Dubai Municipality permits, DDA, Trakhees, DEWA, Civil Defense and developer NOCs — drawings prepared, files submitted, comments answered, inspections attended. One team holds the whole process so you never chase an authority again.
Registered with Dubai Municipality, DDA-approved and Trakhees-listed. We prepare the drawings, submit them, chase the file daily, and hand you the stamped permit.

Most delays come from the wrong approval route or drawings that don’t meet an authority’s exact standard. After 800+ submissions we know what DM, DDA, Trakhees, DEWA and DCD each want to see — before the file is opened.

Villa modifications, structural changes, fit-outs, MEP, single-line diagrams and fire-safety layouts — drawn or adapted to each authority’s submission template by registered engineers.

We submit, pay authority fees on your behalf, answer comments, attend every inspection and close site notes — with status updates on WhatsApp until the permit is in your hand.
Fees depend on authority and scope — a fixed professional fee is confirmed upfront after a free document review. Authority charges are billed at cost, with receipts.
Next: free document review confirms scope.
WhatsApp — DM PermitNext: we identify your exact zone authority.
WhatsApp — DDA / TrakheesNext: load assessment from your drawings.
WhatsApp — DEWA ApprovalNext: fire-layout review against DCD code.
WhatsApp — Civil DefenseNext: we sequence NOC then permit.
WhatsApp — Community NOCNext: free review maps every approval needed.
WhatsApp — Full PackageYou can — most owners try once. Here is what the file actually needs to clear on the first pass.
| First Unicorn | Submitting alone | |
|---|---|---|
| Approval path | Identified correctly, first time | Often the wrong authority / order |
| Drawings | Registered engineer, to template | Rejected for format / detail |
| Comments | Answered same day | Weeks lost per back-and-forth |
| Inspections | We attend & close notes | Rescheduled, re-queued |
| Timeline | Weeks | Stretches to 3–6 months |
Modifications, extensions and fit-outs we have taken through Dubai’s authorities — every image a First Unicorn project.






With correct drawings, typically 1–3 weeks for villa modifications and fit-outs. The long waits owners hear about usually come from format or detail rejections — which is exactly what a properly prepared first submission avoids.
Usually both — the developer NOC (Emaar, Nakheel, DAMAC, etc.) comes first, then the authority permit. We sequence and handle the whole chain so nothing stalls waiting on the other.
Title deed, Emirates ID or passport copy, existing drawings if you have them, and photos of the area. We confirm the full list in the free document review.
Yes — taking over stuck files is routine for us. We read the rejection comments, correct the drawings to the authority’s standard, and resubmit.
It depends on the approval type and scope. You get a fixed professional fee upfront after the free review; authority charges are billed at cost with receipts, so there are no surprises.
Free document review, fixed fee upfront, every Dubai authority under one team.
Send My Documents on WhatsApp