Apartment renovation in Dubai costs AED 25,000 to AED 350,000 in 2026, depending on size and scope. A studio refresh starts at AED 25,000. A full 2-bedroom gut renovation runs AED 60,000 to AED 120,000. Penthouse transformations with premium finishes exceed AED 150,000. These are real numbers from 800+ completed projects across Dubai Marina, Downtown, JBR, Business Bay, and DIFC.
This guide gives you transparent pricing for every apartment type, explains the difference between post-handover fit-out and full renovation, and covers building approval requirements that most contractors forget to mention.
How Much Does Apartment Renovation Cost in Dubai?
The cost of apartment renovation in Dubai depends on three factors: apartment size, condition of existing finishes, and your material choices. Here is what you should expect to pay in 2026.
| Apartment Type | Basic Refresh | Full Renovation | Premium / Luxury |
|---|---|---|---|
| Studio (400-600 sqft) | AED 25,000 – 35,000 | AED 35,000 – 50,000 | AED 50,000 – 70,000 |
| 1-Bedroom (650-900 sqft) | AED 35,000 – 50,000 | AED 50,000 – 70,000 | AED 70,000 – 100,000 |
| 2-Bedroom (1,000-1,400 sqft) | AED 60,000 – 80,000 | AED 80,000 – 120,000 | AED 120,000 – 170,000 |
| 3-Bedroom (1,500-2,200 sqft) | AED 100,000 – 140,000 | AED 140,000 – 200,000 | AED 200,000 – 280,000 |
| Penthouse (2,500-5,000+ sqft) | AED 150,000 – 200,000 | AED 200,000 – 350,000 | AED 350,000 – 600,000+ |
Basic refresh includes painting, flooring replacement, lighting upgrades, and minor fixes. Full renovation adds kitchen and bathroom rebuild, new wardrobes, electrical rewiring, and layout modifications. Premium includes imported materials, custom joinery, smart home integration, and designer fixtures.
Apartment Renovation Cost by Size
Studio Apartment (AED 25,000 – 50,000)
Studio apartments in Dubai range from 400 to 600 sqft. The compact size means lower overall cost, but per-square-foot pricing is actually higher because you still need a full kitchen and bathroom renovation in a smaller footprint. Most studio renovations focus on maximising storage, updating the kitchen counter and splashback, refreshing the bathroom, and installing new flooring and paint throughout.
Budget studios in JVC or Sports City come in at AED 25,000-35,000. Marina or Downtown studios with premium finishes run AED 40,000-50,000.
1-Bedroom Apartment (AED 35,000 – 70,000)
The 1-bedroom apartment is Dubai's most common rental and owner-occupier unit. Renovation typically includes a full bathroom overhaul, kitchen upgrade, bedroom wardrobes, new flooring, painting, and updated lighting. The separate bedroom creates an additional space that needs wardrobe joinery and potentially false ceiling work.
At the lower end (AED 35,000-50,000), you get quality vinyl flooring, repainted kitchen cabinets, new countertops, refreshed bathroom tiles, and fresh paint. At the higher end (AED 50,000-70,000), you get porcelain tile flooring, custom kitchen cabinets, stone countertops, fully retiled bathroom with walk-in shower, and built-in wardrobes.
2-Bedroom Apartment (AED 60,000 – 120,000)
Two-bedroom apartments are the sweet spot for Dubai renovation. With 1,000-1,400 sqft, you typically have two bathrooms, a proper kitchen, and enough living space to justify real design work. The second bathroom adds AED 15,000-25,000 to the budget compared to a 1-bed renovation.
Most 2-bed owners invest AED 80,000-100,000 for a comprehensive renovation that transforms the apartment. This covers both bathrooms, kitchen, flooring throughout, wardrobes in both bedrooms, painting, lighting, and basic electrical upgrades.
3-Bedroom Apartment (AED 100,000 – 200,000)
Three-bedroom apartments in Dubai typically range from 1,500 to 2,200 sqft with two or three bathrooms, a larger kitchen, and often a maid's room. The additional bathroom and third bedroom add roughly AED 30,000-50,000 over a 2-bed renovation. Many 3-bed owners also invest in living room false ceilings, upgraded AC ducting, and feature walls.
Penthouse (AED 150,000 – 350,000+)
Penthouse renovation in Dubai is a different category entirely. Sizes range from 2,500 to 5,000+ sqft across single or duplex layouts. Double-height ceilings, terrace access, and premium locations demand designer-level finishes. Marble flooring, custom Italian kitchens, smart home automation, and bespoke joinery are standard. Structural modifications like adding a staircase feature or reconfiguring layouts require engineering approval.
Send us your apartment details on WhatsApp — we respond in under 15 minutes with a ballpark estimate.
Post-Handover Fit-Out vs Full Renovation
This distinction matters because it directly affects your budget. Many apartment owners in Dubai confuse the two, and contractors exploit this confusion.
Post-Handover Fit-Out
When a developer hands over your apartment, it often comes in shell-and-core or semi-finished condition. Post-handover fit-out means adding finishes to a brand-new space: installing flooring on clean screeded floors, building kitchen cabinets against fresh walls, fitting wardrobes in empty bedrooms, and painting virgin plaster.
Fit-out costs 20-30% less than full renovation because there is no demolition, no waste removal, no surprises behind old tiles, and no patching. A 2-bedroom post-handover fit-out typically costs AED 50,000-90,000 compared to AED 80,000-120,000 for a full renovation of the same size.
Full Renovation
Full renovation means stripping an older apartment back to its concrete shell and rebuilding everything. This involves demolishing existing kitchen and bathrooms, removing all flooring and wall tiles, rewiring electrical circuits, re-routing plumbing where needed, waterproofing wet areas, and then installing everything new. The demolition and prep work alone adds AED 10,000-25,000 depending on apartment size.
Full renovation is necessary for apartments older than 10-12 years, particularly in Dubai Marina, JBR, and The Greens where original developer finishes from 2005-2012 are now dated and deteriorating.
| Item | Post-Handover Fit-Out | Full Renovation |
|---|---|---|
| Demolition & waste removal | Not required | AED 5,000 – 15,000 |
| Waterproofing | Developer-provided | AED 3,000 – 8,000 |
| Electrical rewiring | Minimal (new points only) | AED 5,000 – 15,000 |
| Plumbing | Connection only | AED 3,000 – 10,000 |
| Hidden surprises | None (new build) | Budget 10-15% contingency |
| Total premium | Baseline | +20-30% over fit-out |
Apartment Renovation Cost by Room
If you are renovating specific rooms rather than the entire apartment, here is what each area costs independently.
| Room | Basic | Mid-Range | Premium |
|---|---|---|---|
| Kitchen | AED 15,000 – 25,000 | AED 25,000 – 45,000 | AED 45,000 – 80,000 |
| Bathroom | AED 10,000 – 18,000 | AED 18,000 – 30,000 | AED 30,000 – 55,000 |
| Flooring (full apartment) | AED 8,000 – 15,000 | AED 15,000 – 30,000 | AED 30,000 – 60,000 |
| Painting (full apartment) | AED 3,000 – 6,000 | AED 6,000 – 12,000 | AED 12,000 – 20,000 |
| Wardrobes (per bedroom) | AED 5,000 – 8,000 | AED 8,000 – 15,000 | AED 15,000 – 25,000 |
| False Ceiling | AED 4,000 – 8,000 | AED 8,000 – 15,000 | AED 15,000 – 30,000 |
| Electrical & Lighting | AED 3,000 – 6,000 | AED 6,000 – 12,000 | AED 12,000 – 25,000 |
Apartment kitchens are smaller than villa kitchens, so costs are lower. A typical apartment kitchen is 6-12 sqm compared to 15-35 sqm in a villa. See our kitchen renovation cost guide for detailed breakdowns.
Popular Communities and Building Management
Where your apartment is located affects both the cost and the process. Each community and building has its own rules, deposits, and quirks.
Dubai Marina
Marina towers built between 2005-2012 are prime renovation candidates. Original finishes are dated, and many units have basic developer-grade materials. Expect AED 50,000-120,000 for a 1-2 bed renovation. Building management in Marina towers is generally cooperative but strict on working hours. Deposits range from AED 5,000-10,000. Elevator booking for material delivery is required and can cause scheduling delays.
Downtown Dubai
Emaar-managed buildings in Downtown have well-established renovation procedures but higher deposits (AED 10,000-20,000). The premium location means most owners opt for premium finishes. A 2-bed renovation in Burj Khalifa or Boulevard towers typically runs AED 90,000-150,000. Older units in The Residences and Old Town benefit most from renovation.
JBR (Jumeirah Beach Residence)
JBR apartments from 2007-2009 are some of the most renovated units in Dubai. The original finishes have not aged well, and the beachfront location justifies investment. Building management requires detailed renovation plans and contractor documentation. Budget AED 60,000-130,000 for a 2-3 bed full renovation.
Business Bay
A mix of older towers (2008-2012) needing full renovation and newer developments (2018+) needing fit-out only. The Executive Towers cluster has particularly active renovation demand. Costs are 10-15% lower than Marina or Downtown for equivalent work due to simpler building management processes.
DIFC
Premium residential towers in DIFC (Index Tower, Central Park, Sky Gardens) attract high-end renovation budgets. Expect AED 100,000-200,000 for a 2-bed renovation. Building management is professional but deposits are among the highest in Dubai at AED 15,000-20,000.
| Community | 1-Bed Renovation | 2-Bed Renovation | Typical Deposit |
|---|---|---|---|
| Dubai Marina | AED 40,000 – 70,000 | AED 70,000 – 120,000 | AED 5,000 – 10,000 |
| Downtown Dubai | AED 50,000 – 85,000 | AED 90,000 – 150,000 | AED 10,000 – 20,000 |
| JBR | AED 45,000 – 75,000 | AED 75,000 – 130,000 | AED 8,000 – 15,000 |
| Business Bay | AED 35,000 – 60,000 | AED 60,000 – 100,000 | AED 5,000 – 10,000 |
| DIFC | AED 55,000 – 90,000 | AED 100,000 – 200,000 | AED 15,000 – 20,000 |
| JVC / JVT | AED 30,000 – 50,000 | AED 50,000 – 85,000 | AED 3,000 – 5,000 |
| The Greens / Views | AED 40,000 – 65,000 | AED 65,000 – 110,000 | AED 5,000 – 8,000 |
Building Approval Process for Apartment Renovation
Unlike villa renovation, apartment renovation requires building management approval before any work begins. Skip this step and you risk fines, work stoppages, and withheld deposits.
Step 1: No Objection Certificate (NOC)
Submit a renovation request to your building management office. You will need: title deed or tenancy contract, contractor trade licence copy, scope of work document, and sometimes architectural drawings for major renovations. Processing takes 3-7 working days.
Step 2: Refundable Deposit
Building management charges a refundable deposit to cover potential damage to common areas during renovation. This ranges from AED 3,000 in smaller buildings to AED 20,000 in premium towers. The deposit is returned after final inspection, typically within 30 days of project completion.
Step 3: Working Hours and Restrictions
Most Dubai buildings permit renovation work Monday to Saturday, 9:00 AM to 5:00 PM. Some buildings allow extended hours until 6:00 PM. No work on Sundays or public holidays. Noise-generating activities (demolition, drilling, hammering) are often restricted to 10:00 AM to 4:00 PM. Violations result in warnings, fines, or work stoppage.
Step 4: Material Delivery and Waste
Buildings designate specific elevator access times for material delivery, usually early morning (7-9 AM) or designated service elevator hours. All construction waste must be removed daily or stored in designated areas. Your contractor is responsible for protecting common area flooring and walls during material transport.
Step 5: Final Inspection
Building management conducts a final inspection to verify no structural changes were made without approval, no damage to common areas occurred, and all waste has been removed. Pass the inspection and your deposit is returned.
NOC applications, deposits, inspections — we manage the entire approval process so you don't have to.
Apartment Renovation Timeline
Apartment renovations are faster than villa projects due to smaller scope, but building management restrictions on working hours can extend timelines. Here is what to expect.
| Scope | Timeline | Notes |
|---|---|---|
| Cosmetic refresh (paint + flooring) | 1 – 2 weeks | Minimal disruption, can be done room by room |
| Studio full renovation | 2 – 3 weeks | Compact space means faster completion |
| 1-bed full renovation | 3 – 4 weeks | Kitchen and bathroom drive the timeline |
| 2-bed full renovation | 4 – 6 weeks | Two bathrooms add 1-2 weeks |
| 3-bed full renovation | 5 – 7 weeks | Multiple bathrooms and larger kitchen |
| Penthouse full renovation | 6 – 8 weeks | Larger scope, often includes structural work |
Add 1-2 weeks for building management NOC processing before work begins. Add another week for material procurement if you are choosing custom or imported finishes. The total project timeline from initial enquiry to move-in is typically 6-12 weeks.
How to Save on Apartment Renovation Without Sacrificing Quality
Keep existing layout — moving plumbing and electrical points in an apartment is expensive and requires additional approvals. Work within the existing footprint to save 15-20%.
Choose engineered stone over natural marble — Silestone or Caesarstone countertops look nearly identical to marble at 40% less cost, and they do not stain or require sealing.
Vinyl plank flooring instead of porcelain — modern luxury vinyl plank (LVP) is waterproof, scratch-resistant, and costs AED 15-25/sqft installed versus AED 35-60/sqft for porcelain tiles. For apartments, LVP is often the smarter choice.
Renovate in summer — contractors have more availability from June to August, and you can often negotiate 10-15% better pricing.
Batch your neighbours — if multiple units in your building are renovating simultaneously, contractors can offer volume discounts on materials and mobilisation.
Frequently Asked Questions
How much does it cost to renovate a studio apartment in Dubai?
A studio apartment renovation in Dubai costs AED 25,000 to AED 50,000 in 2026. This covers painting, flooring, bathroom refresh, kitchen updates, and lighting. A full gut renovation with custom joinery and premium materials can reach AED 60,000-70,000.
How much does a 1-bedroom apartment renovation cost in Dubai?
A 1-bedroom apartment renovation in Dubai costs AED 35,000 to AED 70,000. This typically includes kitchen and bathroom renovation, new flooring throughout, painting, wardrobes, and updated lighting. Premium finishes with imported materials push costs to AED 80,000-100,000.
What is the difference between post-handover fit-out and full renovation?
Post-handover fit-out is finishing a brand-new apartment from the developer's shell condition — adding flooring, kitchen, wardrobes, and paint on fresh surfaces. Full renovation means stripping out existing finishes in an older apartment and replacing everything. Fit-out costs 20-30% less because there is no demolition, waste removal, or hidden surprises.
Do I need building management approval to renovate my apartment?
Yes. Every apartment renovation in Dubai requires a No Objection Certificate (NOC) from building management. You will also need to pay a refundable deposit (AED 5,000-20,000), follow permitted working hours (usually 9am-5pm weekdays), and submit contractor documentation including trade licence and insurance.
How long does an apartment renovation take in Dubai?
A typical apartment renovation takes 3-8 weeks depending on scope. A cosmetic refresh (painting and flooring) takes 1-2 weeks. A full 2-bed renovation takes 4-6 weeks. Penthouse or 3-bed full renovations take 6-8 weeks. Building management restrictions on working hours can extend timelines by 1-2 weeks.
Can I live in my apartment during renovation?
Not recommended for full renovations due to dust, noise, and safety hazards. For cosmetic updates like painting one room at a time, it is possible but uncomfortable. Most clients move out or stay in a hotel for 3-6 weeks. Budget AED 5,000-15,000 for temporary accommodation if needed.
What is the cost per square foot for apartment renovation in Dubai?
Apartment renovation in Dubai costs AED 30-80 per square foot depending on scope and finishes. Basic cosmetic refresh runs AED 30-45/sqft. Mid-range renovation with new kitchen and bathrooms runs AED 45-65/sqft. Luxury renovation with premium materials runs AED 65-80+/sqft.
Which Dubai communities are most popular for apartment renovation?
Dubai Marina, Downtown Dubai, JBR, Business Bay, and DIFC are the most popular communities for apartment renovation. Marina and JBR apartments from 2005-2012 are prime candidates for full renovation as original finishes are dated. Newer buildings in Business Bay and Downtown often need post-handover fit-out only.
Plan Your Apartment Renovation
Want a quick estimate? Our renovation calculator gives you a personalised apartment budget in under 60 seconds.
For the full picture, download the 2026 Dubai Renovation Cost Guide with room-by-room breakdowns across every major community.
Ready to Renovate Your Apartment?
Based on 800+ completed projects across Dubai. Free quote, no obligation.
Get the Full 2026 Cost Guide
Download our complete renovation pricing guide with community-specific breakdowns.
Related Cost Guides
- Villa Renovation Cost 2026
- Kitchen Renovation Cost 2026
- Bathroom Renovation Cost 2026
- Villa Extension Cost 2026
- Pool Construction Cost 2026
- Apartment Renovation Cost 2026
Explore by community: Emirates Hills · Arabian Ranches · Palm Jumeirah · Dubai Hills