First Unicorn Office
COMPLETE OFFICE FIT-OUT · MEP · JOINERY · FINISHES
Premium office renovation in Dubai with glass partitions and modern workstations
★ DUBAI'S TRUSTED OFFICE RENOVATION SPECIALISTS

Full Office Renovation Without Disrupting Your Business

Updated 2026-10-11 — Latest 2026 prices and availability

Complete office renovation across Dubai — civil, MEP, joinery, glass partitions, flooring, false ceiling. Phased to keep your team operational. From AED 320/sqft. 80+ offices delivered.

800+Projects Done
FixedPrice Quotes
All TradesIn-House
DM/DCDApprovals
60-MinResponse
4.9★127 Reviews
THE PROBLEM

Why Most Office Renovations Run 40% Over Budget

Based on 800+ projects, here's what goes wrong with office renovation — and how we prevent it.

80% of office renovation complaints are avoidable. Here's what to watch for.

Disrupted Operations

Poor phasing means your team can't work during renovation. We phase night/weekend shifts and section-by-section handover — zero downtime.

Hidden MEP Costs

70% of office renovations have MEP surprises — ductwork, electrical capacity, fire systems. We survey all MEP before quoting. Fixed price.

Delayed Handover

Average Dubai office renovation runs 3-6 months late. We deliver in 45-75 days using parallel all-trades-in-house workflow.

IT Infrastructure Ignored

Contractors forget structured cabling, server room cooling, UPS. We integrate IT infrastructure from day one — not as afterthought.

SIDE-BY-SIDE
Exec office — First Unicorn Interiors project, Dubai

Office Renovation: Us vs Typical Contractors

Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.

What You Get First Unicorn Office Typical Dubai Provider
Pricing Model ✓ Fixed price quoted upfront ✗ Hourly billing or % of build cost
First-Time Quality ✓ 98% pass first review/inspection ✗ 40-60% industry average
Turnaround Time ✓ Industry-leading delivery time ✗ 2-3x slower typical
Authority Approvals ✓ All handled in-house ✗ Charged extra, often outsourced
Community NOCs ✓ All included in package ✗ Charged AED 5K-15K per NOC extra
Same Team End-to-End ✓ Yes — single point of accountability ✗ Hand-off to multiple teams
Warranty ✓ 3-year warranty on all work ✗ 1 year industry standard
Response Time ✓ 60 minutes during business hours ✗ 1-3 business days typical
Free Consultation + Site Visit ✓ Yes, free anywhere in Dubai ✗ AED 2,500-5,000 typical fee
Revisions & Resubmissions ✓ Unlimited revisions included ✗ Usually 2 rounds, then charged extra
Quality of Office Renovation ✓ Premium materials + expert craftsmanship ✗ Standard materials, generic execution
Construction Coordination ✓ 70% fewer site issues vs industry ✗ Frequent change orders + RFIs
WHY CHOOSE US FOR OFFICE RENOVATION

Planning a full office? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

Wow private office — First Unicorn Interiors project, Dubai

Why 800+ UAE clients Choose Us for Office Renovation

Not marketing copy — operational advantages from 800+ delivered projects.

All Trades In-House

Civil, MEP, joinery, glass, ceiling, flooring, painting, IT cabling — one team, one PM, one schedule.

Night & Weekend Work

Phased renovation to minimise disruption. Night shifts, weekend blitzes, section-by-section handover.

DM + DCD Compliant

Municipality permits, civil defense compliance, fire safety — all handled. 98% first-submission approval rate.

Fixed-Price Quotes

Detailed BOQ with every line item. No 'variation orders' or 'unforeseen conditions' surprises.

45-75 Day Delivery

Parallel workflow: MEP + joinery + glass + ceiling simultaneously. 50% faster than sequential contractors.

IT Infrastructure

Structured cabling, server room, AV systems, access control — integrated from design stage.

3-Year Warranty

Full warranty on all trades — finishes, joinery, MEP, ceiling, glass, flooring. Industry standard is 1 year.

Daily QC Updates

WhatsApp photo updates daily. Weekly walk-throughs. Issues caught in real-time, not at snagging.

TRANSPARENT PRICING

Office Renovation Packages — Fixed Pricing

Three packages. One fixed price. No hidden costs. Pricing per sqft of office area.

Standard Office

AED 320 – 550/sqft
Functional · Clean
  • Demolition + disposal
  • New electrical + data points
  • Gypsum partition walls
  • Mineral fibre ceiling
  • Vinyl/carpet flooring
  • Standard joinery + reception
  • Full painting
  • 45-60 day delivery
Standard Quote →

Executive Office

AED 900 – 1,800+/sqft
Bespoke · Flagship
  • Everything in Premium +
  • Marble/natural stone finishes
  • Custom millwork throughout
  • Crestron/Lutron smart controls
  • Full AV + video conferencing
  • Branded environment design
  • Server room + UPS
  • 70-90 day delivery
Executive Quote →
Pricing per sqft of office area. Material upgrades priced separately. Free site visit + quote within 48 hours.
OUR PROCESS
Office internet city — First Unicorn Interiors project, Dubai

From Site Visit to Move-In Ready in 45-75 Days

A proven 6-stage process refined across 80+ Dubai office renovations.

1

Free Site Visit + MEP Survey

Day 1-3 · FREE

Site visit, full MEP survey, IT requirements gathering, DM/DCD feasibility check, phasing strategy. Fixed-price quote within 48 hours.

2

Design + Approvals

Day 3-12

Space planning, 3D visualisation, material selection, branding integration. DM permit + DCD fire safety + landlord NOC — all in parallel.

3

Demolition + MEP Rough-In

Day 12-25

Phased demolition (section-by-section), MEP rough-in, electrical, data cabling, HVAC modifications, fire systems.

4

Partitions + Ceiling + Flooring

Day 25-45

Glass/gypsum partitions, false ceiling, flooring installation. Parallel workflow — all trades simultaneously.

5

Joinery + Lighting + Finishes

Day 45-60

Custom joinery, reception desk, boardroom, lighting fixtures, painting, branding elements, AV installation.

6

Snagging + Handover

Day 60-75 + 3-Year Warranty

Snagging resolution, final cleaning, IT testing, DCD inspection, keys handover. 3-year warranty active.

OFFICE EXPERTISE
Wow ceo office — First Unicorn Interiors project, Dubai

All Office Renovation Trades In-House

Specialist teams for every trade — no subcontractors, no schedule conflicts.

Civil & Structural

Demolition, concrete, blockwork, waterproofing

MEP Systems

Electrical, plumbing, HVAC, fire fighting, BMS

Flooring & Finishes

Marble, tile, vinyl, carpet, epoxy, wood

Joinery & Millwork

Reception desks, cabinetry, feature walls

Painting & Wall Finishes

Premium paint, wallpaper, cladding, acoustic panels

Glass & Aluminium

Partitions, doors, curtain walls, facades

False Ceiling

Gypsum, mineral fibre, metal, GRG, open grid

Lighting & Controls

Architectural, task, decorative, smart controls

Signage & Branding

Reception signage, wayfinding, brand walls

IT & AV Infrastructure

Cabling, server room, AV, access control

Municipality & Approvals

DM permits, DCD, civil defense, DEWA

Final QC & Handover

Snagging, punch list, cleaning, handover

98% first-submission approval rate · 800+ projects · Zero rejections beyond second submission in last 5 years
RECENT PROJECTS

See it before you build it

Free 3D design concept for your full office — based on 800+ completed Dubai projects.

Office Renovations Delivered Across Dubai

Recent office renovation projects from DIFC to Business Bay.

Dubai renovation project
PALM JUMEIRAH

Beachfront Villa Reno

Complete villa renovation — 10,500 sqft, 90-day delivery.

10,500 sqftPremium
90 daysDelivered
OnBudget
Dubai renovation project
EMIRATES HILLS

Mansion Full Reno

15,000 sqft mansion renovation with structural modifications.

15,000 sqftUltra-Luxury
120 daysDelivered
EmaarApproved
Dubai renovation project
DUBAI HILLS

Family Villa Reno

Premium family villa renovation — modern design.

4,800 sqftPremium
75 daysDelivered
FamilyFriendly
Dubai renovation project
ARABIAN RANCHES

Mediterranean Renovation

Mediterranean-style villa renovation.

5,200 sqftPremium
75 daysDelivered
MediterraneanModern
Dubai renovation project
AL BARARI

Sustainable Villa Reno

Biophilic design with solar PV integration.

6,500 sqftSustainable
90 daysDelivered
Solar+EVIntegrated
Dubai renovation project
BUSINESS BAY

Commercial Fit-Out

Full commercial renovation — office tower level.

8,000 sqftCommercial
60 daysDelivered
OnSchedule
View Full Portfolio →
INSTANT ESTIMATE

Office Renovation Cost Calculator

Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.

Estimate Your Office Renovation Cost

Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.

AED 320 – 900 per sqft

Complete office renovation · 45-75 day delivery

Get Exact Quote on WhatsApp

CLIENT REVIEWS

What will yours cost?

Get a personalised estimate in 60 seconds with our renovation calculator.

What Clients Say About Our Office Renovation

4.9/5 rating from 127 Google reviews.

★★★★★

"First Unicorn delivered our office renovation on time and on budget. The all-trades-in-house approach meant one PM, daily QC updates, and zero finger-pointing. Professional team."

RA
Rashid A. Office Renovation · Dubai
★★★★★

"DM approvals, DCD compliance, execution — all handled by one team. No 'permits separate, 4 months extra' surprises. Office was operational ahead of schedule."

SK
Sarah K. Office Project · Dubai
★★★★★

"Snagging list at handover was 28 items. Previous contractor's project had 200+. Daily QC during build catches everything. Worth every dirham."

AM
Ahmed M. Office Renovation · Dubai
REAL-TIME PROOF

Live Performance — Last 90 Days

Transparent track record. Updated quarterly. No marketing fluff — just numbers.

47
Projects delivered last 90 days
100%
Delivered on schedule
4.9★
Average client rating
0
Quality complaints in 12 months

Recent Wins

  • Palm Jumeirah Frond M · project ✓ Delivered
  • Emirates Hills Sector E · project ✓ Completed
  • Dubai Hills Maple · project ✓ Approved
  • Arabian Ranches Saheel · project ✓ Handed over
  • JVT Cluster R · project ✓ Delivered
  • Al Barari · project ✓ Completed
  • Jumeirah Bay Island · project ✓ Approved
CERTIFICATIONS & MEMBERSHIPS
DM ApprovedDubai Municipality registered consultant
DDA RegisteredDubai Development Authority approved
Trakhees ListedPalm Jumeirah / freehold zone approved
800+ ProjectsAcross UAE since inception
4.9★ Google127 verified reviews
At a Glance

Full office renovation in Dubai starts at AED 320 per sqft and typically takes 8-12 weeks without disrupting business operations. First Unicorn Interiors delivers complete fit-outs including civil works, MEP, joinery, glass partitions, flooring, and false ceilings across areas like Business Bay and DIFC. With 800+ projects completed, they ensure phased execution to keep teams operational.

Key facts
  • Full office renovation costs AED 320/sqft minimum, covering MEP, joinery, and finishes.
  • Phased approach prevents business disruption, based on 800+ UAE projects delivered.
  • In-house trades handle DM/DCD approvals for seamless execution.
  • 80% of renovation issues like budget overruns are avoided through expert planning.
  • 4.9★ rating from 127 reviews, with 60-minute response time.

Quick answers

How much does full office renovation cost in Dubai?
Full office renovation by First Unicorn starts at AED 320 per sqft for basic fit-outs, reaching AED 500 per sqft for premium setups with custom joinery and AV systems. This includes civil works, MEP installation, glass partitions, and false ceilings. Total costs for a 5,000 sqft office range from AED 1.6M to AED 2.5M based on scope.
How long does a full office renovation take in Dubai?
Small offices under 2,000 sqft take 6-8 weeks with phased execution. Medium 2,000-5,000 sqft projects require 8-12 weeks to minimize disruption. Large over 5,000 sqft renovations span 12-16 weeks, including approvals and testing.
What permits are needed for office renovation in Dubai?
Dubai Municipality (DM) issues building permits for structural changes, while DEWA approves MEP and electrical works. DCD handles civil defense NOC for fire safety. Master developers like Emaar or Nakheel require additional approvals for common area modifications in areas like Downtown Dubai or DIFC.
What does a full office renovation include?
It covers civil works, MEP systems, joinery, glass partitions, flooring, and false ceilings. First Unicorn's in-house team delivers 800+ projects with branded receptions and smart controls. Expect 80+ offices completed across Dubai business districts.
How to avoid budget overruns in office renovation?
Poor phasing causes 40% overruns in 80% of cases; First Unicorn prevents this with fixed-price quotes and in-house trades. Based on 800+ projects, they ensure DM approvals and 60-minute responses. Reviews show 4.9★ satisfaction from 127 clients.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.
FREQUENTLY ASKED

Everything You Need to Know About Office Renovation in Dubai

Most common questions answered. WhatsApp us — responded within 60 minutes.

How much does office renovation cost in Dubai? +

Office renovation in Dubai ranges from AED 320/sqft (standard) to AED 1,800+/sqft (executive). Our 3-tier packages: Standard (AED 320-550/sqft), Premium (AED 550-900/sqft), Executive (AED 900-1,800+/sqft). Glass partitions, joinery quality, and flooring drive most cost differences.

How long does office renovation take? +

Standard office: 45-60 days. Premium: 55-70 days. Executive: 70-90 days. Industry average is 4-8 months — we're 50% faster with parallel all-trades-in-house workflow.

Can you renovate while we're still working? +

Yes — phased renovation is our specialty. Night/weekend shifts, section-by-section completion, dust barriers, noise management. Zero-downtime office renovation.

Do you handle DM and DCD approvals? +

Yes — DM building permits, DCD fire safety, DEWA, landlord NOC — all handled in-house. 98% first-submission approval rate.

Do you handle IT cabling and infrastructure? +

Yes — structured cabling, server room, AV systems, access control, CCTV integration — all from design stage, not as afterthought.

What's included in your office renovation? +

Full office renovation: demolition, MEP, partitions (glass/gypsum), false ceiling, flooring, joinery, painting, lighting, IT cabling, DCD compliance, final cleaning, handover.

Do you provide all trades or use subcontractors? +

All trades in-house. Civil, MEP, glass, ceiling, joinery, flooring, painting, IT — one team, one PM, one schedule. No subcontractor finger-pointing.

What warranty do you offer? +

3-year warranty on all our work — significantly longer than industry-standard 1 year. Covers all trades: finishes, joinery, glass, MEP, ceiling, flooring.

OFFICE RENOVATION BY AREA

Office Renovation Across 20 UAE Communities

Local pricing, community approvals and a fixed quote for your area.

Abu Dhabi

Al Reem Island Yas Island

Dubai

Al Jaddaf Al Quoz Arjan Business Bay DIFC Deira Downtown Dubai Dubai Marina Dubai Production City Dubai Silicon Oasis Dubai South Dubai Sports City Dubai Studio City Expo City International City Jumeirah Lake Towers Jumeirah Village Circle Jumeirah Village Triangle

Get Your Office Renovation Done Right. First Time.

Free site visit, fixed-price quote in 48 hours, all trades in-house. 800+ projects delivered. Daily QC + 3-year warranty.

Sun-Thu 9am-6pm GST · Free site visit anywhere in Dubai · 60-min response

Office renovation in Dubai: permits, timelines and what drives cost

Office renovation in Dubai is a regulated project, not only a design exercise. Before anyone moves a partition, ceiling or power point, the fit-out drawings need approval from the relevant authority. For most mainland towers that is Dubai Municipality, which typically takes 10-15 working days for building and fit-out plan approval. Offices in free zones such as DDA, DMCC or DIFC follow their own authority's process instead. Changes to sprinklers, smoke detection or exit routes go to Dubai Civil Defence for fire and life safety approval, which takes 5-10 working days. New or moved electrical loads need a DEWA connection or modification approval, which takes 7-14 working days. Some sites need more. Communities run by a master developer need a NOC, which takes 10-20 working days. Offices on Palm Jumeirah, in Jebel Ali or in other Trakhees areas need Trakhees approval, which takes 15-25 working days. Your building management also has to approve the work. That runs alongside the authority approval and does not replace it. Several of these approvals run at the same time, so a good contractor sequences them rather than adding them end to end. Build time depends on floor area. Offices up to 500 sqft typically take 3-4 weeks, 500-1,500 sqft take 5-7 weeks, and 1,500-5,000 sqft take 8-12 weeks. First Unicorn Interiors keeps civil, MEP, joinery, glass partitions and approvals in-house. We phase the work so your team keeps working. All timelines are indicative and are confirmed only after an on-site survey.

Which approvals does an office renovation in Dubai need?

Start with your lease. RERA, the regulatory arm of the Dubai Land Department, governs landlord-tenant relations, and most commercial leases registered through Ejari include a fit-out clause that requires the landlord's written consent before work starts. Next comes the building management or master developer. Their approval runs alongside authority approval; it does not replace it. A master developer NOC typically takes 10-20 working days. The authority depends on where your office is. Dubai Municipality handles most mainland buildings and typically takes 10-15 working days. Trakhees covers Palm Jumeirah and Jebel Ali and takes 15-25 working days. Free-zone authorities have their own rules, which differ from Dubai Municipality's. On top of that, Civil Defence approves fire and life safety work in 5-10 working days, and DEWA approves electrical connections or changes in 7-14 working days. Offices inside a mall need the mall landlord's approval as well, which takes 10-20 working days. This adds to authority approval and does not replace it. Missing any of these approvals can stop work on site or hold up your completion certificate.

How long does an office renovation in Dubai take, and can we keep working?

Plan for two stages: approvals, then construction. Approvals overlap, so the longest single approval usually sets the pace, not the total of all of them. For example, Dubai Municipality takes 10-15 working days and DEWA takes 7-14, but both can run while Civil Defence is reviewing fire and life safety drawings. On-site build time depends on floor area. Offices up to 500 sqft typically take 3-4 weeks, 500-1,500 sqft take 5-7 weeks, and 1,500-5,000 sqft take 8-12 weeks. Phasing is how you keep the business running. We split the floor into zones, move teams between them, and schedule noisy demolition, ceiling and MEP work for times the building allows, usually after hours or at weekends. Many Dubai towers limit when noisy work can happen, so the phasing plan has to match building management rules from day one. If you plan this well, you won't need to move staff to temporary offices.

What drives the cost of an office renovation in Dubai?

Office projects are priced by floor area, not by number of rooms. The biggest cost factor is finish level. Standard gypsum partitions, carpet tiles and grid ceilings sit at one end. Full-height acoustic glass, engineered timber, feature joinery and integrated lighting sit at the other. MEP scope is the next biggest factor. Moving HVAC diffusers, adding power and data points, or upgrading sprinklers and fire alarms adds trade work, and it also triggers DEWA and Civil Defence approvals. Location matters too. Trakhees and free-zone jurisdictions have their own approval rules, and offices in malls need a separate landlord approval, all of which affect fees and programme time. Reusing what is already there, such as sound ceiling grids, raised floors or existing glazing, can bring costs down a lot. Phased or after-hours work to keep your team running adds labour time. Any figure is indicative until we have surveyed the site, measured the floor and checked what can be reused.