First Unicorn Building MEP
CHILLER · AHU · FCU · ELECTRICAL · PLUMBING · FIRE SYSTEMS
★ HVAC + MEP SPECIALISTS · CHILLER · AHU · ELECTRICAL · FIRE SYSTEMS

Building HVAC & MEP AMC. Chillers to Fire Pumps. One Contract. In-House.

Annual maintenance contract for building HVAC and MEP systems — chillers, cooling towers, AHUs, FCUs, VRF, electrical panels, generators, plumbing, fire systems. Preventive maintenance reduces breakdowns 60% and energy costs 20-30%. SLA-backed response. In-house MEP teams. Per-TR pricing from AED 100/TR/month. Free MEP audit.

★★★★★ 4.9/5 from 127 verified Google reviews
HVAC chiller plant room maintenance in Dubai commercial building
BUSINESS BAYChiller plant room — quarterly condenser cleaning + oil analysis
JLTAHU filter replacement — systematic preventive service
DUBAI MARINAThermal imaging — detecting invisible electrical hotspots
DOWNTOWN DUBAIFCU servicing — coil clean + drain flush per unit
JEBEL ALICooling tower — water treatment + biocide + fan maintenance
50+Buildings Maintained
HVAC+MEPAll In-House
60%Fewer Breakdowns
20-30%Energy Savings
SLAResponse Guarantee
DCDCompliant
THE PROBLEM

Why Most Building HVAC & MEP Contracts Fail to Deliver

HVAC accounts for 60-70% of building energy costs. Poor maintenance doesn't just cause breakdowns — it bleeds money every single day.

A poorly maintained chiller plant loses 20-30% efficiency annually. On a 500TR system, that's AED 80,000-150,000/year in excess DEWA costs — more than the entire AMC fee.

Chiller Efficiency Loss = AED 80K-150K/Year Wasted

Fouled condenser tubes, low refrigerant charge, and worn bearings reduce chiller COP (Coefficient of Performance) by 20-30%. On a 500TR plant running 4,000+ hours/year, that's AED 80,000-150,000 in excess DEWA electricity. Quarterly condenser tube cleaning and oil analysis alone recover half that.

DCD Non-Compliance = Building Closure Risk

Fire pump not tested monthly? Smoke detectors not functional? Emergency lights dead? DCD inspectors will shut your building down. Our AMC includes systematic fire and life safety testing with documentation — ready for any DCD inspection.

FCU Drain Pan Overflow = Ceiling Damage × 100 Units

One blocked FCU drain pan causes ceiling water damage costing AED 2,000-5,000 to repair. In a 100-unit building, 3-4 blocked drains per year = AED 6,000-20,000 in avoidable damage. Our quarterly FCU service includes drain line flush on every single unit.

Electrical Hotspots = Fire Risk + Equipment Failure

Loose connections in distribution boards cause hotspots that lead to fires and equipment failure. Annual thermal imaging catches these invisible risks before they become disasters. Most AMC contracts don't include thermal imaging — ours does.

SIDE-BY-SIDE

Comprehensive MEP AMC vs Labour-Only / Reactive Contracts

Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.

What You Get First Unicorn Building MEP Typical Dubai Provider
Contract type Comprehensive: labour + preventive + emergency + spare parts at cost Labour-only: scheduled visits, parts extra at markup
Chiller maintenance In-house HVAC engineers — condenser cleaning, oil analysis, vibration analysis Outsourced to OEM at 2-3× cost, or skipped entirely
AHU/FCU servicing Systematic: filter change, coil clean, drain flush, motor check — every unit Quick filter wipe, move on — drain lines ignored
Electrical maintenance Panel tightening, thermal imaging, load balancing, earthing test Visual check only — no thermal imaging, no testing
Fire systems Monthly pump test, quarterly detector test, annual full test — DCD documented Annual check before DCD inspection — reactive only
Plumbing systems Pump overhaul schedule, PRV testing, water tank cleaning + DM cert Fix leaks when reported — no preventive schedule
BMS coordination Alarm response, setpoint optimisation, trend analysis Not included — BMS alarms ignored
Energy monitoring Monthly kWh/TR tracking, efficiency trending, DEWA cost analysis Not tracked — efficiency loss invisible until bill arrives
Emergency response 2-hour SLA for critical systems, own team dispatched Next business day — subcontractor availability dependent
Spare parts Trade cost, zero markup — critical spares kept in stock 50-200% markup, 3-5 day sourcing delay
WHY CHOOSE US FOR BUILDING HVAC & MEP

Why Building Owners Choose Our HVAC & MEP AMC

MEP engineers, not handymen. Chiller expertise, not just split units. Energy focus, not just fixing breakdowns.

Chiller Plant Expertise

Air-cooled and water-cooled chillers, cooling towers, chilled water pumps, condenser water systems. Condenser tube cleaning, refrigerant management, oil analysis, vibration monitoring, COP tracking. Not every AC company can service a chiller plant — we can.

Full Electrical Scope

MDB, SDB, bus bars, transformers (DEWA coordination), generators (load testing, ATS, fuel management), UPS systems, lighting controls, earthing, surge protection. Annual thermal imaging of all panels — catches invisible hotspots before they become fires.

Fire & Life Safety Compliance

Fire pump testing (weekly/monthly), sprinkler system inspection, smoke/heat detector testing, fire alarm panel maintenance, emergency light testing, pressurisation fan checks, fire door inspection. Full DCD documentation — ready for any inspection.

Plumbing & Drainage Systems

Booster pumps, transfer pumps, PRVs, water heaters, drainage risers, sewage ejector pumps, grease traps, water tank cleaning with DM certificate. Pump rebuild schedule to prevent catastrophic failure.

Energy Efficiency Focus

HVAC = 60-70% of building energy cost. We track kWh/TR monthly, trend chiller efficiency, optimise AHU schedules, and report DEWA cost impact. Clients see 20-30% energy reduction in year 1 through maintenance-driven optimisation alone.

BMS Coordination

Alarm response, setpoint review, scheduling optimisation, trend analysis. We don't just maintain the hardware — we ensure the controls are working to keep energy costs down and comfort levels up.

Asset-Tagged Digital System

Every AHU, FCU, pump, panel, and fire device tagged with QR code. Complete maintenance history. Lifecycle tracking. Replacement forecasting. No more 'when was this last serviced?' guesswork.

SLA-Backed with Credit Mechanism

Critical systems (chillers, fire pumps, main electrical): 2-hour response. AHU/FCU: 4-hour response. Standard MEP: 24 hours. Miss an SLA = credit on next invoice. We put our fee at risk because we're confident in our response.

TRANSPARENT PRICING

Building HVAC & MEP AMC — Per-System Pricing

Three tiers based on building complexity. Pricing transparent — per TR, per FCU, per system.

Standard MEP (50-150 TR)

AED 30,000 – 60,000/year
Small Commercial · Office · Retail
  • Chiller servicing (quarterly)
  • AHU maintenance (quarterly)
  • FCU servicing — all units (quarterly)
  • Electrical panel maintenance + thermal imaging
  • Generator testing (monthly) + annual load test
  • Fire alarm + detector testing (quarterly)
  • Fire pump test (monthly)
  • Plumbing inspection + pump service
  • Water tank cleaning (biannual) + DM cert
  • 24/7 emergency (4-hour SLA)
  • Per-TR cost: AED 100-130/TR/month
Standard Quote →

Enterprise MEP (500+ TR)

AED 180,000 – 400,000/year
Large Tower · Mall · Hotel · Hospital
  • Everything in Comprehensive +
  • Dedicated on-site MEP team
  • Chiller plant 24/7 monitoring
  • Condenser tube cleaning (quarterly)
  • Full vibration analysis program
  • Refrigerant leak detection system
  • Generator auto-changeover testing
  • DCD annual inspection management
  • Annual energy audit + ESCO recommendations
  • Dedicated MEP manager + quarterly board reports
Enterprise Quote →
Per-TR pricing indicative. Exact quote based on MEP audit: number of chillers, AHUs, FCUs, electrical panels, fire zones, and plumbing systems. Spare parts at trade cost (zero markup). Critical spares stocked on-site for Comprehensive and Enterprise tiers. Elevator and transformer OEM contracts coordinated but billed separately. 10% discount for 2-year contracts.
OUR PROCESS

From MEP Audit to Full Coverage in 2 Weeks

Systematic onboarding by our MEP engineers. Every asset audited, tagged, and scheduled.

1

Free MEP Audit

Week 1 · FREE

Complete plant room survey — chillers (type, TR, age, condition), AHUs, FCUs (count per floor), electrical infrastructure (MDB, SDB, generator, UPS), fire systems (zones, pump type, detector count), plumbing (pumps, tanks, risers). Equipment inventory with condition ratings.

2

Scope & SLA Definition

Week 1-2

Detailed Scope of Works for every asset. Maintenance frequencies defined (daily/weekly/monthly/quarterly/annual). SLA response times by system criticality. KPI targets. Escalation matrix. Reporting format agreed.

3

Asset Tagging & Digital Setup

Week 2

QR code tags on every maintainable asset. Digital CMMS (Computerised Maintenance Management System) setup. Maintenance history database created. Building manager dashboard access granted.

4

First Complete Service Cycle

Week 2-3

Full service of all MEP systems. Chiller performance test. AHU filter replacement. FCU drain flush (all units). Electrical panel tightening + thermal scan. Fire system full test. Baseline readings recorded.

5

Preventive Schedule Live

Week 3+

Annual preventive maintenance calendar activated. Weekly fire pump tests. Monthly generator tests. Quarterly chiller service. 24/7 emergency line active. Daily BMS alarm monitoring (Comprehensive+).

6

Monthly KPI + Quarterly Review

Ongoing

Monthly: jobs completed, SLA compliance, energy performance (kWh/TR), open work orders, upcoming schedule. Quarterly: face-to-face review with building management. Annual: contract review + next-year recommendations + capital expenditure forecasting.

HVAC & MEP MAINTENANCE SCOPE

HVAC & MEP Systems We Maintain — All In-House

Every critical building system — maintained by our employed MEP engineers and technicians.

Chillers (Air & Water Cooled)

Carrier, Trane, York, Daikin, McQuay — all types and capacities

Cooling Towers

Water treatment, biocide, fill cleaning, fan motor, drift eliminators

AHUs & FAHUs

Filter replacement, coil cleaning, belt drive, motor, damper actuators

FCUs (All Units)

Filter, coil clean, drain flush, motor, valve — systematic per-unit service

VRF / Multi-Split Systems

Daikin, Mitsubishi, LG, Samsung — refrigerant, controls, outdoor units

Electrical Infrastructure

MDB, SDB, bus bar, thermal imaging, earthing, load balancing, surge protection

Generators & UPS

Load test, ATS changeover, fuel system, battery, coolant — all makes

Fire & Life Safety

Pumps, alarms, detectors, sprinklers, emergency lights, pressurisation, DCD docs

Plumbing & Pumps

Booster, transfer, sewage ejector, PRV, water heaters, drainage risers

Water Tank Cleaning

Biannual cleaning + DM certificate (legally required)

BMS Coordination

Alarm monitoring, setpoint optimisation, schedule review, trend analysis

Energy Monitoring

kWh/TR tracking, efficiency trending, DEWA cost analysis, ESCO advisory

98% first-submission approval rate · 800+ projects · Zero rejections beyond second submission in last 5 years
RECENT PROJECTS

Buildings Under Our HVAC & MEP AMC

50+ buildings — commercial towers, residential, mixed-use, hotels, industrial.

Business Bay commercial tower MEP AMC
BUSINESS BAY

Commercial Tower — 350 TR

2× air-cooled chillers, 8 AHUs, 120 FCUs, 3 generators. Full comprehensive MEP AMC. Energy costs reduced 24% in year 1 through chiller optimisation and AHU scheduling.

350 TRChiller Plant
24%Energy Saved
120FCUs Serviced
JLT mixed-use tower HVAC AMC
JLT

Mixed-Use Tower — 500 TR

Water-cooled chiller, cooling tower, 12 AHUs, 200 FCUs, dual generators, fire pump system. Dedicated on-site MEP technician. Condenser tube cleaning quarterly.

500 TRWater-Cooled
On-SiteMEP Tech
200FCUs
Dubai Marina residential tower HVAC AMC
DUBAI MARINA

Residential Tower — 250 TR

85-unit residential. Per-unit FCU service quarterly. Central chiller maintenance. Fire system compliance. Replaced 5-vendor setup — saved owners' association 38%.

250 TRResidential
85 FCUsQuarterly
38%Cost Saved
Downtown commercial HVAC maintenance
DOWNTOWN DUBAI

Office Tower — 400 TR

VRF system + supplementary chiller. BMS integration. Thermal imaging program. Monthly energy reporting to property manager. kWh/TR improved 18%.

400 TRVRF + Chiller
BMSIntegrated
18%Efficiency ↑
Industrial facility MEP AMC
JEBEL ALI

Industrial Facility — 600 TR

Manufacturing plant + warehouse + offices. Process cooling + comfort cooling. 3 chillers, 15 AHUs, dust extraction coordination. 24/7 monitoring.

600 TRIndustrial
24/7Monitoring
3Chillers
Hotel HVAC MEP maintenance Dubai
DEIRA

Hotel — 800 TR

150-key hotel. Chiller plant, 20 AHUs, 300 FCUs, kitchen ventilation, laundry steam, pool plant. Night-shift service protocol. Zero guest complaints.

800 TRHospitality
300FCUs
ZeroGuest Complaints
View Full Portfolio →
INSTANT ESTIMATE

Building HVAC & MEP AMC Cost Calculator

Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.

Estimate Your Building HVAC & MEP AMC Cost

Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.

AED 30,000 – 180,000 per year

All MEP in-house · SLA-backed · energy monitoring included

Get Exact Quote on WhatsApp

CLIENT REVIEWS

What Facilities Managers Say About Our MEP AMC

Technical feedback from building engineers and facilities managers.

★★★★★

"Our 350TR chiller plant was running at 0.85 kW/TR — well above the 0.65 target. After First Unicorn took over the AMC, condenser tube cleaning and refrigerant optimisation brought it down to 0.68 kW/TR. That's a 20% reduction in chiller energy — AED 95,000/year saved on DEWA. The AMC paid for itself twice over."

RE
Robert E. Chief Engineer · Business Bay · 350 TR
★★★★★

"Previous AMC contractor couldn't tell me when the fire pump was last tested. First Unicorn tagged every asset with QR codes, built a digital maintenance log, and now I can show DCD inspectors a complete testing history on my phone. Two DCD inspections since — both passed first time."

AK
Ahmed K. Facilities Manager · Dubai Marina · 250 TR
★★★★★

"The thermal imaging caught a loose bus bar connection in our MDB that was running at 127°C. Previous contractor never checked — they just did visual inspections. That connection was months away from an arc flash event. One thermal scan potentially saved the building from a catastrophic electrical fire."

SK
Sanjay K. Building Manager · Downtown · 400 TR
REAL-TIME PROOF

Live Performance — Last 90 Days

Transparent track record. Updated quarterly. No marketing fluff — just numbers.

50+
Buildings under MEP AMC
20-30%
Energy cost reduction in year 1
60%
Fewer emergency breakdowns
2-Hour
Critical system SLA response

Recent Wins

  • Business Bay · 350TR commercial tower ✓ 24% energy reduction
  • JLT · 500TR mixed-use · on-site MEP tech ✓ Dedicated team
  • Dubai Marina · 250TR residential · 85 FCUs ✓ 38% cost saved
  • Downtown · 400TR VRF + chiller · BMS ✓ 18% efficiency gain
  • Jebel Ali · 600TR industrial · 24/7 ✓ Process + comfort cooling
  • Deira · 800TR hotel · 300 FCUs ✓ Zero guest complaints
  • Al Barsha · 200TR school · DCD compliant ✓ Fire safety 100%
CERTIFICATIONS & MEMBERSHIPS
DM ApprovedDubai Municipality registered consultant
DDA RegisteredDubai Development Authority approved
Trakhees ListedPalm Jumeirah / freehold zone approved
800+ ProjectsAcross UAE since inception
4.9★ Google127 verified reviews
ENERGY SAVINGS ESTIMATOR

How Much Is Poor HVAC Maintenance Costing You?

HVAC accounts for 60-70% of building energy costs. Enter your building details to see potential savings with proper MEP maintenance.

ESTIMATED ANNUAL DEWA SAVINGS WITH PROPER MEP AMC
AED 72,000
Based on 20-30% efficiency improvement on 300 TR system
Verify My Savings — Free MEP Audit
PREVENTIVE MAINTENANCE SCHEDULE

What Gets Maintained, How Often, By Whom

Transparent maintenance schedule — no guesswork about what's covered.

System Weekly Monthly Quarterly Biannual Annual
Chillers✓ Log readings✓ Full service✓ Condenser clean✓ Oil + vibration analysis
Cooling Towers✓ Water treatment✓ Biocide✓ Fill cleaning✓ Full overhaul
AHUs / FAHUs✓ Filter check✓ Full service✓ Coil deep clean✓ Belt + motor service
FCUs (all units)✓ Filter + coil + drain✓ Motor + valve check
Electrical Panels✓ Tightening + check✓ Thermal imaging✓ Full load test
Generators✓ Visual check✓ Run test✓ Full service✓ Load bank test
Fire Pumps✓ Run test✓ Full test + log✓ Valve inspection✓ DCD inspection prep
Smoke Detectors✓ Functional test✓ Full zone test
Plumbing / Pumps✓ Pump check✓ PRV + valve test✓ Tank cleaning✓ Full system audit
BMS✓ Alarm review✓ Setpoint review✓ Schedule optimise✓ Full calibration

Every ✓ is documented with photos, readings, and completion certificate in our digital CMMS. Accessible to building managers anytime.

Summer Is Here. Your Chiller Plant Will Be Tested.

June-September: chillers run 18+ hours/day at peak load. An un-serviced chiller WILL fail. Emergency compressor replacement: AED 15,000-40,000. Preventive service that would have caught it: AED 500.

Get Your Free MEP Audit Before Summer
FREQUENTLY ASKED

Building HVAC & MEP AMC — Technical FAQ

Questions from building engineers and facilities managers. WhatsApp us — 60-minute response.

How much does a building MEP AMC cost in Dubai? +

Building MEP AMC pricing depends on total cooling capacity and system complexity. Standard (50-150TR): AED 30,000-60,000/year (~AED 100-130/TR/month). Comprehensive (150-500TR): AED 60,000-180,000/year. Enterprise (500TR+): AED 180,000-400,000/year. Price includes all MEP trades: HVAC, electrical, plumbing, and fire systems. Spare parts at trade cost.

What HVAC systems do you maintain? +

All types: air-cooled chillers, water-cooled chillers, cooling towers, AHUs, FAHUs, FCUs, VRF/multi-split, ductless split, ducted split, cassette units, package units. Brands: Carrier, Trane, York, Daikin, Mitsubishi, McQuay, Dunham Bush, and all others. From 50TR office systems to 2,000TR+ hotel plants.

What does comprehensive vs labour-only mean? +

Labour-only: technicians visit on schedule, you pay for all parts separately (often at 50-200% markup). Comprehensive: scheduled maintenance + emergency response + spare parts at trade cost (zero markup). Comprehensive costs more per month but delivers lower total annual cost because parts aren't marked up and preventive work reduces emergency spend.

How do you track chiller efficiency? +

Monthly kWh/TR readings. We log compressor power consumption and cooling output to calculate actual COP (Coefficient of Performance). Trending this data reveals gradual efficiency loss — typically from fouled condensers, low refrigerant, or worn bearings — allowing us to intervene before it hits your DEWA bill.

Do you handle DCD fire safety compliance? +

Yes — complete fire and life safety maintenance: fire pump testing (weekly/monthly), sprinkler valve inspections, smoke/heat detector testing, fire alarm panel maintenance, emergency light testing, pressurisation fan checks, fire door inspections. All documented in our digital system. Annual DCD inspection support with pre-inspection audit.

What is thermal imaging and why does it matter? +

Annual thermal imaging of all electrical panels detects invisible hotspots — loose connections, overloaded circuits, deteriorating insulation. A connection at 120°C looks normal visually but is months from failure or fire. Thermal imaging is included in our Comprehensive and Enterprise tiers. Most competitors don't offer it.

Can you take over from our current AMC contractor? +

Yes — seamless handover. We audit existing systems, assess condition, tag all assets, and build a new maintenance schedule. Any deferred maintenance from the previous contractor is identified and addressed in the first service cycle. No gap in coverage.

Do you provide on-site MEP technicians? +

For Enterprise tier (500TR+): dedicated on-site MEP team. For Comprehensive tier: regular scheduled visits by the same assigned team. Same technicians every time — they know your plant, your systems, your building's quirks.

What reporting do you provide? +

Monthly: jobs completed, SLA compliance, energy performance (kWh/TR), open work orders, parts consumed, cost breakdown. Quarterly: face-to-face review with management, trend analysis, upcoming capital expenditure forecast. Annual: full system condition report, lifecycle assessment, next-year recommendations.

How quickly can you respond to a chiller breakdown? +

Critical systems (chillers, fire pumps, main electrical): 2-hour SLA guaranteed. Our own MEP team dispatched — not a subcontractor we need to wake up. Critical spare parts (contactors, fuses, belts, filters) stocked on-site for Comprehensive and Enterprise tiers. Most chiller issues resolved same-day.

What about BMS and building automation? +

We coordinate with your BMS — alarm response, setpoint review, scheduling optimisation, trend analysis. We don't replace your BMS contractor, but we ensure the control systems and the physical MEP systems work together efficiently. Many AMC contractors ignore the BMS entirely.

Do you handle water treatment for cooling towers? +

Yes — cooling tower water treatment is critical in Dubai's climate. Chemical dosing, biocide treatment, legionella prevention, TDS monitoring, blowdown management. Included in Comprehensive and Enterprise tiers. Prevents biological growth and scale that destroy cooling tower performance.

Get a Free MEP Audit. Know Your Building's Real Condition.

Complete HVAC + MEP audit, asset inventory, efficiency assessment, and AMC proposal — free, no obligation. 50+ buildings maintained. SLA-backed.

Sun-Thu 9am-6pm GST · Free site visit anywhere in Dubai · 60-min response
Call Calc