. That avoids paying empty service charges during a long approval wait.

FAQ

Frequently Asked Questions

How much does apartment renovation in DAMAC Hills cost?
Full apartment renovation in DAMAC Hills typically costs AED 55,000 for a studio or 1-bedroom quick-turn, AED 75,000–160,000 for a standard 1–2 bedroom owner-occupier scope, and AED 150,000–260,000+ for premium 3-bedroom renovations with custom joinery and smart-home integration. Kitchen-only is AED 45,000+; a single bathroom is AED 25,000+.
Which towers in DAMAC Hills do you renovate?
We renovate apartments across all DAMAC Hills apartment towers including Carson, Vita, Loreto, Park Greens, Park Central, Bellavista, Golf Promenade, Golf Town, Orchid, Genesis, Topanga and Zinnia. Each tower has slightly different OA rules and timing windows that we know already.
Do I need a NOC from DAMAC to renovate my apartment?
Yes. DAMAC Properties Owners' Association requires a master-developer NOC for every apartment renovation in DAMAC Hills, regardless of scope. We handle the full NOC application as part of every project — contractor licence verification, insurance, drawings, refundable security deposit. Approval typically takes 10–14 working days.
How long does a DAMAC Hills apartment renovation take?
A quick-turn investor renovation (kitchen + bathroom + paint) takes 3–4 weeks. A standard 2-bedroom full renovation takes 5–7 weeks. A 3-bedroom premium renovation takes 7–10 weeks. Add 2–3 weeks of NOC and permit processing before site mobilisation.
What is the warranty on a DAMAC Hills apartment renovation?
First Unicorn Interiors gives a 3-year workmanship warranty on every apartment renovation in DAMAC Hills. This covers all our own work — tiling, plumbing, electrical, joinery, painting, finishing. Manufacturer warranties on installed products (kitchen carcasses, appliances, sanitaryware) are passed through separately, typically 2–10 years depending on brand.
Can I live in the apartment during the renovation?
For a full renovation, no — the apartment becomes a working site with dust, MEP isolation periods and overnight curing of wet works. For a partial renovation (one bathroom only, or paint only), yes, with site-protection sheeting between zones. We discuss site-occupancy options at the free site visit.
Is the price fixed or will it change?
Fixed. Our BOQ is a line-item itemised quote — no allowances, no provisional sums, no "subject to site conditions". The number you sign is the number you pay, unless you request scope changes in writing, which we then price and you approve before any extra work starts.
Sources & References

Where this information comes from

This page reflects current Dubai Municipality, RERA, Dubai Land Department and master-developer (Emaar, Nakheel, DAMAC, Meraas) processes as of 2026-05-14. AED prices are based on First Unicorn Interiors' own BOQs across 800+ Dubai projects (2010–2026). Sources we relied on:

First Unicorn Interiors
Written by the First Unicorn Interiors editorial team
Dubai Municipality licensed renovation contractor (DED 1167512). 800+ projects across Palm Jumeirah, Emirates Hills, Dubai Hills, DAMAC Hills, Arabian Ranches and 80+ other communities since 2010. In-house team of 50+ specialists covers architectural design, NOC processing, structural works, MEP, joinery, finishing and warranty service.
Page reviewed and last updated 2026-05-14.

Related Reading on First Unicorn Interiors

All Apartment Communities DAMAC Hills Villa Renovation Apartment Renovation Overview Apartment Renovation Cost Guide Kitchen Renovation Bathroom Renovation NOC Processing Service

Start Your DAMAC Hills Apartment Renovation

Send us a photo of your apartment on WhatsApp and we'll come back within 24 hours with an indicative price range. Free site visit. Fixed-price BOQ. 3-year warranty.

DAMAC Hills apartment renovation detail — premium materials
WhatsAppCall Now