Apartment Renovation in Dubai
Apartment renovation in Dubai typically costs AED 45,000 for a studio quick-turn, AED 75,000–160,000 for a 1–2 bedroom owner-occupier scope, and AED 150,000–350,000 for a 3-bedroom premium renovation. The Dubai apartment market is tower-specific — each building has its own Owners' Association NOC process, working-hours window and access rules. First Unicorn Interiors has renovated apartments across all major Dubai tower clusters — Marina, JBR, JLT, Downtown, Business Bay, DIFC, City Walk, Palm Jumeirah, Dubai Creek Harbour and the DAMAC Hills tower cluster — with a 3-year workmanship warranty on every job.
- Studio apartment renovation from AED 45,000
- 1–2 bedroom owner-occupier full renovation: AED 75,000–160,000
- 3-bedroom premium renovation: AED 150,000–350,000
- Building NOC handled in-house for all major Dubai towers
- Typical timeline 4–8 weeks on-site plus 1–3 weeks of approvals
- 3-year workmanship warranty, fixed-price BOQ, in-house team
Updated 2026-05-14 · First Unicorn Interiors editorial team · Dubai, UAE
Dubai Apartment Renovation — Tower-Specific by Design
Apartment renovation in Dubai is fundamentally tower-driven. Unlike villa renovations, where the master-developer NOC process is largely consistent within each community, every Dubai apartment building has its own Owners' Association with its own renovation policy — allowed working hours, lift-use rules, materials-delivery routes, hammer-and-drill noise windows, weekend restrictions, contractor approval lists, and security-deposit amounts. The Address Downtown plays by different rules than Cayan Tower in Marina, which plays by different rules than 8 Boulevard Walk in Downtown. A contractor who knows the rules for your specific building will save you weeks of friction and avoid common compliance fines.
The Dubai apartment market segments into roughly six tower clusters that we work in heavily. Dubai Marina (Cayan, Princess, Marina Promenade, Trident, Marina Crown, 23 Marina, Damac Heights, Marina Gate, etc.) — mostly 2005–2015 stock now requiring full renovation. JBR (six clusters: Amwaj, Bahar, Murjan, Sadaf, Shams, Rimal) — 2007 stock thoroughly dated, salt-air corrosion accelerating. JLT (80+ towers across 26 clusters) — very mixed quality, 2007–2018 stock. Downtown Dubai (Address Boulevard, Burj Vista, Burj Royale, Boulevard Point, The Lofts, South Ridge, Standpoint, Burj Crown) — the premium end of mid-market apartment renovation. Business Bay (DAMAC Towers, Executive Towers, Bay Square, Reva Heights, Aykon City, Vela) — the workhorse mid-market. DIFC, City Walk, Dubai Creek Harbour, Palm Jumeirah, Bluewaters, Madinat Jumeirah Living and DAMAC Hills tower cluster — specialised renovation markets with their own quirks.
The typical scope owners commission for a Dubai apartment renovation is: full kitchen replacement (the original developer fit-out is almost always the weakest link), bathroom rebuild (waterproofing failure is the #1 post-handover complaint in Dubai apartments), flooring upgrade (porcelain or large-format tile or engineered wood depending on style), repaint and bedroom joinery (built-in wardrobes). Owners renovating for rental yield typically also add light smart-home (one-touch lighting and AC scenes) and upgrade window treatments. Owners renovating for own-occupancy go deeper — custom joinery, full smart-home, premium kitchen brands, marble or book-matched stone finishing.
Apartment Renovation Dubai — Key Terms
- Owners' Association NOC
- No-Objection Certificate issued by your specific building's OA before any renovation can start. Distinct from the master-developer NOC. Required for every apartment renovation in every Dubai tower. Typically 1–3 weeks turnaround.
- Master-developer NOC
- Issued by the development's master developer (Emaar, Nakheel, DAMAC, Meraas, etc.) on top of the OA NOC. Required for towers within a master-planned development like Downtown, Marina, Dubai Creek Harbour, Bluewaters.
- Building working hours
- Each Dubai tower defines its own permitted hours for renovation work, typically 9 am–6 pm Saturday to Thursday. Friday morning and overnight work are normally banned. Lift use for materials delivery may be restricted to off-peak windows.
- Security deposit
- Refundable amount held by the building OA against any common-area damage during renovation. Typically AED 2,000–5,000. Returned on satisfactory site close-out and corridor inspection.
- Lift protection
- Hardboard and plastic-sheet protection of lift cabin walls, ceiling, doors and corridor floor on the working level. Required by every Dubai building before renovation can start.
- Wet-area waterproofing
- Triple-membrane waterproofing system applied in every bathroom and kitchen before tiling. Primer + cementitious slurry + polyurethane top coat, with 24-hour flood test verification.
- Fixed-price BOQ
- Bill of Quantities priced as a single fixed total — no allowances, no provisional sums. The signed number is the paid number, scope changes priced separately in writing.
How a Dubai Apartment Renovation Runs — Step by Step
- WhatsApp enquiry and site-visit booking (Day 0). Send photos to +971 58 565 8002 with your tower name and bedroom count. We confirm site-visit availability within 4 working hours.
- Free site visit (Days 1–3). Senior project lead spends 60–90 minutes on site — measuring, photographing, listening to priorities. We check the building's specific NOC requirements before we leave.
- Fixed-price BOQ and 3D renders (Days 3–5). Line-item BOQ plus 3D walkthrough of kitchen, bathrooms and joinery. Two free revision rounds. You see exactly what you're paying for.
- Contract signing and milestone agreement (Day 5). Standard milestones 30% deposit, 30% MEP first-fix, 30% finishing, 10% post-snagging. No cash. No upfront full payment.
- Building OA NOC and master-developer NOC (Days 5–20). Filed in-house. Lift-protection plan, contractor licences, insurance, security deposit, working-hours sign-off. Typical clearance 1–3 weeks depending on building.
- Site mobilisation and protection (Day 1 on-site). Lift cabin, corridor floor and entrance door fully protected. Dust extraction, waste plan and noise-control in place before demolition.
- Demolition and MEP first-fix (Weeks 1–2). Existing fittings stripped, plumbing and electrical rough-ins. Waste removed daily to building-approved disposal point. Daily WhatsApp photo updates.
- Wet-area waterproofing, tiling, kitchen install (Weeks 2–5). Triple-membrane bathroom and kitchen waterproofing with flood test, floor and wall tiling, kitchen carcass and worktop install.
- Joinery, finishing, snagging, handover (Weeks 5–7). Wardrobes, ceilings, paint, smart-home commissioning, deep clean. Internal QC snag, owner snag, 7-day rectification, full handover pack and 3-year warranty.
Dubai Apartment Renovation — What It Actually Costs
The most useful answer to "how much does apartment renovation in Dubai cost" is to break it by apartment type and scope rather than throw a single "from AED X" number. Here are real ranges from First Unicorn BOQs over the last 12 months across the towers we work in regularly.
Studio (350–550 sqft) — common in Marina, JBR, Business Bay, JLT, DAMAC Hills towers, Dubai Creek Harbour. Full renovation (kitchen + bathroom + paint + flooring + light joinery) typically AED 45,000–75,000. The cost is dominated by the kitchen (AED 35,000–45,000 even for a small kitchen) and the bathroom (AED 18,000–25,000) because cabinetry, worktop and sanitaryware are roughly fixed regardless of how small the room is.
1-bedroom (700–950 sqft) — very common across all clusters. Full renovation typically AED 75,000–120,000 for a standard owner-occupier scope, AED 120,000–170,000 for premium finish with custom joinery and smart-home, AED 170,000–240,000 for luxury with marble and Italian brands.
2-bedroom (1,100–1,500 sqft) — the most common Dubai apartment renovation size in our pipeline. Full renovation typically AED 110,000–170,000 standard, AED 170,000–240,000 premium, AED 240,000–360,000 luxury.
3-bedroom (1,500–2,200 sqft) — less common but typical in Marina premium towers (Le Reve, 23 Marina, Marina Pinnacle premium floors), Downtown (The Address, Burj Vista, Burj Crown), Palm Jumeirah (Shoreline Apartments, Marina Residences, Tiara), JBR upper floors. Full renovation typically AED 160,000–230,000 standard, AED 230,000–340,000 premium, AED 340,000–520,000 luxury.
Penthouse and duplex (2,500–5,500 sqft) — specialised projects in premium towers. Full renovation typically AED 350,000–700,000 at premium tier, AED 700,000–1,200,000+ at luxury tier with structural reconfiguration.
What pushes the price up: book-matched marble or Italian Calacatta (adds AED 25,000–75,000 per apartment), full smart-home with lighting/AC/blinds/security/multi-room audio (adds AED 25,000–60,000), Italian kitchen brands like Pedini, Boffi, Aster (doubles or triples the kitchen cost), bespoke fully-rebated joinery (adds AED 1,800–3,500 per linear metre), full-height glazing replacement with low-E coating (AED 8,000–15,000 per linear metre).
What pulls the price down: keeping existing flooring where sound (saves AED 20,000–40,000), refacing kitchen cabinets instead of full replacement (saves AED 20,000–35,000), regrouting existing wet-area tile instead of replacing (saves AED 8,000–15,000 per bathroom), staying within existing electrical and plumbing layout (no DM permit, faster timeline), Korean over Italian appliance brands.
Apartment Renovation Dubai — Price by Apartment Type and Scope
Real 2026 First Unicorn BOQ ranges across Dubai apartment renovation scopes. Prices include NOC handling, lift protection, waste removal, deep clean and 3-year warranty.
| Apartment type | Standard finish | Premium finish | Luxury finish | Timeline |
|---|---|---|---|---|
| Studio (350–550 sqft) | AED 45K–75K | AED 75K–110K | AED 110K–160K | 3–5 weeks |
| 1-bedroom (700–950 sqft) | AED 75K–120K | AED 120K–170K | AED 170K–240K | 4–6 weeks |
| 2-bedroom (1,100–1,500 sqft) | AED 110K–170K | AED 170K–240K | AED 240K–360K | 5–8 weeks |
| 3-bedroom (1,500–2,200 sqft) | AED 160K–230K | AED 230K–340K | AED 340K–520K | 7–10 weeks |
| Penthouse / duplex (2,500–5,500 sqft) | AED 280K–420K | AED 420K–700K | AED 700K–1.2M+ | 10–16 weeks |
What We've Learned from Renovating in 60+ Dubai Towers
Across 800+ Dubai projects we've worked in 60+ named towers. Here are the things that vary tower-by-tower and that an experienced apartment renovation contractor in Dubai should know without having to look up.
Working hours rules. Most Marina towers (Cayan, Damac Heights, Princess, Marina Crown) permit 9 am–6 pm Saturday–Thursday. JBR clusters generally permit 9 am–5 pm with no work after 4 pm on Thursdays. Downtown premium towers (The Address Downtown, Burj Vista, Burj Royale) restrict heavy-noise work to 10 am–4 pm only. DIFC towers (DIFC Index Tower residential floors, Park Tower) operate on commercial timing 9 am–5 pm with even tighter noise rules. We schedule realistically based on these from Day 0.
Lift use rules. Most Dubai buildings allow materials lift use for renovation, but only off-peak (typically 10 am–4 pm) and only one lift at a time. Some buildings (Cayan, Princess Tower, 23 Marina) require lift booking in advance through the OA. Some (The Address Downtown) require a dedicated freight elevator at an additional access fee. Our project managers know the protocols by building.
Security deposit ranges. AED 2,000–5,000 is standard for most buildings. Premium Downtown and Palm Jumeirah towers can demand AED 10,000–20,000 deposits. DIFC residential buildings often require additional commercial-grade insurance certificates. The deposit is included as a pass-through line in our BOQ — not a hidden cost.
Common defects we see at site visits. JBR apartments: salt-air corrosion of window frames, balcony waterproofing failures, dated kitchen cabinetry. Marina apartments: gypsum-ceiling water damage from poor balcony detailing on older towers, original developer kitchen carcass swelling at the toe-kick area. Downtown apartments: rarely structural issues, mostly aesthetic upgrading to current style. Business Bay apartments: original-developer plumbing failures around 8–10 years post-handover.
Compliance items that catch contractors out. Some buildings require a Dubai Municipality contractor classification card check by name at security; if your contractor's site supervisor isn't on the cleared list, they don't enter. Some buildings require photocopies of every workman's Emirates ID. Some require a daily worker log. Some run random fire-safety audits during active renovations. We handle all of this in the background — the owner doesn't see it.
What we recommend on every Dubai apartment renovation. Always rebuild wet-area waterproofing as triple-membrane with flood test. Always replace original developer plumbing isolation valves — they're a known failure point. Always upgrade the AC controller to a smart thermostat (Honeywell T6 or Daikin DCS) — the developer-issued wall controllers are basic and AC bills drop noticeably after the upgrade. Always reseal balcony doors and replace seals if 5+ years old — the dust-and-noise ingress reduction is significant.
One thing we never recommend. Cheaper "value engineering" on waterproofing or electrical. These are the two trades where Dubai apartment problems compound — a leaking shower at year 4 means damage to the apartment below and a serious AED 25,000+ remediation. We don't cut on either of these, ever, regardless of pricing pressure.
Frequently Asked Questions
How much does apartment renovation in Dubai cost?
How long does a Dubai apartment renovation take?
Do I need a NOC to renovate my apartment in Dubai?
Which Dubai towers do you work in?
Can I live in the apartment during renovation?
What is your warranty?
Is the BOQ fixed-price?
Where this information comes from
This page reflects current Dubai Municipality, RERA, Dubai Land Department and master-developer (Emaar, Nakheel, DAMAC, Meraas) processes as of 2026-05-14. AED prices are based on First Unicorn Interiors' own BOQs across 800+ Dubai projects (2010–2026). Sources we relied on: