Dubai Municipality Licensed 800+ Projects In-House Team 3-Year Warranty
First Unicorn Interiors — 2026 Edition

Dubai Villa Renovation Cost Guide

Real pricing from 800+ completed projects across Dubai's premium communities. No fluff, no "contact us for a quote" — actual AED ranges for every room, every community, every quality level.

800+
Projects
15+
Years in Dubai
2,400+
Guide Downloads
Book Free Site Visit
Room-by-Room Pricing

1. Kitchen Renovation

Kitchen renovations are consistently the highest-ROI room upgrade in Dubai. Costs vary significantly based on layout complexity, material grade, and appliance selection.

ScopeEssentialPremiumLuxury
Galley / small kitchenAED 45,000–65,000AED 65,000–120,000AED 120,000–180,000
L-shape / standardAED 60,000–85,000AED 85,000–150,000AED 150,000–220,000
U-shape / islandAED 80,000–120,000AED 120,000–200,000AED 200,000–350,000
Open-plan + island + butler's pantryAED 100,000–160,000AED 160,000–280,000AED 280,000–500,000+
What's included: Demolition, cabinetry, countertops, splashback, plumbing relocation, electrical, flooring, painting, lighting fixtures. Appliances are typically quoted separately.

Material Cost Drivers

MaterialCost / sqmNotes
Laminate countertopAED 200–400Budget option, 5-year lifespan
Engineered stone (Caesarstone)AED 600–1,200Most popular in Dubai, stain-resistant
Natural marble (Calacatta)AED 1,500–3,500Statement piece, requires sealing
Porcelain slabAED 800–1,800Looks like marble, zero maintenance

2. Bathroom Renovation

Bathrooms deliver the most dramatic transformations. A dated 2008 bathroom can become a spa-like retreat in 4–6 weeks.

ScopeEssentialPremiumLuxury
Powder room / guest WCAED 15,000–25,000AED 25,000–45,000AED 45,000–70,000
Standard bathroomAED 35,000–55,000AED 55,000–90,000AED 90,000–140,000
Master ensuiteAED 50,000–80,000AED 80,000–130,000AED 130,000–200,000
Master + walk-in shower + freestanding tubAED 70,000–110,000AED 110,000–180,000AED 180,000–300,000+
What's included: Full gut, waterproofing, tiling (walls + floor), vanity unit, shower enclosure, fixtures, lighting, mirror, exhaust fan, painting.

3. Full Villa Renovation

Turnkey villa renovation covers everything from demolition to handover. Pricing depends heavily on villa size, community, and scope.

Villa SizeEssentialPremiumLuxury
2–3 BR townhouseAED 120,000–250,000AED 250,000–450,000AED 450,000–700,000
4 BR villaAED 200,000–400,000AED 400,000–700,000AED 700,000–1,200,000
5–6 BR villaAED 350,000–600,000AED 600,000–1,000,000AED 1,000,000–2,000,000
Signature / mansionAED 500,000+AED 1,000,000+AED 2,000,000+

Want an Exact Quote for Your Villa?

These are ranges. A free 45-minute site visit gives us everything we need for an exact, itemised quote — no obligation.

Book Free Site Visit on WhatsApp
Location Matters

4. Community Premium Multipliers

Not all communities are created equal. Access restrictions, material transport logistics, and HOA requirements all affect pricing.

CommunityPremiumWhy
Arabian RanchesBaselineStandard access, no premium
Dubai Hills Estate+5–10%Emaar HOA requirements
Jumeirah Golf Estates+10–15%Gated access, larger villas
Palm Jumeirah+20–25%Island access, material transport, security clearance
Al Barari+25–30%Strict HOA, premium finishes expected
Emirates Hills+30–35%Ultra-premium standard, complex logistics, security protocols

5. Glass & Aluminium Works

In-house fabrication and installation — no outsourcing, no middlemen.

ItemPrice Range (AED)
Frameless shower enclosure (standard)3,500–7,000
Frameless shower enclosure (custom)7,000–15,000
Glass balustrade (per linear metre)1,200–2,500
Glass partition wall800–2,000 per sqm
Aluminium sliding doors (per panel)4,000–12,000
Skylight8,000–25,000

6. Swimming Pool Renovation

ScopePrice Range (AED)
Retiling + replastering40,000–80,000
Full renovation (tile + equipment + deck)80,000–180,000
New pool construction120,000–350,000+
Infinity edge upgrade+50,000–120,000
What Others Don't Tell You

7. The Hidden Costs

These costs are often NOT included in competitor quotes:
  • Dubai Municipality permit: AED 2,000–8,000 depending on scope
  • NOC from community developer: AED 500–5,000 (varies by community)
  • DEWA modifications: AED 3,000–15,000 if electrical capacity needs upgrading
  • AC duct modifications: AED 2,000–10,000 if layout changes affect airflow
  • Waste disposal: AED 1,500–5,000 (demolition debris, old materials)
  • Temporary storage: AED 500–2,000/month if furniture needs relocating
  • Waterproofing warranty: Some contractors skip proper waterproofing to save AED 3,000–8,000
  • Final clean: AED 800–2,500 for professional post-construction cleaning
First Unicorn difference: All of the above are included in our quotes as standard line items. No surprises at handover.
Protect Yourself

8. How to Read a Renovation Quote

Green Flags ✅

  • Itemised material specifications (brand, model, colour code)
  • Separate labour and material costs visible
  • Milestone-based payment schedule (not more than 30% upfront)
  • Timeline with specific start and completion dates
  • Warranty terms in writing
  • Company trade licence number on the quote

Red Flags 🚩

  • "Material allowance" instead of specific products — they'll upsell later
  • 50%+ required upfront — cash flow risk, financial instability
  • "Approximately" timelines with no contractual commitment
  • No company stamp, trade licence, or physical address
  • Verbal promises without written documentation
  • Significantly lower than other quotes (>30% below) — corner-cutting incoming

Ready for a Precise Quote?

This guide gives you ranges. A free site visit gives us everything we need for an exact, itemised quote — no obligation.

Explore More

Our Services

Swimming PoolKitchen RenovationBathroom RenovationVilla RenovationGlass & AluminiumSolar Panels

Popular Communities

Palm JumeirahArabian RanchesEmirates HillsDubai HillsDAMAC HillsTilal Al Ghaf
Chat on WhatsApp