First Unicorn Interiors
APARTMENT RENOVATION · DUBAI · FIXED PRICE · 3-YR WARRANTY
Renovated luxury apartment interior in Dubai — open-plan living room by First Unicorn Interiors
★ DUBAI APARTMENT & PENTHOUSE SPECIALISTS

Apartment Renovation in Dubai

Design-and-build apartment renovation across Dubai — Marina, Downtown, JLT, Business Bay, Palm Jumeirah, Dubai Hills. Fixed-price BOQ, building-management NOC handled in-house, wet areas fully waterproofed, 8–12 week turnaround. 3-year warranty across 800+ UAE projects.

★★★★★ 4.9/5 from 127 verified Google reviews

Quick Answer · Apartment Renovation Dubai

An apartment renovation in Dubai costs AED 60,000–150,000 for a refresh, AED 150,000–400,000 for a full renovation, and AED 400,000+ for a bespoke or penthouse remodel. A full renovation takes 8–12 weeks. Nearly every Dubai tower requires a building-management fit-out NOC before work starts — First Unicorn Interiors secures it in-house, waterproof-tanks all wet areas, quotes a fixed-price BOQ and warranties the work for 3 years.

800+Projects Delivered
3-YrWarranty
FixedPrice BOQ
NOCHandled In-House
8–12Week Turnaround
4.9★127 Google Reviews
THE PROBLEM

Why Apartment Renovations Go Wrong in Dubai Towers

Renovating inside a live, occupied high-rise is nothing like renovating a villa. After 800+ UAE projects, these are the four failures we're called in to fix — and how we prevent every one.

The NOC that never gets approved

Building management won't release a fit-out NOC without insurance certificates, method statements, MEP drawings and contractor registration. Owners lose weeks bouncing between contractor and building. We prepare the full submission pack and deal with management directly — it's our paperwork, not yours.

Wet-works that flood the unit below

The most expensive apartment-renovation failure in Dubai is a bathroom that leaks into the apartment downstairs. We waterproof-tank every wet area, flood-test before a single tile goes down, and warranty it for 3 years.

Quotes that grow every week

Vague lump-sum quotes turn into variation claims once the walls are open. Our quote is a fixed, itemised bill of quantities — line by line, brand by brand. The price only moves if you change the scope.

Neighbours, noise and blacklisted contractors

Miss the tower's working hours or skip floor protection in the corridors and the building can stop your project mid-way. We manage access, lift bookings, debris removal and quiet hours to each building's own fit-out manual.

WHY DUBAI OWNERS CHOOSE US

One Design-and-Build Team, One Fixed Price, One Deadline

No separate designer, contractor and PRO shuffling blame. First Unicorn Interiors designs, gets the approvals and builds — with a single point of accountability from first visit to handover.

High-Rise Specialists

Apartments and penthouses are our core work — tower logistics, service risers, false-ceiling MEP and building rules are daily routine, not a surprise.

Building NOC Handled

Fit-out NOC, insurance, method statements and any authority permits — prepared, submitted and secured in-house before work starts.

Tanked & Flood-Tested

Every bathroom and kitchen fully waterproofed and flood-tested before tiling — no leaks to the unit below, guaranteed for 3 years.

Smart Reconfiguration

Open-plan kitchens, walk-in wardrobes, home offices and combined units — redesigned within what the structure and the building allow.

Free 3D Design

See your renovated apartment in 3D before you commit a dirham to construction.

Fixed Price, Fixed Date

One itemised BOQ, one team, one written handover date. 8–12 weeks for a full renovation.

WHERE WE WORK

Apartment Renovation Across Dubai's Key Communities

Every tower has its own fit-out manual, working hours and NOC process. These are the communities where we renovate apartments week in, week out.

Dubai Marina

High-rise towers with strict lift-booking and working-hour rules. Waterfront units where kitchens, bathrooms and flooring upgrades top the request list.

Downtown Dubai

Emaar-managed towers around Burj Khalifa and the Opera District. Premium finishes expected; fit-out submissions reviewed closely — we submit them right the first time.

Jumeirah Lake Towers (JLT)

DMCC free-zone community with cluster-by-cluster building management. Great-value stock where a full renovation transforms older interiors.

Business Bay

Mixed residential towers along the canal. Popular with investors — we run renovation packages that maximise rental and resale value per dirham.

Palm Jumeirah

Shoreline, Golden Mile and beachfront towers under Trakhees jurisdiction rather than Dubai Municipality — a different permit route we handle routinely.

Dubai Hills Estate

Newer Emaar buildings where owners upgrade developer-standard finishes to bespoke kitchens, joinery and flooring soon after handover.

WHAT WE RENOVATE

From a Single Bathroom to a Full Penthouse Remodel

Design-and-build means everything sits under one contract: design, approvals, demolition, MEP, finishes and a furniture-ready handover.

Renovated penthouse kitchen in Dubai with stone worktops and custom cabinetry
Kitchens — layout, stone, appliances & joinery
Marble master bathroom renovation in a Dubai penthouse — walk-in shower and vanity
Bathrooms — tanked, flood-tested, marble-finished
Renovated apartment living room in Dubai — real First Unicorn Interiors project
Living spaces — flooring, ceilings, lighting & TV walls
Renovated apartment bedroom in Dubai with built-in wardrobes — real project
Bedrooms — built-in wardrobes & walk-in closets

Full apartment renovation

Complete strip-out, new kitchen and bathrooms, flooring throughout, false ceilings with new lighting design, repaint, joinery and re-wiring where needed. The 8–12 week flagship package.

Penthouse & duplex remodels

Larger floorplates, double-height spaces and terraces call for a higher grade of engineering and finish — book-matched stone, bespoke joinery, smart-home integration and hotel-grade bathrooms.

Layout reconfiguration

Opening a closed kitchen into the living space, converting a maid's room into a home office, or combining two units — assessed structurally, approved with the building, then built.

Investor upgrade packages

Focused kitchen-bathroom-flooring packages engineered to lift rental yield and resale value, delivered fast between tenancies.

TRANSPARENT PRICING

Apartment Renovation Prices in Dubai — Fixed, No Surprises

Three clear tiers. Every one includes free 3D design, building-NOC handling, full waterproofing of wet areas and a 3-year warranty.

Refresh

AED 60,000 – AED 150,000
Cosmetic / fast-track
  • Repaint + new flooring
  • Kitchen & bathroom refresh
  • New joinery & lighting
  • 4–6 week turnaround
Get Fixed Quote →

Bespoke / Penthouse

AED 400,000 – AED 1,200,000+
Turnkey / bespoke
  • Bespoke penthouse remodel
  • Premium imported finishes
  • Smart-home + mood lighting
  • Custom joinery throughout
  • Full MEP renewal
  • Turnkey handover
Get Fixed Quote →
Prices are indicative for typical 1–4 bedroom Dubai apartments; penthouses and duplexes quoted on scope. Building-NOC and authority fees are paid at cost — never marked up. Exact fixed BOQ after a free design visit.
OUR PROCESS

How We Deliver Your Dubai Apartment Renovation

A proven design-and-build sequence refined across 800+ UAE projects — approvals run in parallel with design so no time is wasted.

1

Free Design Visit

Week 1

We survey your apartment, check the building's fit-out manual and listen to how you want to live. Free, anywhere in Dubai.

2

3D Design + Fixed BOQ

Week 1–3

3D visuals, material boards and a fixed, itemised bill of quantities. You approve every line before anything is ordered.

3

Building NOC

Week 2–4

Fit-out NOC, insurances and any authority permits secured in-house; lift bookings, access and protection arranged with management.

4

Strip-Out & Build

Week 4–10

Strip-out, MEP first fix, waterproofing and flood test, then tiling, joinery, paint and finishes — one team end to end.

5

Snag & Handover

Week 10–12

Joint snagging, deep clean, building sign-off and handover pack — with your 3-year warranty in writing.

APPROVALS & NOC

Building NOCs & Authority Permits — Handled In-House

Almost every Dubai tower requires a building-management fit-out NOC before work begins, and structural or plumbing changes need an authority permit. We secure all of it for you, in parallel, before site start.

Building-Management NOC

Insurance certificates, method statements, drawings and contractor registration — the full submission pack, prepared and chased by us.

Dubai Municipality (DM)

Permits for structural openings, plumbing relocations and layout changes in DM-jurisdiction buildings.

Trakhees (PCFC)

Palm Jumeirah and other freehold zones fall under Trakhees, not DM — a different submission route we process routinely.

Dubai Development Authority (DDA)

Approvals for towers within DDA-governed districts and free zones.

DEWA

Electrical load changes, new circuits and plumbing connection approvals where the scope requires them.

Master Communities

Emaar, Nakheel, Meraas and DMCC community rules — working hours, contractor passes and material movement, managed to the letter.

FREQUENTLY ASKED

Apartment Renovation in Dubai — Your Questions

The questions Dubai apartment owners ask most. Don't see yours? WhatsApp us — we reply fast.

How much does an apartment renovation cost in Dubai? +

A cosmetic refresh runs AED 60,000–150,000, a full renovation AED 150,000–400,000, and a bespoke or penthouse remodel AED 400,000+. The exact figure depends on size, scope and finish level — we quote a fixed, itemised BOQ after a free design visit, and that price holds.

How long does an apartment renovation take? +

A refresh takes 4–6 weeks, a full renovation 8–12 weeks, and a bespoke or penthouse remodel 3–5 months. NOC processing runs in parallel with design so the site start isn't delayed, and we commit to the handover date in writing.

Do I need an NOC to renovate my apartment in Dubai? +

Yes — almost every Dubai tower requires a building-management fit-out NOC before any work starts, and moving plumbing or walls needs an authority permit (DM, Trakhees or DDA depending on the district). We prepare the drawings, submit the application and secure both in-house.

Will my bathroom renovation leak into the apartment below? +

Not on our projects. We fully waterproof-tank every wet area, flood-test before tiling, and document the test for the building's records. It's the single biggest apartment-renovation risk in Dubai and we engineer it out — backed by our 3-year warranty.

Can I live in the apartment during the renovation? +

For a light refresh, often yes — we phase rooms so you keep a working kitchen and bathroom. For a full renovation with strip-out and MEP work, we recommend vacating; the job runs faster and cheaper, which usually offsets short-term accommodation.

Which areas of Dubai do you cover? +

All of Dubai — with deep, repeated experience in Dubai Marina, Downtown Dubai, JLT, Business Bay, Palm Jumeirah and Dubai Hills Estate. We already know the fit-out rules, working hours and NOC processes of the major towers and master communities.

Is your quote really fixed? +

Yes. After the free design visit you receive a fixed-price, itemised bill of quantities. The price only changes if you change the scope. No hourly billing, no percentage fees, no surprise variations at handover.

Get Your Dubai Apartment Renovation Quote

Free design visit anywhere in Dubai. Fixed-price BOQ. Building NOC handled in-house. 8–12 week turnaround. 3-year warranty across 800+ projects.

Free site visit anywhere in Dubai · info@unicornrenovations.com
📞 Call Pricing