Complete office renovation across Dubai — civil, MEP, joinery, glass partitions, flooring, false ceiling. Phased to keep your team operational. From AED 320/sqft. 80+ offices delivered.
Based on 800+ projects, here's what goes wrong with office renovation — and how we prevent it.
Poor phasing means your team can't work during renovation. We phase night/weekend shifts and section-by-section handover — zero downtime.
70% of office renovations have MEP surprises — ductwork, electrical capacity, fire systems. We survey all MEP before quoting. Fixed price.
Average Dubai office renovation runs 3-6 months late. We deliver in 45-75 days using parallel all-trades-in-house workflow.
Contractors forget structured cabling, server room cooling, UPS. We integrate IT infrastructure from day one — not as afterthought.
Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.
| What You Get | First Unicorn Office | Typical Dubai Provider |
|---|---|---|
| Pricing Model | ✓ Fixed price quoted upfront | ✗ Hourly billing or % of build cost |
| First-Time Quality | ✓ 98% pass first review/inspection | ✗ 40-60% industry average |
| Turnaround Time | ✓ Industry-leading delivery time | ✗ 2-3x slower typical |
| Authority Approvals | ✓ All handled in-house | ✗ Charged extra, often outsourced |
| Community NOCs | ✓ All included in package | ✗ Charged AED 5K-15K per NOC extra |
| Same Team End-to-End | ✓ Yes — single point of accountability | ✗ Hand-off to multiple teams |
| Warranty | ✓ 3-year warranty on all work | ✗ 1 year industry standard |
| Response Time | ✓ 60 minutes during business hours | ✗ 1-3 business days typical |
| Free Consultation + Site Visit | ✓ Yes, free anywhere in Dubai | ✗ AED 2,500-5,000 typical fee |
| Revisions & Resubmissions | ✓ Unlimited revisions included | ✗ Usually 2 rounds, then charged extra |
| Quality of Office Renovation | ✓ Premium materials + expert craftsmanship | ✗ Standard materials, generic execution |
| Construction Coordination | ✓ 70% fewer site issues vs industry | ✗ Frequent change orders + RFIs |
Not marketing copy — operational advantages from 800+ delivered projects.
Civil, MEP, joinery, glass, ceiling, flooring, painting, IT cabling — one team, one PM, one schedule.
Phased renovation to minimise disruption. Night shifts, weekend blitzes, section-by-section handover.
Municipality permits, civil defense compliance, fire safety — all handled. 98% first-submission approval rate.
Detailed BOQ with every line item. No 'variation orders' or 'unforeseen conditions' surprises.
Parallel workflow: MEP + joinery + glass + ceiling simultaneously. 50% faster than sequential contractors.
Structured cabling, server room, AV systems, access control — integrated from design stage.
Full warranty on all trades — finishes, joinery, MEP, ceiling, glass, flooring. Industry standard is 1 year.
WhatsApp photo updates daily. Weekly walk-throughs. Issues caught in real-time, not at snagging.
Three packages. One fixed price. No hidden costs. Pricing per sqft of office area.
A proven 6-stage process refined across 80+ Dubai office renovations.
Site visit, full MEP survey, IT requirements gathering, DM/DCD feasibility check, phasing strategy. Fixed-price quote within 48 hours.
Space planning, 3D visualisation, material selection, branding integration. DM permit + DCD fire safety + landlord NOC — all in parallel.
Phased demolition (section-by-section), MEP rough-in, electrical, data cabling, HVAC modifications, fire systems.
Glass/gypsum partitions, false ceiling, flooring installation. Parallel workflow — all trades simultaneously.
Custom joinery, reception desk, boardroom, lighting fixtures, painting, branding elements, AV installation.
Snagging resolution, final cleaning, IT testing, DCD inspection, keys handover. 3-year warranty active.
Specialist teams for every trade — no subcontractors, no schedule conflicts.
Demolition, concrete, blockwork, waterproofing
Electrical, plumbing, HVAC, fire fighting, BMS
Marble, tile, vinyl, carpet, epoxy, wood
Reception desks, cabinetry, feature walls
Premium paint, wallpaper, cladding, acoustic panels
Partitions, doors, curtain walls, facades
Gypsum, mineral fibre, metal, GRG, open grid
Architectural, task, decorative, smart controls
Reception signage, wayfinding, brand walls
Cabling, server room, AV, access control
DM permits, DCD, civil defense, DEWA
Snagging, punch list, cleaning, handover
Recent office renovation projects from DIFC to Business Bay.

Complete villa renovation — 10,500 sqft, 90-day delivery.

15,000 sqft mansion renovation with structural modifications.

Premium family villa renovation — modern design.

Mediterranean-style villa renovation.

Biophilic design with solar PV integration.

Full commercial renovation — office tower level.
Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.
Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.
4.9/5 rating from 127 Google reviews.
"First Unicorn delivered our office renovation on time and on budget. The all-trades-in-house approach meant one PM, daily QC updates, and zero finger-pointing. Professional team."
"DM approvals, DCD compliance, execution — all handled by one team. No 'permits separate, 4 months extra' surprises. Office was operational ahead of schedule."
"Snagging list at handover was 28 items. Previous contractor's project had 200+. Daily QC during build catches everything. Worth every dirham."
Transparent track record. Updated quarterly. No marketing fluff — just numbers.
Most common questions answered. WhatsApp us — responded within 60 minutes.
Office renovation in Dubai ranges from AED 320/sqft (standard) to AED 1,800+/sqft (executive). Our 3-tier packages: Standard (AED 320-550/sqft), Premium (AED 550-900/sqft), Executive (AED 900-1,800+/sqft). Glass partitions, joinery quality, and flooring drive most cost differences.
Standard office: 45-60 days. Premium: 55-70 days. Executive: 70-90 days. Industry average is 4-8 months — we're 50% faster with parallel all-trades-in-house workflow.
Yes — phased renovation is our specialty. Night/weekend shifts, section-by-section completion, dust barriers, noise management. Zero-downtime office renovation.
Yes — DM building permits, DCD fire safety, DEWA, landlord NOC — all handled in-house. 98% first-submission approval rate.
Yes — structured cabling, server room, AV systems, access control, CCTV integration — all from design stage, not as afterthought.
Full office renovation: demolition, MEP, partitions (glass/gypsum), false ceiling, flooring, joinery, painting, lighting, IT cabling, DCD compliance, final cleaning, handover.
All trades in-house. Civil, MEP, glass, ceiling, joinery, flooring, painting, IT — one team, one PM, one schedule. No subcontractor finger-pointing.
3-year warranty on all our work — significantly longer than industry-standard 1 year. Covers all trades: finishes, joinery, glass, MEP, ceiling, flooring.
Free site visit, fixed-price quote in 48 hours, all trades in-house. 800+ projects delivered. Daily QC + 3-year warranty.