A bathroom renovation is the single most impactful upgrade you can make to a Dubai villa. It is the room you start and end every day in — and the room that shows its age fastest in Dubai’s climate. Humidity, hard water, and daily use take a toll that makes bathrooms age faster here than almost anywhere else.
We have renovated over 300 bathrooms across the UAE. Here is everything you need to know before starting yours.
Bathroom Renovation Costs in Dubai
| Scope | What Is Included | Cost Range | Timeline |
|---|---|---|---|
| Refresh | New fixtures, paint, re-grout, vanity replacement | AED 25,000 – 40,000 | 1-2 weeks |
| Full Renovation | Complete gut, waterproofing, tiling, fixtures, glass enclosure, vanity, lighting | AED 45,000 – 90,000 | 3-5 weeks |
| Luxury | Floor-to-ceiling marble, frameless glass, rain shower, underfloor heating, smart features | AED 90,000 – 150,000+ | 5-8 weeks |
The One Thing You Cannot Skip: Waterproofing
This is the most critical part of any Dubai bathroom renovation. Waterproofing is not optional. It is the difference between a renovation that lasts 15 years and one that causes water damage within 18 months.
Proper waterproofing includes: membrane application to the entire wet area (floor and walls to 1.8m minimum), reinforcement at all corners and joints, drainage integration, and a 24-48 hour flood test before any tiling begins. We photograph and video the entire waterproofing process for every project. If your contractor does not do this, ask why.
Get a free quote on WhatsApp — we respond in under 15 minutes.
Planning a bathroom renovation? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

Material Selection: What Works in Dubai
Flooring and Walls
Porcelain tiles (AED 80-200/sqm) are the most practical choice. Water-resistant, durable, and available in finishes replicating marble, concrete, and wood. Natural marble (AED 250-800/sqm) is the luxury standard — Calacatta, Statuario, and Carrara are most requested. Beautiful, but requires sealing and annual maintenance. Large format tiles (60x120cm or 80x160cm) are trending in 2026 — fewer grout lines means a cleaner look.
Fixtures and Fittings
Budget brands run AED 2,000-5,000 for a full set. Premium European brands (Grohe, Hansgrohe, Duravit) cost AED 8,000-15,000. Luxury options (Gessi, CEA Design) start at AED 20,000+. Brushed gold and matte black finishes dominate Dubai’s premium market in 2026.
Glass Enclosures
Frameless glass is standard in premium Dubai bathrooms. Our in-house glass team fabricates and installs custom enclosures with precise tolerances. Budget AED 3,000-8,000 for standard frameless, or AED 8,000-15,000 for walk-in configurations.
Common Mistakes to Avoid
Choosing tiles before confirming layout. Your tile pattern, drain position, and niche locations all depend on the final layout. Ignoring ventilation. Dubai’s humidity makes extraction fans critical. Underestimating storage. Niches, vanity drawers, and mirror cabinets should be designed in from the start.
Plan Your Renovation
Use our free renovation calculator to get an instant bathroom renovation estimate.
Download our 2026 Cost Guide for detailed bathroom pricing by community, or check our pre-renovation checklist before choosing a contractor.
Ready to Transform Your Bathroom?
Based on 800+ completed projects across the UAE. No obligation, no pressure.
Get the Full 2026 Cost Guide
Download our complete renovation pricing guide with community-specific breakdowns.
See it before you build it
Free 3D design concept for your bathroom renovation — based on 800+ completed Dubai projects.
Related Cost Guides
- Villa Renovation Cost 2026
- Kitchen Renovation Cost 2026
- Bathroom Renovation Cost 2026
- Villa Extension Cost 2026
- Pool Construction Cost 2026
- Apartment Renovation Cost 2026
- Mosaic Tiles In Al Khawaneej
- Interior Designer In Jebel Ali Village
- Gypsum Partition Dubai
- Pool Retiling
- Garden Design Barari
- Garden Design Dubai Hills
- Swimming Pool Contractor Barari
- Swimming Pool Contractor Meadows
- Emirates Hills Villa Renovation
- Landscape Company Jumeirah Golf Estates
- Garden Design Emirates Hills
Explore by community: Emirates Hills · Arabian Ranches · Palm Jumeirah · Dubai Hills
Related Renovation Services
Explore our specialist renovation services across Dubai:
- Bathroom Renovation Dubai — complete redesign, waterproofing and finishing
- Kitchen Renovation Dubai — custom cabinetry, countertops, appliances
- Full Villa Renovation — every room, every surface, turnkey delivery
- Glass & Aluminium Works — shower enclosures, partitions, facades
- Flooring — marble, porcelain, engineered wood installation
What will yours cost?
Get a personalised estimate in 60 seconds with our renovation calculator.
Explore More
Our Services
Bathroom renovation in Dubai typically costs AED 25,000 to AED 80,000 depending on size and finishes, taking 4-8 weeks with First Unicorn Interiors. This includes plumbing, tiling, and waterproofing, with approvals from Dubai Municipality ensuring compliance. Over 800 projects completed with 3-year warranty on workmanship.
- Average bathroom renovation costs AED 25K+ for basic 5-10 sqm updates, up to AED 80K for luxury.
- Timeline: 4 weeks for standard remodels, 6-8 weeks for full overhauls including permits.
- Dubai Municipality NOC required for structural changes; DEWA approval for electrical/plumbing.
- Popular materials: Marble flooring AED 150-300/sqm, waterproofing essential in humid climate.
- First Unicorn Interiors offers in-house design, 3-year warranty on 800+ UAE projects.
Quick answers
How much does a bathroom renovation cost in Dubai?
How long does a bathroom renovation take in Dubai?
What permits are needed for bathroom renovation in Dubai?
What are common bathroom renovation materials in Dubai?
How to choose a bathroom renovation contractor in Dubai?
What warranty applies?
Understanding Bathroom Renovation Cost Dubai
The bathroom renovation cost in Dubai can vary significantly, typically starting from AED 25,000 for a standard refresh and potentially exceeding AED 80,000 for a luxurious, high-end transformation. As First Unicorn Interiors, a leading renovation contractor in Dubai, we've observed that the final price is influenced by several key factors including the size of your bathroom, the quality of materials chosen (e.g., European tiles vs. local options), the complexity of design, and the extent of plumbing or electrical modifications required. A typical renovation timeline ranges from 2 to 4 weeks for a complete overhaul, depending on these complexities. It’s crucial to factor in not just material and labor costs, but also potential permit fees. For instance, any structural changes or significant layout alterations will require approvals from Dubai Municipality (DM), and if you reside in a master-developed community like Emaar, Nakheel, or Meraas, a No Objection Certificate (NOC) from the developer is mandatory before work can commence. We at First Unicorn Interiors provide transparent pricing, a 3-year warranty on our workmanship, and handle all necessary approvals, ensuring a smooth process. Contact us at WhatsApp +971 58 565 8002 for a detailed consultation tailored to your specific needs and budget.
What Factors Significantly Influence Bathroom Renovation Costs in Dubai?
Several critical factors dictate the final bathroom renovation cost in Dubai. Firstly, the scope of work: a simple cosmetic update (e.g., new paint, vanity, fixtures) will be far less expensive than a full gut renovation involving layout changes, new plumbing lines, or waterproofing. Material choices are paramount; budget-friendly ceramic tiles might cost AED 30-60 per square meter, while premium porcelain or natural stone can range from AED 100-300+. Fixtures like toilets, sinks, and faucets from international brands (e.g., Grohe, Roca, Villeroy & Boch) can add thousands to the budget compared to local alternatives. Custom-built vanities or shower enclosures also increase costs. Labor, including demolition, plumbing, electrical, tiling, and painting, typically accounts for 30-40% of the total budget. Accessibility of the site within Dubai and the need for specialized trades (e.g., for intricate mosaic work) can also impact the overall price. First Unicorn Interiors helps clients navigate these choices to align with their financial plans.
What Permits and Approvals are Required for Bathroom Renovations in Dubai?
Navigating permits is a critical, often overlooked, aspect of bathroom renovation cost in Dubai. For any significant work involving changes to the bathroom layout, structural elements, or major plumbing/electrical modifications, approval from Dubai Municipality (DM) is mandatory. This includes submitting architectural drawings and potentially structural calculations. Furthermore, if your property is located within a master-planned community (e.g., Emirates Hills, Arabian Ranches, Jumeirah Islands), you will require a No Objection Certificate (NOC) from the respective master developer (e.g., Emaar, Nakheel, Meraas). This process ensures adherence to community guidelines and building codes. For any alterations to water or electrical systems, DEWA (Dubai Electricity and Water Authority) guidelines must be followed, though direct DEWA permits are usually handled by licensed contractors. Neglecting these approvals can lead to fines, project delays, or even demolition orders. First Unicorn Interiors manages the entire permit application process, ensuring your renovation complies with all local regulations and community rules.
How Long Does a Typical Bathroom Renovation Project Take in Dubai?
The duration of a bathroom renovation in Dubai largely depends on its complexity and the extent of work involved. A basic cosmetic upgrade, involving painting, fixture replacement, and minor tiling, might be completed within 1 to 2 weeks. However, a comprehensive renovation, which includes demolition, re-plumbing, re-wiring, waterproofing, new tiling, and installation of all fixtures, typically takes between 2 to 4 weeks. For very large bathrooms or those with highly customized designs and imported materials, the timeline can extend to 4-6 weeks, especially if there are lead times for specific items. The design phase itself can take 1-2 weeks, followed by permit processing which might add another 1-3 weeks depending on the complexity and required approvals from Dubai Municipality or master developers. First Unicorn Interiors emphasizes efficient project management, ensuring clear communication and adherence to agreed-upon schedules to minimize disruption, all backed by our 3-year warranty on workmanship.
- Bathroom renovations in Dubai typically start from AED 25,000.
- Expect a standard renovation to take 2-4 weeks to complete.
- Dubai Municipality (DM) approval is required for layout or structural changes.
- Master developer NOCs (e.g., Emaar, Nakheel) are mandatory in many communities.
- First Unicorn Interiors offers a 3-year warranty on all bathroom renovation projects.
Bathroom Renovation Dubai Cost: Your Complete Guide
Bathroom renovation Dubai cost can vary significantly, but with First Unicorn Interiors, you can expect a high-quality transformation starting from approximately AED 25,000 for a standard bathroom. This initial figure can ascend based on several critical factors, including the size of your bathroom, the complexity of the design, the quality of materials chosen (e.g., premium tiles, smart fixtures, custom cabinetry), and any structural or layout changes required. A typical bathroom renovation project in Dubai generally takes between 2 to 4 weeks to complete, though more intricate designs or those requiring extensive structural work might extend this timeline. Before any work commences, obtaining necessary permits from Dubai Municipality (DM) is crucial, and for properties within master-planned communities like Emaar, Nakheel, or Meraas, a No Objection Certificate (NOC) from the respective developer is also mandatory. Our team at First Unicorn Interiors handles all these approvals, ensuring a smooth, compliant process. We also offer a 3-year warranty on our workmanship, providing peace of mind for your investment. Understanding these variables is key to budgeting effectively for your dream bathroom.
What factors influence the cost of a bathroom renovation in Dubai?
Several key factors significantly influence the overall bathroom renovation Dubai cost. Firstly, material choices are paramount; standard ceramic tiles and basic sanitaryware will naturally be more economical than high-end porcelain or natural stone tiles, smart toilets, or designer faucets. For instance, basic tile work might cost AED 50-100 per sq meter, while premium options can exceed AED 300 per sq meter. Secondly, the extent of the renovation plays a huge role. A simple cosmetic upgrade (paint, new fixtures) will be far less expensive than a complete overhaul involving layout changes, re-piping, or moving electrical points. Structural modifications or expanding the bathroom footprint will incur higher costs due to additional labor, materials, and potentially more complex permits from Dubai Municipality. The quality of fixtures, from showerheads to vanity units, also presents a wide price spectrum, with luxury brands commanding premium prices. Lastly, labor costs, waterproofing requirements, and the need for specialized trades like custom joinery also contribute to the final budget. First Unicorn Interiors provides transparent breakdowns for all these elements.
What permits and approvals are required for a bathroom renovation in Dubai?
Navigating the permit landscape is a crucial step for any bathroom renovation in Dubai. The primary approval required is from Dubai Municipality (DM). This permit ensures that all proposed structural, plumbing, and electrical changes comply with local building codes and safety standards. For properties situated within master-planned communities, such as those by Emaar, Nakheel, Meraas, or Damac, obtaining a No Objection Certificate (NOC) from the respective master developer is also mandatory before DM will even process your application. This NOC confirms that your renovation plans align with the community's design guidelines and regulations. Furthermore, if your renovation involves significant changes to water or electrical lines, specific approvals from DEWA (Dubai Electricity and Water Authority) might be necessary to ensure compliance and safety. While RERA (Real Estate Regulatory Agency) and DLD (Dubai Land Department) are more involved in property transactions, understanding their regulatory framework ensures overall compliance. First Unicorn Interiors streamlines this process by managing all necessary permit applications on your behalf, ensuring your project proceeds without delays or legal complications.
How long does a typical bathroom renovation take in Dubai and what are the key phases?
A typical bathroom renovation in Dubai, ranging from a standard refresh to a moderate overhaul, generally takes between 2 to 4 weeks from start to finish. However, this timeline can extend for larger bathrooms, highly customized designs, or projects requiring extensive structural modifications. The process typically unfolds in several key phases. The initial phase involves design finalization and obtaining all necessary permits from Dubai Municipality and master developers, which can take 1-3 weeks on its own. Once approvals are secured, demolition begins, usually completed within 1-3 days. This is followed by the 'rough-in' stage, where new plumbing and electrical lines are installed or modified, taking about 3-5 days. Next comes waterproofing and tiling, a critical step for durability, which can span 5-10 days depending on the bathroom size and tile complexity. Finally, installation of sanitaryware, fixtures, cabinetry, painting, and final touches complete the project, typically within 4-7 days. First Unicorn Interiors meticulously plans each phase to ensure efficiency and timely completion, minimizing disruption to your home.
- Bathroom renovation costs start from AED 25,000+ for standard projects with First Unicorn Interiors.
- Typical renovation timelines range from 2 to 4 weeks, depending on complexity and size.
- Mandatory permits include Dubai Municipality (DM) approval and master developer NOCs.
- DEWA approvals are required for significant plumbing or electrical system modifications.
- First Unicorn Interiors offers a 3-year warranty on all bathroom renovation workmanship.
How Much Bathroom Renovation Cost in Dubai (2026 Guide)
How much bathroom renovation cost in Dubai? For a standard 5-7 square meter bathroom, you can expect to pay between AED 25,000 and AED 45,000 for a mid-range renovation, while high-end transformations with luxury finishes can exceed AED 60,000. This price typically includes demolition, plumbing, tiling, sanitary ware, and installation, but excludes structural changes, which require additional permits. The final cost depends on the scope of work, materials chosen, and the condition of existing plumbing. In Dubai, you must also factor in municipality approval fees (around AED 500-1,000) and DEWA disconnection/reconnection charges if you're relocating fixtures. For villa communities like Emirates Hills or The Palm, homeowners' association (HOA) approvals may add time and cost. On average, a complete bathroom renovation takes 2-4 weeks, depending on the complexity. To get an accurate quote, it's essential to have a detailed assessment from a licensed contractor like First Unicorn Interiors, who can provide a fixed-price contract and a 3-year warranty. Remember that the cheapest quote isn't always the best; quality workmanship and compliance with Dubai Municipality regulations are crucial. For a free consultation and detailed estimate, contact us on WhatsApp at +971 58 565 8002.
What is the average cost of a bathroom renovation in Dubai?
The average cost of a bathroom renovation in Dubai ranges from AED 25,000 to AED 45,000 for a standard 5-7 sqm bathroom. This includes basic demolition, new plumbing, electrical work, tiling, and installation of standard sanitary ware. If you choose premium tiles, branded fixtures, or a freestanding bathtub, costs can rise to AED 60,000 or more. For luxury renovations with marble, smart toilets, and custom joinery, expect to pay AED 80,000+. Remember that prices vary based on the condition of your existing plumbing and electrical systems. If you're in an older villa in Jumeirah or Umm Suqeim, you might need to upgrade pipes, adding AED 5,000-10,000. Always request a detailed quote that breaks down labor and material costs to avoid surprises.
How long does a bathroom renovation take in Dubai?
A typical bathroom renovation in Dubai takes 2-4 weeks. The timeline depends on the scope: a simple refresh with new fixtures and paint might take 1-2 weeks, while a full gut renovation with layout changes can take 4-6 weeks. Delays often occur due to municipality permit approvals (3-5 working days), DEWA disconnection/reconnection, and availability of materials. In villa communities, the HOA approval process can add another week. To minimize downtime, choose a contractor who manages permits and coordinates with authorities. First Unicorn Interiors offers a project manager who oversees daily progress and ensures timely completion. We also provide a 3-year warranty on workmanship, giving you peace of mind.
What are the hidden costs in bathroom renovation?
Hidden costs in bathroom renovation can include: permit fees (AED 500-1,000 from Dubai Municipality), DEWA charges for disconnection/reconnection (AED 100-300), and HOA approval fees (if applicable). Structural changes, such as moving walls or relocating plumbing, require engineering approval and can add AED 5,000-15,000. Waterproofing is essential and may cost AED 1,500-3,000. Unexpected issues like pipe corrosion or mold may surface after demolition, adding AED 2,000-5,000. Always include a contingency of 10-15% in your budget. A reputable contractor like First Unicorn Interiors provides a detailed quote that covers all known costs, reducing surprises.
- Bathroom renovation in Dubai: AED 25K-45K for standard 5-7 sqm
- Permits from Dubai Municipality: AED 500-1,000, 3-5 days
- DEWA disconnection/reconnection: AED 100-300
- Typical timeline: 2-4 weeks, HOA approval may add 1 week
- First Unicorn Interiors: 3-year warranty, WhatsApp +971 58 565 8002
Bathroom Fit Out Cost in Dubai: What You'll Really Pay in 2026
Bathroom fit out cost in Dubai typically starts at AED 25,000 for a standard 4-5 sqm bathroom, but can easily reach AED 60,000+ for luxury finishes. This guide breaks down exactly what you'll pay per square foot, what's included, and hidden costs. In 2026, expect to pay between AED 5,000 and AED 8,000 per square meter for a mid-range fit-out, with high-end materials pushing that to AED 10,000+. Timelines average 3-4 weeks for a single bathroom, but permits and building approvals can add 1-2 weeks. If you live in a villa community like Arabian Ranches or Emirates Hills, you'll need NOC approval from the master developer (e.g., Emaar, Nakheel) before any work begins. For apartments, you'll need Dubai Municipality permits and possibly DEWA disconnection/reconnection. First Unicorn Interiors handles all approvals and offers a 3-year warranty on all workmanship. Our transparent pricing includes demolition, waterproofing, tiling, plumbing, electrical, fixtures, and installation. Contact us on WhatsApp +971 58 565 8002 for a detailed quote tailored to your space.
What is the average cost of a bathroom fit out in Dubai per square foot?
In Dubai, bathroom fit out costs range from AED 450 to AED 800 per square foot for mid-range finishes, and AED 800 to AED 1,200+ for luxury. For a standard 40 sq ft bathroom (approx. 3.7 sqm), that's AED 18,000 to AED 32,000 for mid-range, but our starting price is AED 25,000 because we include premium waterproofing and high-quality fixtures. High-end options like marble walls, freestanding tubs, and smart toilets can push costs to AED 50,000+. Remember, these prices include labor, materials, and project management. For an accurate estimate, we recommend a site visit – we offer free consultations and detailed quotes within 24 hours.
What are the hidden costs in a bathroom renovation in Dubai?
Beyond the basic fit-out, watch out for these hidden costs: 1) Municipality permit fees (approx. AED 500-1,000) and NOC fees from your developer (AED 500-2,000). 2) DEWA connection/disconnection fees (AED 100-300). 3) Building maintenance fees if you live in an apartment – some buildings charge a 'fit-out deposit' (AED 2,000-5,000) refundable after inspection. 4) Unexpected structural issues like rotten subfloors or outdated plumbing – set aside 10-15% contingency. 5) Upgrading electrical wiring or adding new points. 6) If you're in a villa, you may need to hire a civil engineer for structural modifications. First Unicorn Interiors includes all necessary permits in our quote, so you won't face surprises.
How long does a bathroom fit out take in Dubai?
A typical bathroom fit out in Dubai takes 3-4 weeks for a single bathroom, assuming no major structural changes. This includes demolition (2-3 days), waterproofing (2 days), tiling (5-7 days), plumbing and electrical (3-4 days), fixture installation (2-3 days), and finishing touches (2 days). However, if you need to obtain permits from Dubai Municipality or an NOC from your developer, add 1-2 weeks for approval. For villa communities like The Springs or Jumeirah Golf Estates, the process may take longer due to stricter regulations. First Unicorn Interiors manages all timelines and ensures your project is completed on schedule – we've delivered many bathrooms in under 30 days.
- Bathroom fit out starts at AED 25,000 in Dubai (2026).
- Average cost: AED 5,000-8,000 per sqm for mid-range.
- Permits: Dubai Municipality & NOC from developer required.
- Timeline: 3-4 weeks, plus 1-2 weeks for approvals.
- 3-year warranty on all workmanship from First Unicorn.
Bathroom Renovation in Dubai: Complete Cost, Permit & Timeline Guide (2026)
Bathroom renovation in Dubai is a high-value home improvement project that can transform your daily routine and boost property resale value. Whether you're upgrading a master ensuite in a Palm Jumeirah villa or refreshing a guest bathroom in a Downtown apartment, the process involves more than just picking tiles. In Dubai, you must navigate approvals from Dubai Municipality, coordinate with DEWA for any electrical or plumbing changes, and, if you live in a master community, obtain NOC from the developer. On average, a standard bathroom renovation costs AED 25,000 to AED 45,000, with luxury remodels reaching AED 60,000 or more. The timeline typically spans 3 to 6 weeks, depending on the scope and permit approvals. At First Unicorn Interiors, we handle everything from design and engineering drawings to municipality approvals and construction, ensuring a seamless experience. Our 3-year warranty covers workmanship, and we've completed over 500 bathroom renovations across Dubai Marina, Jumeirah, and Arabian Ranches. In this guide, we answer your most pressing questions about bathroom renovation costs, permits, timelines, and design trends, so you can plan with confidence and avoid costly surprises.
How much does a bathroom renovation cost in Dubai?
In Dubai, a standard bathroom renovation typically starts at AED 25,000 and can go up to AED 45,000 for a mid-range upgrade, while luxury renovations with premium fixtures and marble can exceed AED 60,000. The final cost depends on the size of the bathroom, quality of materials, and complexity of work. For example, a small powder room (2m x 2m) might cost AED 20,000, while a large master bathroom (4m x 3m) with double vanities and a freestanding bathtub could reach AED 55,000. At First Unicorn Interiors, we provide transparent quotes that include demolition, waterproofing, tiling, plumbing, electrical, and installation of sanitaryware. We also advise on cost-saving options like using porcelain tiles instead of natural stone, which can save up to 30%. Remember to budget an additional 10-15% for unexpected issues like old pipe replacement or structural repairs, which are common in older buildings.
What permits are required for bathroom renovation in Dubai?
For bathroom renovation in Dubai, you typically need approval from Dubai Municipality, especially if you're altering plumbing, electrical, or structural elements. If you live in a villa within a master community like Emirates Living or Dubai Hills, you'll also need an NOC (No Objection Certificate) from the developer. For apartments, the building's owners' association or facilities management may have additional requirements. First Unicorn Interiors handles all permit applications on your behalf. We prepare engineering drawings, submit them to Dubai Municipality, and obtain the necessary permits before work begins. This process usually takes 5-10 working days, depending on the complexity. We also coordinate with DEWA if you need to upgrade your electrical load or relocate water heaters. By managing permits for you, we ensure your renovation is compliant and avoids fines or work stoppages.
How long does a bathroom renovation take in Dubai?
A typical bathroom renovation in Dubai takes 3 to 6 weeks from start to finish. The timeline includes 1-2 weeks for design and permit approvals, followed by 2-4 weeks of construction. For a simple renovation with no structural changes, you can expect completion in about 3 weeks. If you're moving walls, changing the layout, or installing luxury features like a steam shower, the project may take 5-6 weeks. At First Unicorn Interiors, we provide a detailed project schedule before we start, so you know exactly when each phase will be completed. We work efficiently to minimize disruption to your daily life, and we can often complete the renovation in 4 weeks if you choose standard fixtures and finishes. Our team coordinates with all subcontractors, ensuring that plumbing, electrical, and tiling work proceeds without delays. We also conduct regular quality checks to ensure the project stays on track and within budget.
- Bathroom renovation starts at AED 25K, luxury up to AED 60K+.
- Permits from Dubai Municipality required; NOC from developer for villas.
- Typical timeline: 3-6 weeks including design and approvals.
- DEWA coordination needed for electrical/water heater changes.
- First Unicorn offers 3-year warranty on all renovation work.