Cut Your DEWA Bill With Solar Panels in Dubai.

Send your DEWA bill — we calculate your exact system size, monthly savings and payback period before a site visit. DEWA Shams approved. 25-year warranty. Villas from AED 15K. Commercial from AED 50K. 800+ projects delivered.

QUICK SAVINGS ESTIMATE - 30 SECONDS
What's your monthly DEWA bill?
AED 0
Saved / Month
--
System Size
--
Payback (Years)
WhatsApp my full ROI study
Reply within 60 min · Free ROI study in 48 hrs · No-obligation
★★★★★ 4.9/5 from 127 verified Google reviews
RECENT PROJECTS

Solar Installations Across Dubai

Recent solar projects — villas, commercial, hybrid systems. All DEWA Shams Dubai approved.

Solar panels on Palm Jumeirah villa
PALM JUMEIRAH

10 kW Villa Rooftop

10 kW system on 5-bedroom villa. 18 panels, hybrid inverter, battery-ready. Monthly DEWA bill went from AED 2,800 to AED 280. 4.5 year payback.

10 kWTier 1 Panels
90%Bill Reduction
4.5 yrPayback
Solar panels on Emirates Hills mansion
EMIRATES HILLS

22 kW Mansion System

22 kW system on 8-bedroom mansion. 38 panels, dual hybrid inverters, 10kWh battery. DEWA bill: AED 6.50/month. Full roof waterproofing included.

22 kWHybrid + Battery
AED 6.50Monthly Bill
5 yrPayback
Solar panels on Dubai Hills villa
DUBAI HILLS

7 kW Family Villa

7 kW system on 4-bedroom villa. 12 panels, string inverter. DEWA bill reduced 65%. Payback in 4 years. EV charger added 6 months later.

7 kWString Inverter
65%Bill Reduction
4 yrPayback
Commercial solar on warehouse
JEBEL ALI

85 kW Warehouse

85 kW commercial system on logistics warehouse. 148 panels, dual string inverters. Annual savings AED 120,000. ROI in 3.5 years.

85 kWCommercial
AED 120KAnnual Savings
3.5 yrPayback
Solar panels on Arabian Ranches villa
ARABIAN RANCHES

12 kW + Battery

12 kW hybrid system with 15kWh battery. 20 panels. Pool pump + AC running on solar during peak hours. DEWA bill: AED 45/month.

12 kWHybrid + 15kWh
AED 45Monthly Bill
5.5 yrPayback
Villa renovation with solar integration
AL BARARI

Reno + Solar Combo

Full villa renovation + 15 kW solar added during roof works. Zero extra mobilisation cost. Single warranty covering all trades including solar.

15 kWReno + Solar
AED 0Extra Mobilisation
CombinedWarranty
Solar panel array on retail shop rooftop in Dubai
AL QUOZ · RETAIL

18 kW Retail Showroom

18 kW system on furniture showroom rooftop. 32 panels, 3-phase inverter. Daytime AC + lighting + workshop tools running on solar. Bill dropped 72%.

18 kW3-Phase
72%Bill Reduction
3.2 yrPayback
Solar installation on office building rooftop along Sheikh Zayed Road
SHEIKH ZAYED RD · OFFICE

120 kW Office Building

120 kW rooftop array on 6-floor office building. 210 panels, dual 3-phase inverters, remote monitoring for facility manager. 70% of office load offset.

120 kWOffice Roof
70%Load Offset
4 yrPayback
Large-scale solar installation on factory rooftop in Dubai Industrial City
DUBAI INDUSTRIAL CITY · FACTORY

240 kW Factory Array

240 kW system on manufacturing facility. 420 panels across two roof zones. Process equipment + climate control running daytime on solar. Annual savings AED 380,000.

240 kWFactory
AED 380KAnnual Savings
3.8 yrPayback
View Full Portfolio →

Like What You See? Get Yours Started.

Free ROI study shows your exact savings, system size, and payback period — before you commit a dirham.

WhatsApp Free ROI Study
Reply within 60 min · Free 48hr ROI study
800+Projects Done
DEWAShams Approved
25-YearPanel Warranty
60-90%Bill Savings
4-7 YrPayback
4.9★127 Reviews
WHY CHOOSE US FOR SOLAR

Why 800+ Dubai Property Owners Choose Us for Solar

Not marketing copy — operational advantages from a renovation company doing solar.

Renovation + Solar = One Team

Planning a villa renovation? Add solar at zero extra mobilisation cost. Roof work, electrical, waterproofing — all our in-house trades. One PM, one schedule, one warranty.

Waterproofing Specialists

Every solar mount penetrates your roof. We're waterproofing specialists — 10-year membrane under every mount point. Solar-only companies use silicone and hope for the best.

ROI-First System Design

We model your DEWA bill slab-by-slab, size the system to maximise savings at each tariff tier, and show you exact payback — not generic estimates. Free ROI study before you commit.

DEWA Shams Dubai Fast-Track

We handle the entire DEWA Shams Dubai process — application, single-line diagram, site inspection, meter installation, commissioning. 4-6 week track record.

Electrical Integration

Our in-house electricians upgrade your DB, install isolators, connect to grid — no subcontractors. EV charger integration available for future-proofing.

Hybrid + Battery Ready

Every system designed battery-ready. Add storage later without rework. Hybrid inverters standard on Premium+ packages.

Real-Time Monitoring + Alerts

App + web dashboard showing real-time generation, consumption, savings. WhatsApp alerts for any system issues. Quarterly performance reports.

25+10+3 Year Warranty

25-year panel performance warranty. 10-year inverter warranty. 3-year workmanship warranty. 2-year AMC included. Industry-leading coverage.

Summer 2026 Pricing Locks May 31.

Install before the DEWA tariff revision to lock in current ROI economics. Free site visit + ROI study still on us.

WhatsApp Free ROI Study
Reply within 60 min · Free 48hr ROI study
TRANSPARENT PRICING

Solar Packages — Transparent Fixed Pricing

Three packages. Fixed price. No hidden costs. DEWA-approved Tier 1 panels + inverters included.

Villa Starter (5 kW)

AED 15,000 – 22,000
3-4 BR Villa · Save 40-60%
  • 10-12 × Tier 1 mono PERC panels (550W+)
  • String inverter (Huawei/SolarEdge)
  • Galvanised aluminium racking
  • Full DEWA Shams Dubai approval
  • DEWA meter installation
  • DB upgrade + isolators
  • Waterproof membrane at all mounts
  • App monitoring system
  • 2-year AMC (quarterly cleaning)
  • 25+10+3 year warranty
5 kW Quote →

Villa Max (15+ kW)

AED 38,000 – 65,000+
Large Villa · Save 80-95%
  • Everything in Premium +
  • 28-32+ × Premium TOPCon panels
  • Hybrid inverter + battery option
  • Full roof waterproofing upgrade
  • Pool pump + EV charger integration
  • Smart home energy management
  • Battery storage add-on available
  • Priority O&M response
  • 2-year AMC (monthly cleaning)
15+ kW Quote →
Commercial · Industrial · Retail

Solar for Shops, Warehouses, Offices & Factories

Commercial systems deliver faster payback (3-5 years) due to higher daytime consumption. DEWA Shams approved with single-point accountability — design, permits, build, monitoring, 25-year warranty.

Shops & Showrooms
10-20 kW · retail / hospitality / clinic · 3-4 yr payback
AED 50K-90K
Offices & Mid-Commercial
30-80 kW · office buildings / coworking / Business Bay · 3-4 yr payback
AED 120K-280K
Warehouses & Logistics
50-200 kW · JAFZA / DIP / Al Quoz · 3-5 yr payback · large flat-roof advantage
AED 150K-450K
Factories & Heavy Industrial
100-300+ kW · process + AC load · 3-4 yr payback · free site survey
AED 300K-1M+
WhatsApp Commercial Quote
Prices include DEWA approval fees, installation, commissioning, 2-year AMC. Battery storage: add AED 8,000-25,000 depending on capacity. 0% EMI available up to 12 months. Bank finance up to 24 months.
THE PROBLEM

Why 40% of Dubai Solar Installations Underperform

Based on 800+ projects, here's what goes wrong with solar — and how we prevent it.

The system that looks cheapest per-watt often costs the most over 25 years. Here's what to watch for.

Oversized Systems That Never Pay Back

Many contractors sell the biggest system your roof fits, not the one that matches your DEWA bill. Result: excess kWh you can't use or sell profitably. We size to your actual consumption + DEWA slab tariff structure for maximum ROI.

Waterproofing Damage from Mounting

Roof penetrations for solar mounts cause leaks within 2-3 years. We're a full renovation company — waterproofing is our core trade. Every mounting point is sealed with 10-year waterproof membrane, not just silicone.

DEWA Approval Delays (3-6 Months)

Contractors who don't know DEWA's Shams Dubai process cause 3-6 month delays. We handle the full process — application, single-line diagram, commissioning, meter installation — in 4-6 weeks.

No Maintenance = 20% Output Loss

Dubai dust reduces panel output 15-20% without regular cleaning. Most contractors install and disappear. We include 2-year AMC with quarterly cleaning + monitoring in every package.

SIDE-BY-SIDE

Us vs Dubai's Solar-Only Companies

Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.

What You Get First Unicorn Solar Typical Dubai Provider
Waterproofing Expertise Core trade — 10-year membrane under every mount Silicone sealant, hope for the best
DEWA Shams Process 4-6 week approval track record 3-6 months typical
Roof Assessment Full structural + waterproofing survey before design Visual inspection only
System Sizing Sized to your DEWA bill slabs for max ROI Biggest system your roof fits
Post-Install Maintenance 2-year AMC included: quarterly cleaning + monitoring Optional AMC, usually extra cost
Electrical Integration In-house electricians, DB upgrade included Electrical work subcontracted
Warranty 25-year panels + 10-year inverter + 3-year workmanship 25-year panels, 5-year inverter, 1-year labour
Renovation Integration Solar + villa reno together = one mobilisation cost Solar only — separate contractor for anything else
Financing 0% EMI 12 months or bank finance up to 24 months Limited or no financing
Monitoring App + web dashboard + WhatsApp alerts Basic inverter app
OUR PROCESS

From Free ROI Study to First Kilowatt in 4-6 Weeks

A proven 6-step process. We handle everything — you just watch your DEWA bill shrink.

1

Free Site Visit + ROI Study

Day 1-2 · FREE

Site visit, roof survey (structural, waterproofing, shading), DEWA bill analysis, consumption pattern review. Detailed ROI model showing exact savings per month and payback period. No obligation.

2

System Design + Proposal

Day 3-5

Custom system design — panel layout, inverter sizing, wiring diagram, single-line diagram. Proposal with exact pricing, expected generation, monthly savings, and payback timeline.

3

DEWA Shams Dubai Application

Day 5-14

Full DEWA application: Shams Dubai registration, single-line diagram submission, site inspection coordination. We handle all paperwork — you just sign.

4

Installation

Day 14-18 (2-3 days on-site)

Waterproof membrane at all mount points, racking installation, panel mounting, inverter + DB connection, wiring, isolators. In-house electricians — no subcontractors.

5

DEWA Inspection + Commissioning

Day 18-30

DEWA site inspection, meter installation, grid connection, system commissioning. Full testing of generation, safety systems, monitoring app setup.

6

Monitoring + AMC Starts

Day 30+ · 2-Year AMC

System live. App monitoring active. First quarterly cleaning scheduled. WhatsApp group for alerts. Quarterly performance reports. 25+10+3 year warranty documentation.

SOLAR EXPERTISE

Complete Solar Capabilities In-House

Every trade needed for solar — done by our team. No subcontractors.

DEWA Shams Dubai

Application, inspection, meter, commissioning

Roof Waterproofing

10-year membrane at every mount point

Structural Assessment

Roof load capacity analysis before design

Electrical (DB + Grid)

DB upgrade, isolators, grid connection

System Design

Custom layout, ROI modelling, slab optimisation

Panel Installation

Tier 1 mono PERC / TOPCon panels

Inverter + Storage

String, hybrid, micro — battery ready

Monitoring + IoT

App, web dashboard, WhatsApp alerts

EV Charger Integration

Solar-optimised EV charging circuits

Maintenance (AMC)

Quarterly cleaning, inspection, reporting

Municipality Permits

DM/community NOC if structural changes needed

Full Villa Renovation

Add solar to any renovation project

98% first-submission approval rate · 800+ projects · Zero rejections beyond second submission in last 5 years
CLIENT REVIEWS

What Dubai Property Owners Say About Our Solar

4.9/5 rating from 127 Google reviews. Real savings from real installations.

★★★★★

"DEWA bill was AED 3,200/month. After First Unicorn installed 10kW, it's been AED 180-320 depending on season. The ROI study they showed me before installation was accurate to within 5%. Payback on track for 4.5 years."

RA
Rashid A. Palm Jumeirah · 10 kW System
★★★★★

"What sold me was the waterproofing. Previous solar company left my roof leaking after 2 years. First Unicorn removed the old system, re-waterproofed properly, and reinstalled with their own panels. Zero leaks since."

JM
James M. Emirates Hills · 15 kW System
★★★★★

"Added solar during our villa renovation — saved the entire mobilisation cost vs doing it separately. One team, one PM. DEWA bill is now AED 6.50. My neighbours are asking for the same company."

FK
Fatima K. Dubai Hills · 12 kW + Villa Reno

Be the Next AED 6.50 DEWA Bill.

Real customers, real savings. The next install slot can be yours — DEWA Shams paperwork handled in-house.

WhatsApp Free ROI Study
Reply within 60 min · Free 48hr ROI study
REAL-TIME PROOF

Recent Solar Results

Transparent track record. Real numbers from real installations. No marketing fluff.

800+
Solar + renovation projects delivered
AED 6.50
Lowest monthly DEWA bill achieved
4-7 yr
Average payback period
0
Roof leaks from our solar installations

Recent Wins

  • Palm Jumeirah · 10 kW villa rooftop ✓ AED 180/month bill
  • Emirates Hills · 22 kW mansion + battery ✓ AED 6.50/month
  • Dubai Hills · 7 kW family villa ✓ 4-year payback
  • Arabian Ranches · 12 kW hybrid + pool ✓ AED 45/month
  • Jebel Ali · 85 kW warehouse ✓ AED 120K annual savings
  • Al Barari · 15 kW + full villa reno ✓ Combined delivery
  • JVC · 5 kW townhouse system ✓ AED 95/month bill
CERTIFICATIONS & MEMBERSHIPS
DM ApprovedDubai Municipality registered consultant
DDA RegisteredDubai Development Authority approved
Trakhees ListedPalm Jumeirah / freehold zone approved
800+ ProjectsAcross UAE since inception
4.9★ Google127 verified reviews
FREQUENTLY ASKED

Everything Dubai Property Owners Ask About Solar

The questions DEWA doesn't answer clearly — we do. WhatsApp us — answered within 60 minutes.

How much do solar panels cost for a villa in Dubai? +

Villa solar systems typically cost AED 15,000-45,000 depending on size. 5 kW (3-4 BR villa): AED 15,000-22,000. 10 kW (5-6 BR): AED 25,000-38,000. 15+ kW (large villa): AED 38,000-65,000+. Price includes Tier 1 panels, inverter, installation, DEWA approval, and 2-year AMC.

How much will I save on my DEWA bill? +

Most villa owners save 60-90% on electricity bills. A 10 kW system on a villa with AED 2,500/month DEWA bill typically reduces it to AED 250-400/month. Exact savings depend on your consumption pattern, DEWA slab tariff, and system size. Our free ROI study shows exact projections.

What is DEWA Shams Dubai and how does it work? +

Shams Dubai is DEWA's program allowing you to connect solar panels to the grid. Excess electricity you generate goes back to DEWA — you get credit on your next bill (net metering). No battery needed for daytime savings. We handle the entire Shams Dubai application process.

How long does solar installation take? +

From signing to system live: 4-6 weeks total. Installation itself takes 2-3 days on-site. The rest is DEWA approval process, which we manage entirely. Much faster than the 3-6 months typical with solar-only companies.

What's the payback period? +

Typical villa payback: 4-7 years depending on system size and consumption. After payback, you enjoy 18-21 years of near-free electricity (panels last 25-30 years). Commercial systems often pay back in 3-5 years due to higher DEWA tariffs.

Do I need batteries? +

Not for most villa owners. DEWA net metering means you use the grid as your 'battery' — excess goes to DEWA, you pull back at night. Batteries (AED 8,000-25,000) make sense for: backup during outages, off-grid areas, or maximising self-consumption. We design every system battery-ready so you can add later.

Will solar panels damage my roof? +

Not with proper installation. The #1 cause of solar-related roof damage is poor waterproofing at mounting points. We install a 10-year waterproof membrane under every mount — we're a renovation company, waterproofing is our core trade. Solar-only companies use silicone sealant.

Can I add solar during a villa renovation? +

Yes — and you should. Adding solar during renovation saves the entire mobilisation cost (AED 3,000-5,000). Roof waterproofing done once, electrical work integrated, one PM managing everything. This is our unique advantage — we're the only company in Dubai that does both.

What panels and inverters do you use? +

Panels: Tier 1 manufacturers — Longi, JA Solar, Canadian Solar, Jinko. Mono PERC or TOPCon technology for UAE heat performance. Inverters: Huawei, SolarEdge, Fronius (string); Huawei, GoodWe (hybrid). All equipment comes with manufacturer warranty.

Do you offer financing? +

Yes — 0% EMI up to 12 months (in-house). Bank financing up to 24 months with competitive rates. PPA (Power Purchase Agreement) available for commercial — zero upfront cost, pay only for electricity generated.

What maintenance is needed? +

Dubai dust reduces output 15-20% without cleaning. Our 2-year AMC (included) covers quarterly professional cleaning, system inspection, monitoring review, performance reporting. After 2 years, optional AMC at AED 1,500-3,000/year depending on system size.

Can I combine solar with EV charging? +

Absolutely. We pre-wire for EV chargers in Premium+ packages and can install a solar-optimised EV charging circuit. Charge your car from sunshine — typical EV uses 8-12 kWh/day, well within a 10 kW system's capacity.

Get a Free Solar ROI Study. See Exact Savings Before You Commit.

Free site visit + DEWA bill analysis + exact payback calculation. No obligation. 800+ solar projects delivered. 25-year warranty.

Sun-Thu 9am-6pm GST · Free site visit anywhere in Dubai · 60-min response

Cut Your DEWA Bill With Solar Panels in Dubai.: indicative range AED 535K – AED 1.8M for typical 4–5 bedroom villas, 14-22 weeks. Approvals via Dubai Municipality permit. End-to-end by Unicorn Luxury Renovations.

Key facts
Typical cost
AED 535K – AED 1.8M
Timeline
14-22 weeks
Approvals
Dubai Municipality permit

Updated