Updated 2026-06-28 — Latest 2026 prices and availability
Plan your Dubai kitchen renovation with realistic 2026 costs for cabinetry, worktops, MEP changes, appliances, lighting and installation.
FREE COST CHECK
Share your kitchen size, community and finish level. We estimate cabinets, stone, MEP and timeline, then confirm it with a free site visit.
All prices include labour, materials, and project management. No hidden fees. Get a fixed-price quote for your specific project.
Cabinet refacing, new countertops, splashback, painting. Keep existing layout. 3-4 weeks.
New custom joinery, stone countertops, appliance integration, flooring. 5-7 weeks.
Complete redesign with island, premium brands, smart storage, luxury finishes. 6-8 weeks.
Every project is different. Here are the main factors that determine your final cost.
MDF with spray finish: AED 800-1,200/m. Solid wood: AED 1,500-2,500/m. Imported European: AED 3,000+/m.
Engineered quartz: AED 400-800/sqft. Natural marble: AED 600-1,200/sqft. Dekton/Neolith: AED 800-1,500/sqft.
Mid-range (Bosch/Siemens): AED 15K-25K set. Premium (Miele/Gaggenau): AED 40K-80K set. Supplied by us at trade pricing.
Moving plumbing or electrical adds AED 5K-15K. Moving gas connection adds AED 3K-8K. Island installation adds AED 10K-20K.
Porcelain tiles: AED 80-150/sqm installed. Natural stone: AED 200-400/sqm. Wood-look tiles: AED 100-200/sqm.
A kitchen renovation without layout changes: 3-4 weeks. With layout changes and new plumbing: 5-7 weeks. Full redesign with island: 6-8 weeks.
Planning a kitchen renovation? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

Four tiers to match every budget. All include design, labour, materials, and a 3-year warranty.
| Tier | Cost Range | What You Get |
|---|---|---|
| Budget Kitchen | AED 35,000 -- 55,000 | Laminate cabinets, quartz countertops, standard fixtures, basic tiling |
| Mid-Range | AED 55,000 -- 85,000 | Solid wood cabinets, quartz/granite countertops, Grohe fixtures, porcelain tiling |
| Premium | AED 85,000 -- 150,000 | Custom cabinets, marble countertops, integrated appliances, LED lighting |
| Luxury | AED 150,000 -- 300,000+ | Italian design, natural stone, Gaggenau/Miele appliances, smart features, island |
Prices based on a typical 12-15 sqm kitchen. Larger kitchens or layout changes will adjust the cost. Get your exact quote
Understand where every dirham goes. Cabinetry is the biggest expense, typically 40-50% of total cost.
| Component | Cost Range | % of Total |
|---|---|---|
| Cabinetry | AED 15,000 -- 80,000 | 40-50% |
| Countertops | AED 5,000 -- 40,000 | 10-15% |
| Appliances | AED 8,000 -- 60,000 | 15-20% |
| Plumbing & Fixtures | AED 3,000 -- 15,000 | 5-8% |
| Electrical | AED 2,000 -- 8,000 | 3-5% |
| Tiling & Backsplash | AED 3,000 -- 12,000 | 5-8% |
| Flooring | AED 4,000 -- 15,000 | 5-8% |
See it before you build it
Free 3D design concept for your kitchen renovation — based on 800+ completed Dubai projects.
A typical kitchen renovation takes 4-6 weeks from demolition to handover. Here is the week-by-week breakdown.
Strip out old kitchen, remove tiles and flooring. Prepare plumbing and electrical rough-ins.
Complete plumbing and electrical. Install floor and wall tiles, backsplash.
Install cabinets, fit countertops (templated and fabricated during weeks 1-2). Mount sink and fixtures.
Install all appliances, LED lighting, handles, soft-close mechanisms. Paint touch-ups.
Quality inspection, snagging fixes, deep clean. Kitchen handed over ready to use.

Send us your floor plan or photos on WhatsApp. We will reply with a detailed fixed-price quote within 24 hours. Free site visit included.
Kitchen renovation in Dubai costs AED 35,000 to AED 180,000 in 2026, depending on size, materials, and scope. Basic modular kitchens start at AED 35K for 10 sqm, while luxury custom designs with appliances reach AED 180K for 30+ sqm. First Unicorn Interiors provides in-house design, permits, and 3-year warranty on 800+ projects.
Free UAE renovation tools
What will yours cost?
Get a personalised estimate in 60 seconds with our renovation calculator.
Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.
Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.
External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.
We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.
Kitchen renovation cost in Dubai in 2026 typically ranges from AED 45,000 for a standard 10-square-metre kitchen to AED 120,000+ for a premium fit-out with imported cabinetry and smart appliances. This price includes demolition, plumbing, electrical rewiring, tiling, cabinetry, countertops, and installation – but excludes structural changes, which require Dubai Municipality approval. For a mid-range renovation with quartz worktops and semi-handless cabinets, expect AED 55,000–75,000. Timelines vary: a cosmetic refresh (painting, new doors, worktop) takes 2–3 weeks; a full gut renovation takes 4–8 weeks, depending on permit wait times (typically 5–10 working days from Dubai Municipality). If you live in a villa community like The Springs, Emirates Hills, or Arabian Ranches, you may also need NOC from the master developer (e.g., Emaar, Nakheel) – add 1–2 weeks. DEWA connection upgrades for induction hobs or extra sockets cost AED 500–1,500. Always budget 10–15% contingency for hidden issues like outdated plumbing. First Unicorn Interiors offers a 3-year warranty on all workmanship and materials.
A standard kitchen renovation package in Dubai (AED 45,000–65,000) typically includes: demolition of existing cabinets and tiles, re-routing of plumbing and electrical points (up to 5 new sockets), installation of medium-density fibreboard (MDF) or plywood cabinetry with soft-close hinges, a quartz or granite worktop (up to 3 metres), ceramic wall tiles up to 600x600mm, a stainless steel sink and single-lever mixer tap, and painting of the ceiling. Flooring is usually not included – expect AED 2,500–4,000 extra for 10 sqm of porcelain tiles. Labour and disposal of debris are included. The timeline is 4–6 weeks from permit approval. First Unicorn Interiors provides a detailed BOQ (bill of quantities) before starting, so there are no surprises.
Yes, a permit from Dubai Municipality is required for any kitchen renovation that involves structural changes, plumbing, or electrical work. Cosmetic changes (painting, replacing doors) may not need a permit, but it's safer to apply. The permit cost is approximately AED 500–1,000, and processing takes 5–10 working days. You'll need a registered engineering consultant (like First Unicorn Interiors) to submit the drawings and NOC from the building owner or master developer. For apartments in freehold buildings, also check with the owners' association (OA) – some charge a refundable deposit of AED 2,000–5,000. Failure to obtain a permit can result in fines up to AED 10,000 and re-inspection costs.
A luxury kitchen renovation in Dubai (AED 80,000–150,000+) includes premium materials like solid wood or lacquered cabinetry, marble or Dekton worktops, under-cabinet lighting, integrated Miele or Gaggenau appliances, and custom joinery. Expect a timeline of 8–12 weeks. For a 15–20 sqm kitchen, the breakdown is: cabinetry AED 35,000–60,000, worktop AED 12,000–25,000, appliances AED 15,000–40,000, labour and permits AED 10,000–15,000. Additional costs: glass splashback (AED 3,000–6,000), smart storage solutions (AED 5,000–10,000), and ventilation upgrade (AED 2,000–5,000). First Unicorn Interiors offers a 3-year warranty and can source materials from Italy, Germany, or local suppliers. Always ask for a sample board and 3D visualisation before approval.
A glimpse of current First Unicorn projects — interiors, kitchens, bathrooms, pools and glasswork.
All projects →Kitchen renovation cost in Dubai starts around AED 45,000 for a quality mid-range refit and runs to AED 120,000+ for a premium open-plan kitchen with imported Italian or German cabinetry, stone worktops and integrated appliances. A realistic band for most Dubai villas and larger apartments is AED 45,000–90,000 fully fitted. The price is driven by three things: cabinetry (the biggest single line — local vs European carcasses and hardware), worktops (quartz vs natural stone vs porcelain), and how much you move plumbing and electrics. A like-for-like refit that keeps the sink, hob and drainage in place needs only DEWA-compliant first-fix and no structural permit; the moment you relocate services or remove a wall, you add MEP works and, for walls, a Dubai Municipality modification approval. First Unicorn Interiors delivers turnkey kitchens with a 3-year warranty and a fixed BOQ, typically in 3–6 weeks. Share your kitchen dimensions on WhatsApp +971 58 565 8002 for a same-week fixed quote.
On a typical AED 60,000 Dubai kitchen, expect roughly 45–55% cabinetry and joinery, 12–18% worktops and splashbacks, 10–15% MEP (plumbing, electrics, extraction), 8–12% appliances if included, and the balance on flooring, tiling, paint and project management. Cabinetry is where budgets swing most: local MDF units keep you at the lower end, while European soft-close carcasses, tall units and bespoke islands push you toward AED 90,000+. Knowing this split lets you invest where it shows — worktops and cabinet fronts — and save on hidden carcasses without hurting durability.
For a straight refit — new cabinets, worktops, appliances and finishes with services staying in place — no Dubai Municipality permit is required, though any electrical or plumbing work should be done by a DEWA-compliant contractor. You need approvals when you remove or move a wall (DM building-modification permit), relocate the gas or main drainage, or alter the building's external appearance. In apartments, the building management/owners' association will also require a fit-out NOC and set working hours. A licensed contractor handles these so your project is compliant and insurable — an unpermitted wall removal can block your next sale.
Keep the plumbing and electrical layout where it is — relocating the sink and hob is the most expensive change per square metre. Choose a durable local carcass with premium fronts and quartz worktops rather than full imported units. Standardise cabinet sizes to reduce bespoke joinery. Reuse sound appliances. And renovate the kitchen alongside adjacent flooring in one mobilisation to avoid paying twice for setup and protection. These moves routinely bring an AED 85,000 specification down to AED 58,000–65,000 with no visible drop in quality — the approach First Unicorn Interiors builds into every kitchen BOQ.
Kitchen remodel cost in Dubai typically ranges from AED 45,000 for a standard 10m² kitchen to AED 120,000+ for a premium 20m²+ kitchen with custom joinery and imported appliances. As a full-service renovation contractor in Dubai, First Unicorn Interiors has completed over 200 kitchen renovations across communities like Dubai Marina, Palm Jumeirah, and Arabian Ranches. The cost breakdown includes: demolition and disposal (AED 3,000–5,000), plumbing and electrical re-routing (AED 8,000–15,000), cabinetry (AED 15,000–40,000), countertops (AED 5,000–15,000 for quartz or granite), appliances (AED 10,000–30,000), flooring and backsplash (AED 5,000–10,000), and painting/finishing (AED 3,000–6,000). Timelines range from 4 to 8 weeks depending on scope and approvals. Dubai Municipality approval is required for structural changes (e.g., moving walls or gas lines), which adds 2–4 weeks and AED 2,000–5,000 in fees. DEWA connection upgrades may cost AED 1,500–3,000. For villa kitchens in communities like The Springs or Emirates Hills, costs are higher due to larger layouts and premium finishes. We offer a 3-year warranty on all workmanship and materials. Contact us on WhatsApp +971 58 565 8002 for a free site survey and detailed quote.
The average cost per square foot for a kitchen remodel in Dubai ranges from AED 600 to AED 1,200 for mid-range finishes, and AED 1,200 to AED 2,500+ for high-end luxury. For a 10m² (108 sq ft) kitchen, that translates to AED 65,000–130,000 for mid-range, and AED 130,000–270,000 for luxury. Costs include cabinetry (40% of budget), countertops (15%), appliances (20%), labor (15%), and permits/design (10%). First Unicorn Interiors provides itemized quotes with no hidden fees. For example, a recent 12m² kitchen in JLT cost AED 78,000 including quartz countertops, soft-close cabinets, and German appliances. The per-sq-ft rate varies by material choice: laminate cabinets are cheaper than solid wood; quartz is more affordable than marble. For an accurate estimate, we recommend a site visit to measure and discuss your preferences.
For a kitchen renovation in Dubai, permits are required from Dubai Municipality and sometimes DEWA. If you are altering structural walls, gas lines, or plumbing, you need a building permit from Dubai Municipality (AED 2,000–5,000, 2–4 weeks processing). For minor cosmetic changes (painting, cabinet replacement, countertop swap), no permit is needed, but you must comply with community rules (e.g., in Palm Jumeirah or Emirates Living, Nakheel or Emaar may require a no-objection certificate). DEWA approval is needed if you upgrade electrical capacity (AED 1,500–3,000). For gas cooker installation, a gas safety certificate from an approved contractor is mandatory. First Unicorn Interiors handles all permit applications as part of our service, ensuring compliance with Dubai Municipality regulations and community guidelines. We have a 100% approval rate for kitchen renovation permits.
A typical kitchen remodel in Dubai takes 4 to 8 weeks from start to finish. The timeline depends on scope: simple cosmetic updates (new cabinets, countertops, appliances) take 4–5 weeks; full gut renovations with structural changes (moving walls, re-piping) take 6–8 weeks. The process includes: design and approval (1–2 weeks), demolition (3–5 days), rough-in plumbing/electrical (1 week), cabinetry installation (1–2 weeks), countertop templating and installation (1 week), appliance installation and finishing (1 week). Delays can occur due to permit approvals (2–4 weeks if structural) or material lead times (custom cabinets from Italy may take 6–8 weeks). First Unicorn Interiors provides a detailed project schedule upfront and keeps you updated weekly. We recently completed a kitchen in The Greens in just 5 weeks, including new flooring and backsplash.