Apartment renovation in Dubai costs AED 25,000 to AED 350,000 in 2026, depending on size and scope. A studio refresh starts at AED 25,000. A full 2-bedroom gut renovation runs AED 60,000 to AED 120,000. Penthouse transformations with premium finishes exceed AED 150,000. These are real numbers from 800+ completed projects across Dubai Marina, Downtown, JBR, Business Bay, and DIFC.

This guide gives you transparent pricing for every apartment type, explains the difference between post-handover fit-out and full renovation, and covers building approval requirements that most contractors forget to mention.

How Much Does Apartment Renovation Cost in Dubai?

The cost of apartment renovation in Dubai depends on three factors: apartment size, condition of existing finishes, and your material choices. Here is what you should expect to pay in 2026.

Apartment TypeBasic RefreshFull RenovationPremium / Luxury
Studio (400-600 sqft)AED 25,000 – 35,000AED 35,000 – 50,000AED 50,000 – 70,000
1-Bedroom (650-900 sqft)AED 35,000 – 50,000AED 50,000 – 70,000AED 70,000 – 100,000
2-Bedroom (1,000-1,400 sqft)AED 60,000 – 80,000AED 80,000 – 120,000AED 120,000 – 170,000
3-Bedroom (1,500-2,200 sqft)AED 100,000 – 140,000AED 140,000 – 200,000AED 200,000 – 280,000
Penthouse (2,500-5,000+ sqft)AED 150,000 – 200,000AED 200,000 – 350,000AED 350,000 – 600,000+

Basic refresh includes painting, flooring replacement, lighting upgrades, and minor fixes. Full renovation adds kitchen and bathroom rebuild, new wardrobes, electrical rewiring, and layout modifications. Premium includes imported materials, custom joinery, smart home integration, and designer fixtures.

Apartment Renovation Cost by Size

Studio Apartment (AED 25,000 – 50,000)

Studio apartments in Dubai range from 400 to 600 sqft. The compact size means lower overall cost, but per-square-foot pricing is actually higher because you still need a full kitchen and bathroom renovation in a smaller footprint. Most studio renovations focus on maximising storage, updating the kitchen counter and splashback, refreshing the bathroom, and installing new flooring and paint throughout.

Budget studios in JVC or Sports City come in at AED 25,000-35,000. Marina or Downtown studios with premium finishes run AED 40,000-50,000.

1-Bedroom Apartment (AED 35,000 – 70,000)

The 1-bedroom apartment is Dubai's most common rental and owner-occupier unit. Renovation typically includes a full bathroom overhaul, kitchen upgrade, bedroom wardrobes, new flooring, painting, and updated lighting. The separate bedroom creates an additional space that needs wardrobe joinery and potentially false ceiling work.

At the lower end (AED 35,000-50,000), you get quality vinyl flooring, repainted kitchen cabinets, new countertops, refreshed bathroom tiles, and fresh paint. At the higher end (AED 50,000-70,000), you get porcelain tile flooring, custom kitchen cabinets, stone countertops, fully retiled bathroom with walk-in shower, and built-in wardrobes.

2-Bedroom Apartment (AED 60,000 – 120,000)

Two-bedroom apartments are the sweet spot for Dubai renovation. With 1,000-1,400 sqft, you typically have two bathrooms, a proper kitchen, and enough living space to justify real design work. The second bathroom adds AED 15,000-25,000 to the budget compared to a 1-bed renovation.

Most 2-bed owners invest AED 80,000-100,000 for a comprehensive renovation that transforms the apartment. This covers both bathrooms, kitchen, flooring throughout, wardrobes in both bedrooms, painting, lighting, and basic electrical upgrades.

3-Bedroom Apartment (AED 100,000 – 200,000)

Three-bedroom apartments in Dubai typically range from 1,500 to 2,200 sqft with two or three bathrooms, a larger kitchen, and often a maid's room. The additional bathroom and third bedroom add roughly AED 30,000-50,000 over a 2-bed renovation. Many 3-bed owners also invest in living room false ceilings, upgraded AC ducting, and feature walls.

Penthouse (AED 150,000 – 350,000+)

Penthouse renovation in Dubai is a different category entirely. Sizes range from 2,500 to 5,000+ sqft across single or duplex layouts. Double-height ceilings, terrace access, and premium locations demand designer-level finishes. Marble flooring, custom Italian kitchens, smart home automation, and bespoke joinery are standard. Structural modifications like adding a staircase feature or reconfiguring layouts require engineering approval.

Get your apartment renovation quote
Send us your apartment details on WhatsApp — we respond in under 15 minutes with a ballpark estimate.
Get Free Quote

Post-Handover Fit-Out vs Full Renovation

This distinction matters because it directly affects your budget. Many apartment owners in Dubai confuse the two, and contractors exploit this confusion.

Post-Handover Fit-Out

When a developer hands over your apartment, it often comes in shell-and-core or semi-finished condition. Post-handover fit-out means adding finishes to a brand-new space: installing flooring on clean screeded floors, building kitchen cabinets against fresh walls, fitting wardrobes in empty bedrooms, and painting virgin plaster.

Fit-out costs 20-30% less than full renovation because there is no demolition, no waste removal, no surprises behind old tiles, and no patching. A 2-bedroom post-handover fit-out typically costs AED 50,000-90,000 compared to AED 80,000-120,000 for a full renovation of the same size.

Full Renovation

Full renovation means stripping an older apartment back to its concrete shell and rebuilding everything. This involves demolishing existing kitchen and bathrooms, removing all flooring and wall tiles, rewiring electrical circuits, re-routing plumbing where needed, waterproofing wet areas, and then installing everything new. The demolition and prep work alone adds AED 10,000-25,000 depending on apartment size.

Full renovation is necessary for apartments older than 10-12 years, particularly in Dubai Marina, JBR, and The Greens where original developer finishes from 2005-2012 are now dated and deteriorating.

ItemPost-Handover Fit-OutFull Renovation
Demolition & waste removalNot requiredAED 5,000 – 15,000
WaterproofingDeveloper-providedAED 3,000 – 8,000
Electrical rewiringMinimal (new points only)AED 5,000 – 15,000
PlumbingConnection onlyAED 3,000 – 10,000
Hidden surprisesNone (new build)Budget 10-15% contingency
Total premiumBaseline+20-30% over fit-out

Apartment Renovation Cost by Room

If you are renovating specific rooms rather than the entire apartment, here is what each area costs independently.

RoomBasicMid-RangePremium
KitchenAED 15,000 – 25,000AED 25,000 – 45,000AED 45,000 – 80,000
BathroomAED 10,000 – 18,000AED 18,000 – 30,000AED 30,000 – 55,000
Flooring (full apartment)AED 8,000 – 15,000AED 15,000 – 30,000AED 30,000 – 60,000
Painting (full apartment)AED 3,000 – 6,000AED 6,000 – 12,000AED 12,000 – 20,000
Wardrobes (per bedroom)AED 5,000 – 8,000AED 8,000 – 15,000AED 15,000 – 25,000
False CeilingAED 4,000 – 8,000AED 8,000 – 15,000AED 15,000 – 30,000
Electrical & LightingAED 3,000 – 6,000AED 6,000 – 12,000AED 12,000 – 25,000

Apartment kitchens are smaller than villa kitchens, so costs are lower. A typical apartment kitchen is 6-12 sqm compared to 15-35 sqm in a villa. See our kitchen renovation cost guide for detailed breakdowns.

Popular Communities and Building Management

Where your apartment is located affects both the cost and the process. Each community and building has its own rules, deposits, and quirks.

Dubai Marina

Marina towers built between 2005-2012 are prime renovation candidates. Original finishes are dated, and many units have basic developer-grade materials. Expect AED 50,000-120,000 for a 1-2 bed renovation. Building management in Marina towers is generally cooperative but strict on working hours. Deposits range from AED 5,000-10,000. Elevator booking for material delivery is required and can cause scheduling delays.

Downtown Dubai

Emaar-managed buildings in Downtown have well-established renovation procedures but higher deposits (AED 10,000-20,000). The premium location means most owners opt for premium finishes. A 2-bed renovation in Burj Khalifa or Boulevard towers typically runs AED 90,000-150,000. Older units in The Residences and Old Town benefit most from renovation.

JBR (Jumeirah Beach Residence)

JBR apartments from 2007-2009 are some of the most renovated units in Dubai. The original finishes have not aged well, and the beachfront location justifies investment. Building management requires detailed renovation plans and contractor documentation. Budget AED 60,000-130,000 for a 2-3 bed full renovation.

Business Bay

A mix of older towers (2008-2012) needing full renovation and newer developments (2018+) needing fit-out only. The Executive Towers cluster has particularly active renovation demand. Costs are 10-15% lower than Marina or Downtown for equivalent work due to simpler building management processes.

DIFC

Premium residential towers in DIFC (Index Tower, Central Park, Sky Gardens) attract high-end renovation budgets. Expect AED 100,000-200,000 for a 2-bed renovation. Building management is professional but deposits are among the highest in Dubai at AED 15,000-20,000.

Community1-Bed Renovation2-Bed RenovationTypical Deposit
Dubai MarinaAED 40,000 – 70,000AED 70,000 – 120,000AED 5,000 – 10,000
Downtown DubaiAED 50,000 – 85,000AED 90,000 – 150,000AED 10,000 – 20,000
JBRAED 45,000 – 75,000AED 75,000 – 130,000AED 8,000 – 15,000
Business BayAED 35,000 – 60,000AED 60,000 – 100,000AED 5,000 – 10,000
DIFCAED 55,000 – 90,000AED 100,000 – 200,000AED 15,000 – 20,000
JVC / JVTAED 30,000 – 50,000AED 50,000 – 85,000AED 3,000 – 5,000
The Greens / ViewsAED 40,000 – 65,000AED 65,000 – 110,000AED 5,000 – 8,000

Building Approval Process for Apartment Renovation

Unlike villa renovation, apartment renovation requires building management approval before any work begins. Skip this step and you risk fines, work stoppages, and withheld deposits.

Step 1: No Objection Certificate (NOC)

Submit a renovation request to your building management office. You will need: title deed or tenancy contract, contractor trade licence copy, scope of work document, and sometimes architectural drawings for major renovations. Processing takes 3-7 working days.

Step 2: Refundable Deposit

Building management charges a refundable deposit to cover potential damage to common areas during renovation. This ranges from AED 3,000 in smaller buildings to AED 20,000 in premium towers. The deposit is returned after final inspection, typically within 30 days of project completion.

Step 3: Working Hours and Restrictions

Most Dubai buildings permit renovation work Monday to Saturday, 9:00 AM to 5:00 PM. Some buildings allow extended hours until 6:00 PM. No work on Sundays or public holidays. Noise-generating activities (demolition, drilling, hammering) are often restricted to 10:00 AM to 4:00 PM. Violations result in warnings, fines, or work stoppage.

Step 4: Material Delivery and Waste

Buildings designate specific elevator access times for material delivery, usually early morning (7-9 AM) or designated service elevator hours. All construction waste must be removed daily or stored in designated areas. Your contractor is responsible for protecting common area flooring and walls during material transport.

Step 5: Final Inspection

Building management conducts a final inspection to verify no structural changes were made without approval, no damage to common areas occurred, and all waste has been removed. Pass the inspection and your deposit is returned.

We handle all building approvals
NOC applications, deposits, inspections — we manage the entire approval process so you don't have to.
Ask Us About Approvals

Apartment Renovation Timeline

Apartment renovations are faster than villa projects due to smaller scope, but building management restrictions on working hours can extend timelines. Here is what to expect.

ScopeTimelineNotes
Cosmetic refresh (paint + flooring)1 – 2 weeksMinimal disruption, can be done room by room
Studio full renovation2 – 3 weeksCompact space means faster completion
1-bed full renovation3 – 4 weeksKitchen and bathroom drive the timeline
2-bed full renovation4 – 6 weeksTwo bathrooms add 1-2 weeks
3-bed full renovation5 – 7 weeksMultiple bathrooms and larger kitchen
Penthouse full renovation6 – 8 weeksLarger scope, often includes structural work

Add 1-2 weeks for building management NOC processing before work begins. Add another week for material procurement if you are choosing custom or imported finishes. The total project timeline from initial enquiry to move-in is typically 6-12 weeks.

How to Save on Apartment Renovation Without Sacrificing Quality

Keep existing layout — moving plumbing and electrical points in an apartment is expensive and requires additional approvals. Work within the existing footprint to save 15-20%.

Choose engineered stone over natural marble — Silestone or Caesarstone countertops look nearly identical to marble at 40% less cost, and they do not stain or require sealing.

Vinyl plank flooring instead of porcelain — modern luxury vinyl plank (LVP) is waterproof, scratch-resistant, and costs AED 15-25/sqft installed versus AED 35-60/sqft for porcelain tiles. For apartments, LVP is often the smarter choice.

Renovate in summer — contractors have more availability from June to August, and you can often negotiate 10-15% better pricing.

Batch your neighbours — if multiple units in your building are renovating simultaneously, contractors can offer volume discounts on materials and mobilisation.

Modern apartment renovation Dubai

Frequently Asked Questions

How much does it cost to renovate a studio apartment in Dubai?

A studio apartment renovation in Dubai costs AED 25,000 to AED 50,000 in 2026. This covers painting, flooring, bathroom refresh, kitchen updates, and lighting. A full gut renovation with custom joinery and premium materials can reach AED 60,000-70,000.

How much does a 1-bedroom apartment renovation cost in Dubai?

A 1-bedroom apartment renovation in Dubai costs AED 35,000 to AED 70,000. This typically includes kitchen and bathroom renovation, new flooring throughout, painting, wardrobes, and updated lighting. Premium finishes with imported materials push costs to AED 80,000-100,000.

What is the difference between post-handover fit-out and full renovation?

Post-handover fit-out is finishing a brand-new apartment from the developer's shell condition — adding flooring, kitchen, wardrobes, and paint on fresh surfaces. Full renovation means stripping out existing finishes in an older apartment and replacing everything. Fit-out costs 20-30% less because there is no demolition, waste removal, or hidden surprises.

Do I need building management approval to renovate my apartment?

Yes. Every apartment renovation in Dubai requires a No Objection Certificate (NOC) from building management. You will also need to pay a refundable deposit (AED 5,000-20,000), follow permitted working hours (usually 9am-5pm weekdays), and submit contractor documentation including trade licence and insurance.

How long does an apartment renovation take in Dubai?

A typical apartment renovation takes 3-8 weeks depending on scope. A cosmetic refresh (painting and flooring) takes 1-2 weeks. A full 2-bed renovation takes 4-6 weeks. Penthouse or 3-bed full renovations take 6-8 weeks. Building management restrictions on working hours can extend timelines by 1-2 weeks.

Can I live in my apartment during renovation?

Not recommended for full renovations due to dust, noise, and safety hazards. For cosmetic updates like painting one room at a time, it is possible but uncomfortable. Most clients move out or stay in a hotel for 3-6 weeks. Budget AED 5,000-15,000 for temporary accommodation if needed.

What is the cost per square foot for apartment renovation in Dubai?

Apartment renovation in Dubai costs AED 30-80 per square foot depending on scope and finishes. Basic cosmetic refresh runs AED 30-45/sqft. Mid-range renovation with new kitchen and bathrooms runs AED 45-65/sqft. Luxury renovation with premium materials runs AED 65-80+/sqft.

Which Dubai communities are most popular for apartment renovation?

Dubai Marina, Downtown Dubai, JBR, Business Bay, and DIFC are the most popular communities for apartment renovation. Marina and JBR apartments from 2005-2012 are prime candidates for full renovation as original finishes are dated. Newer buildings in Business Bay and Downtown often need post-handover fit-out only.

📚

Free: 2026 Dubai Renovation Cost Guide

Get real pricing from 800+ projects, material comparisons, and red flags to watch for.

Download the Free Guide
🕑

Compare Renovation Companies in Dubai

See how Dubai's top renovation contractors compare on price, quality, and timeline.

Read the Comparison

Plan Your Apartment Renovation

Want a quick estimate? Our renovation calculator gives you a personalised apartment budget in under 60 seconds.

For the full picture, download the 2026 Dubai Renovation Cost Guide with room-by-room breakdowns across every major community.

Ready to Renovate Your Apartment?

Based on 800+ completed projects across Dubai. Free quote, no obligation.

Get the Full 2026 Cost Guide

Download our complete renovation pricing guide with community-specific breakdowns.

No spam. Unsubscribe anytime.

Related Cost Guides

Explore by community: Emirates Hills · Arabian Ranches · Palm Jumeirah · Dubai Hills

Explore More

Apartment Renovation Services

Apartment RenovationKitchen RenovationBathroom RenovationPaintingFlooringJoinery & Wardrobes

Cost Guides

Full Cost GuideVilla Renovation CostKitchen CostBathroom CostApartment Cost

Popular Communities

Palm JumeirahDubai HillsEmirates HillsArabian RanchesJVC & JVT