DUBAI · 2026 RANKING

Top 10 Swimming Pool Companies in Dubai (2026)

A Dubai swimming pool is a structural, waterproofing and MEP project needing DM / Trakhees / DDA approvals — not just a landscaping add-on. We ranked the top swimming pool contractors in Dubai on structural build quality, approvals handled, filtration/MEP and delivery.

WhatsApp a Fixed QuoteCall +971 58 565 8002

Updated 2026-10-13 — Latest 2026 prices and availability

Quick Answer

The best swimming pool contractors in Dubai handle structural design, waterproofing, MEP, filtration and DM/Trakhees approvals end-to-end. First Unicorn and Dubai Lux Renovate deliver pools within a full villa contract; Skylark Pools, ILP and Kabco are specialist pool builders.

How We Ranked

We scored companies on structural/technical capability, approvals handled in-house (community NOC + DM/Trakhees permits), fixed-price transparency, warranty length, community coverage and verified reviews.

1 First Unicorn Interiors

800+ projects · 87 communities · 3-yr warranty

The premium swimming pool construction brand of First Unicorn Group. In-house team (no subcontractors) across 87 Dubai villa communities, 15+ years, DED-licensed, fixed-price contracts with every approval handled in-house. The most comprehensive community-specific guides in the UAE. Visit site →

2 Dubai Lux Renovate

800+ projects · fixed-price lane · 3-yr warranty

The value / fixed-price sister brand — itemised fixed quotes with no allowance pricing, 800+ completed projects across 58 communities. Best when you want premium delivery at a transparent, locked price. Visit site →

3 Unicorn Renovations

First Unicorn Group · single-team turnkey

The turnkey swimming pool construction arm of First Unicorn Group — one accountable team from design to handover, same in-house trades and warranty. A strong pick for owners who want one contract end-to-end. Visit site →

4 Skylark Pools

Luxury custom concrete pools with design, DM/DDA authority approvals and construction under one roof.

5 ILP (Infinite Leisure Pools)

Custom pool design, construction and maintenance for villas, resorts and commercial projects across the UAE.

6 Kabco Group

Concrete (gunite/shotcrete), block-and-render and fibreglass pools to DM, Trakhees and DDA standards, including MEP and filtration.

7 Better Gardens (BG Pool + Landscape)

17 years of bespoke pool design and construction for luxury residential and commercial properties.

8 Blue Dolphin

Pool design, construction, cleaning and maintenance across Dubai.

9 Zodiac Pools

High-quality pool construction from plunge pools to large residential and commercial pools.

10 Exterior Space

Boutique design-and-build studio for luxury landscaping and swimming pool construction.

Frequently Asked Questions

How much does a swimming pool cost in Dubai?

A standard 8x4m family pool typically runs AED 120,000–250,000; overall pool construction ranges AED 70,000–500,000+ depending on size, design and features.

Do I need approval to build a pool in Dubai?

Yes — swimming pool construction needs a community NOC and a DM/Trakhees/DDA permit. A pool contractor secures these as part of the build.

How long does pool construction take?

A well-built pool is a 6–16 week project depending on size, structure and finishes.

Related: Pool Renovation service · Pool Construction Cost · Swimming Pool Contractor

More 2026 Dubai rankings: Top Villa Renovation Companies · Top Villa Extension Companies · Top Office Fit-Out Companies · Top Villa Construction Companies · Top Villa Fit-Out Companies

Get a fixed quote

Send your project on WhatsApp for a fixed price and a free site visit.

Swimming pool companies in Dubai: how to choose and what it costs

Swimming pool companies in Dubai are not all equal. A pool is a structural, waterproofing and MEP project that needs approvals from Dubai Municipality, DEWA, and often your master developer (Emaar, Nakheel, Damac) or Trakhees on the Palm. The best contractors handle the full cycle: structural design, waterproofing, MEP, filtration, and approvals. For a new residential pool, expect to pay between AED 145,000 and AED 400,000, with build times from 6 to 16 weeks. For example, a standard 8x4m pool with skimmer typically falls in the AED 145,000-200,000 range, while an infinity or luxury pool with a balance tank can reach AED 280,000-400,000. Renovating an existing pool costs AED 30,000-100,000 and takes 3-6 weeks. Always confirm the contractor's experience with DM/Trakhees/DDA approvals and ask for a detailed quote after an on-site survey. Prices vary by finish level, size, and community tier, so get at least three quotes. Remember, the cheapest option may not include proper waterproofing or MEP, leading to costly issues later.

What permits are required for building a swimming pool in Dubai?

Building a pool in Dubai requires approvals from several authorities depending on your location. For villa communities under Dubai Municipality, you need building plan approval (10-15 working days) and a DEWA connection (7-14 days). If you live in a master-planned community like Emaar or Nakheel, you also need a No Objection Certificate (NOC) from the master developer, which takes 10-20 working days. On the Palm Jumeirah or in Jebel Ali, Trakhees approval is mandatory (15-25 working days). In Damac communities, you must apply via the DAMAC Living app, with NOC processing taking 5-15 days and admin fees of AED 1,050-5,000, plus a refundable security deposit of AED 5,000-20,000. Civil Defence approval (5-10 days) may be needed for large pools. Always check with your contractor to ensure they handle all permits as part of the service.

How much does a swimming pool cost in Dubai?

The cost of a residential swimming pool in Dubai ranges from AED 145,000 to AED 400,000, depending on size, finish, and complexity. A standard 8x4m pool with a skimmer typically costs AED 145,000-200,000. A larger lap pool or family pool might be AED 200,000-280,000. For an infinity or luxury pool with a balance tank, expect AED 280,000-400,000. These are indicative ranges; final pricing depends on the finish level (essential, premium, luxury, or ultra), the number of bedrooms (as a proxy for pool size), and the community tier. For example, a 3-bedroom villa pool might be at the lower end, while a 6-bedroom villa pool could be at the higher end. Renovating an existing pool costs AED 30,000-100,000 and takes 3-6 weeks. Always get a detailed quote after an on-site survey.

What should I look for in a swimming pool contractor?

When choosing a swimming pool contractor in Dubai, verify their experience with local regulations and approvals. They should handle Dubai Municipality, DEWA, Trakhees, and master developer NOCs as part of the service. Check their portfolio for similar projects in your community. Ask about their waterproofing and MEP expertise, as these are critical for a durable pool. Ensure they offer a warranty—our company provides a 3-year warranty. Also, confirm they use quality filtration systems and materials. Request a detailed quote that breaks down costs for structural work, waterproofing, MEP, and approvals. Finally, read client reviews and ask for references. A reputable contractor will be transparent about timelines and potential challenges.

Swimming pool installation Dubai: permits, cost ranges and what the build includes

Swimming pool installation Dubai is a structural, waterproofing and MEP project that needs Dubai Municipality, Trakhees or DDA stamps — not a landscaping add-on. First Unicorn Interiors builds new residential pools in the indicative range of AED 145,000-400,000, on site in 6-16 weeks after drawings and survey, with a 3-year warranty. A new tank is never published below AED 145,000; that floor does not apply to resurfacing an existing pool. Who signs depends on the plot. Freehold villas under Dubai Municipality file a building / fit-out plan (10-15 working days). Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions file Trakhees (15-25 working days). Damac Hills 1 routes through DDA; Damac Hills 2 through Dubai Municipality, plus a DAMAC Living-app community NOC (5-15 working days), admin fees of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. Emaar, Nakheel and Damac master-developer NOCs typically take 10-20 working days. DEWA connection or modification for pumps and lighting is 7-14 working days; Civil Defence fire and life safety is 5-10 working days where the plant room triggers it. Several clocks run partly in parallel — do not sum them. DLD title-deed papers go in the pack. Occupiers under a RERA tenancy need landlord consent before excavation. Standard skimmer 8x4m work, lap or oversized family pools, and overflow / infinity with a balance tank sit in published tiers inside the same band. Community tier, finish level and villa size move you inside those ranges; they are not multiplied into a new headline figure. Indicative ranges only. Final cost depends on finish level, materials sourcing, structural complexity and developer approval cycle, confirmed only after on-site survey (as of 2026-08-17). WhatsApp +971 58 565 8002.

How much does swimming pool installation cost in a Dubai villa?

A new residential pool is AED 145,000-400,000 as an indicative range, confirmed only after survey. That band is the published floor-to-ceiling for a new build: First Unicorn Interiors will not quote a new tank below AED 145,000. Inside it, the tier you actually buy is what moves the number. A standard skimmer pool, typically 8x4m, is AED 145,000-200,000 and 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 and 8-12 weeks. Overflow / infinity work with a balance tank is AED 280,000-400,000 and 12-16 weeks. New-pool work is higher than a resurface; landscaping is often paired and billed separately. Community tier, finish level (essential through ultra) and bedroom count change where you land inside those bands. They explain variance in words; they are not multiplied into a second headline price. An existing pool being resurfaced, retiled or given a plant upgrade is a different product: AED 30,000-100,000 in 3-6 weeks, exempt from the new-build floor, and not a new installation. Figures as of 2026-08-17. WhatsApp +971 58 565 8002 for a fixed quote after survey.

Which permits does a Dubai villa pool need, and who stamps them?

Start with the land-use stamp. Most freehold villas file a Dubai Municipality building / fit-out plan (10-15 working days). Palm Jumeirah, Jebel Ali and other Trakhees plots file Trakhees (15-25 working days). Damac Hills 1 routes through DDA; Damac Hills 2 through Dubai Municipality. That authority file does not replace the master-developer NOC. Emaar, Nakheel and Damac master-developer NOCs typically take 10-20 working days. DAMAC community management NOC for Hills 1 and 2, Akoya, Lagoons and Islands is 5-15 working days via the DAMAC Living app, with admin fees of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. Damac Hills 2 also needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC. Structural additions over 50% BUA need an Al Sa'fat 2.0 sustainability statement. DEWA connection or modification for pumps and lighting is 7-14 working days. Civil Defence fire and life safety is 5-10 working days where the plant room requires it. DLD title deed sits in the pack. Tenants need RERA-aligned landlord consent before excavation. Several steps run partly in parallel — do not add the day counts.

How long does swimming pool installation take in Dubai after drawings?

On-site delivery for a new residential pool is 6-16 weeks after drawings, waterproofing specification and filtration plant are locked, plus the authority clocks above. Standard skimmer 8x4m work is 6-10 weeks. Lap or oversized family pools are 8-12 weeks. Overflow / infinity with a balance tank is 12-16 weeks because the hydraulic design, balance tank and overflow weir add structure and commissioning. Approval risk on this scope is medium. The delay is rarely the pour; it is drawings bouncing between Dubai Municipality or Trakhees, the master developer, and DEWA for the plant-room load. Palm Jumeirah and Jebel Ali sit on the longer Trakhees window (15-25 working days). Damac plots add the Living-app NOC and, in Hills 2, the landscape NOC. Existing-pool renovation is shorter: 3-6 weeks for resurfacing, retiling and plant upgrades, because you are not opening a new tank. First Unicorn Interiors holds a 3-year warranty on the works it installs. Indicative ranges only. Final programme depends on finish level, materials sourcing, structural complexity and developer approval cycle, confirmed after on-site survey. WhatsApp +971 58 565 8002.

What a pool contractor in Dubai must handle before excavation

Pool contractor in Dubai searchers are usually villa owners comparing a landscaper with a liner kit against a licensed structural, waterproofing and MEP contractor — and only the second is what Dubai Municipality, Trakhees and DDA will stamp. A residential pool is an excavated shell, membrane, hydraulics and plant-room filtration on a DEWA-fed circuit, not a garden add-on. Before soil is cut, building or fit-out plans go to Dubai Municipality (10-15 working days) or to Trakhees on Palm Jumeirah, Jebel Ali and other Trakhees plots (15-25 working days). Damac Hills 1 routes through DDA; Damac Hills 2 through Dubai Municipality. Civil Defence reviews fire and life safety in 5-10 working days where the plant room or enclosure requires it. DEWA connection or modification sits at 7-14 working days. Emaar, Nakheel and DAMAC master-developer NOCs take 10-20 working days and run partly in parallel — those tracks must not be added into one calendar. DAMAC Living applications add a community NOC of 5-15 working days, an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000 against common-area damage. Damac Hills 2 also needs a separate landscape NOC; major extensions pay a GFA fee to DAMAC Properties, and structural additions over 50% BUA need an Al Sa'fat 2.0 sustainability statement. RERA community rules and DLD plot records still constrain setbacks, GFA and whether the pool sits inside the buildable envelope. Indicative new-build residential cost is AED 145,000-400,000 over 6-16 weeks, with medium approval risk. First Unicorn Interiors quotes in AED only, backs the works with a 3-year warranty, and confirms every figure only after on-site survey. WhatsApp +971 58 565 8002.

How much does a new villa pool cost with a contractor in Dubai?

How much a pool contractor charges depends on whether you are building a new shell or only resurfacing an existing one. For a new residential pool the indicative range is AED 145,000-400,000 over 6-16 weeks, with medium approval risk; landscaping is often paired and a new pool sits higher than a resurface. A standard 8x4m skimmer pool is AED 145,000-200,000 in 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 in 8-12 weeks. An overflow or infinity pool with a balance tank is AED 280,000-400,000 in 12-16 weeks. Those bands already absorb community tier, finish level and villa size as variance drivers — they must not be multiplied into new headline figures. An existing pool that only needs resurfacing, retiling or plant upgrades is a different scope: AED 30,000-100,000 over 3-6 weeks, and that variant is exempt from the AED 145,000 new-build floor. All figures are indicative ranges as of 2026-08-17. Final cost depends on finish level, materials sourcing, structural complexity and the developer approval cycle, and is confirmed only after on-site survey. First Unicorn Interiors prices in AED only and will not publish a new-build figure below AED 145,000.

Which Dubai permits and NOCs does a pool contractor file?

A competent pool contractor sequences authority and master-developer files before excavation, because several run partly in parallel and must not be summed. Dubai Municipality building or fit-out plan approval is 10-15 working days on most mainland villas. Trakhees takes 15-25 working days on Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions. Civil Defence fire and life-safety review is 5-10 working days where the plant room or enclosure triggers it. DEWA connection or modification is 7-14 working days. Master-developer NOCs from Emaar, Nakheel or DAMAC take 10-20 working days. DAMAC Living-app applications add a community NOC of 5-15 working days, an admin fee of AED 1,050-5,000, and a refundable security deposit of AED 5,000-20,000 against common-area damage and overruns past the approved period. Damac Hills 1 files with DDA; Damac Hills 2 files with Dubai Municipality and needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC. Structural additions over 50% BUA require an Al Sa'fat 2.0 sustainability statement. RERA community regulations and DLD title and plot data still govern setbacks and whether the pool counts as added GFA. Approval risk for a residential pool is medium.

Should you hire a specialist builder or a villa pool contractor in Dubai?

Specialist pool builders and villa contractors appear in Dubai results, but they do not replace the same approvals. A specialist can design the shell, overflow weir and filtration plant; a villa contractor such as First Unicorn Interiors folds the pool into the same structural, waterproofing and MEP package as the house, which is often cleaner when the pool is part of a renovation. Either route still needs Dubai Municipality or Trakhees (or DDA in Damac Hills 1) plan approval, a master-developer NOC, DEWA for any connection or modification, and Civil Defence where fire and life safety applies. RERA community rules and DLD plot constraints do not disappear because a specialist is on site. Choose the contractor that will own the NOC pack, the waterproofing warranty and the plant-room commissioning — not the one that only tiles the basin after someone else has excavated. First Unicorn Interiors delivers pools inside a full villa contract, quotes in AED only, and issues a 3-year warranty. Indicative new-build programmes run 6-16 weeks after approvals; existing-pool refurbishment is 3-6 weeks. Confirm programme and price only after survey. WhatsApp +971 58 565 8002 for a fixed quote once the plot, community and shell type are known.

How pool contractors in Dubai permit, price and build a villa pool

Pool contractors in Dubai are licensed builders who design, permit and construct a swimming pool as a structural, waterproofing and MEP project — not a landscaping add-on. In 2026 the work sits under Dubai Municipality for most mainland villas, Trakhees for Palm Jumeirah and Jebel Ali, and the Dubai Development Authority where a master developer routes that way, including Damac Hills 1. First Unicorn Interiors treats the pool as part of a villa renovation contract: excavation, reinforced shell, tanking, skimmer or overflow hydraulics, filtration plant, DEWA power and water modifications, then tiling, deck and lighting — with a 3-year warranty. Indicative new-build cost is AED 145,000-400,000 over 6-16 weeks, confirmed only after on-site survey. A standard skimmer pool of about 8x4m typically sits at AED 145,000-200,000 in 6-10 weeks; a lap or oversized family pool at AED 200,000-280,000 in 8-12 weeks; an overflow or infinity pool with a balance tank at AED 280,000-400,000 in 12-16 weeks. Resurfacing an existing pool is a different job at AED 30,000-100,000 in 3-6 weeks. Community tier, finish level and villa size move the outcome within those bands — they do not create a new headline figure. Approvals run partly in parallel and must not be added end to end: Dubai Municipality building or fit-out plan approval takes 10-15 working days; Civil Defence fire and life safety 5-10; DEWA connection or modification 7-14; a master-developer NOC for Emaar, Nakheel or Damac 10-20. Trakhees jurisdictions need 15-25 working days. RERA and DLD do not issue the pool permit, but title, tenancy and community rules still constrain what a contractor may start. WhatsApp +971 58 565 8002 for a fixed quote after survey.

What should a Dubai pool contractor include in a new-build scope?

A serious pool contractor in Dubai prices a complete structural and MEP package, not a hole in the garden. First Unicorn Interiors sequences excavation and shoring, a reinforced concrete shell, waterproofing and tanking, then the plant room: pumps, filters, sanitation, pipework and DEWA-ready electrical loads. A standard 8x4m skimmer pool sits in the AED 145,000-200,000 band over 6-10 weeks. A lap or oversized family pool sits at AED 200,000-280,000 over 8-12 weeks because of extra excavation, more steel and a larger plant. Overflow and infinity designs with a balance tank sit at AED 280,000-400,000 over 12-16 weeks — hydraulic design, not tile colour, drives that jump. Finish level, community tier and villa size shift cost inside those published ranges; they are not multiplied into a new published figure. Approval risk for a new pool is medium: the contractor must hold Dubai Municipality or Trakhees drawings, Civil Defence where the plant room affects life safety, and a master-developer NOC before breaking ground. Existing-pool resurfacing, retiling and plant upgrades are a separate variant at AED 30,000-100,000 in 3-6 weeks and are not a new build. All figures are indicative as of 2026-08-17 and confirmed only after an on-site survey.

Which Dubai permits must pool contractors obtain before excavation?

Pool contractors cannot excavate on a Dubai villa plot until the right authority has stamped the drawings. Dubai Municipality building or fit-out plan approval takes 10-15 working days on most mainland plots. Civil Defence reviews fire and life safety in 5-10 working days where a plant room or electrical load is involved. DEWA connection or modification for pumps and lighting takes 7-14 working days. These clocks run partly in parallel — do not add them into a single wait. Master-developer NOCs for Emaar, Nakheel and Damac take 10-20 working days and sit on top of the municipality file, not instead of it. Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions need 15-25 working days of Trakhees review. Damac Hills 1 routes through the Dubai Development Authority; Damac Hills 2 routes through Dubai Municipality, with a separate landscape NOC and filings via the DAMAC Living app. DAMAC community-management NOC is 5-15 working days, with an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. Structural additions over 50% of built-up area need an Al Sa'fat 2.0 sustainability statement. RERA and DLD govern title and tenancy, not the pool stamp.

How do Emaar, Nakheel and Damac rules change a pool contractor's start date?

A pool contractor's start date in Dubai is set by the master developer as much as by Dubai Municipality. In Emaar, Nakheel and Damac communities the master-developer NOC takes 10-20 working days and adds to, rather than replaces, the authority file. Damac adds its own community-management layer: filings go through the DAMAC Living app, the NOC takes 5-15 working days, the admin fee is AED 1,050-5,000, and a refundable security deposit of AED 5,000-20,000 is held against common-area damage and overruns past the approved period. Damac Hills 1 routes to the Dubai Development Authority; Damac Hills 2 routes to Dubai Municipality and requires a separate landscape NOC — landscaping is often paired with a new pool. Major extensions pay a GFA fee to DAMAC Properties before the final NOC. Structural additions over 50% of built-up area need an Al Sa'fat 2.0 sustainability statement. Trakhees plots on Palm Jumeirah and in Jebel Ali add 15-25 working days of Trakhees review. Once permits clear, a new residential pool sits at AED 145,000-400,000 over 6-16 weeks. Figures are indicative as of 2026-08-17 and confirmed only after survey.

What the best swimming pool companies in Dubai must handle before they start digging

Best swimming pool companies in Dubai are the firms that design, waterproof, approve and commission a residential pool as a structural and MEP project, not a garden add-on. In 2026 that means a contractor who can produce Dubai Municipality or Dubai Development Authority drawings, file a master-developer NOC with Emaar, Nakheel or DAMAC, and, on Palm Jumeirah or Jebel Ali, route the same file through Trakhees. Civil Defence life-safety comments and a DEWA connection or modification sit on the same critical path; several of those clocks run in parallel and should not be added together. A standard skimmer pool of about 8x4m is typically AED 145,000-200,000 over 6-10 weeks. A lap or oversized family pool sits at AED 200,000-280,000 over 8-12 weeks. An overflow or infinity pool with a balance tank is AED 280,000-400,000 over 12-16 weeks. Across the residential market the indicative envelope is AED 145,000-400,000 and 6-16 weeks, confirmed only after an on-site survey. DAMAC communities add a DAMAC Living-app NOC of 5-15 working days, an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000; Damac Hills 1 routes through DDA and Damac Hills 2 through Dubai Municipality, with a separate landscape NOC in Hills 2. First Unicorn Interiors prices new pools inside a full villa contract, backs the work with a 3-year warranty, and issues a fixed quote on WhatsApp at +971 58 565 8002. Resurfacing an existing pool is a different job — AED 30,000-100,000 over 3-6 weeks — and is not a new-build figure.

How much do the best swimming pool companies in Dubai charge for a new villa pool?

The best swimming pool companies in Dubai quote a new residential pool inside AED 145,000-400,000 and a 6-16 week programme, with the spread driven by shell size, overflow design and finish. A standard skimmer pool of about 8x4m is AED 145,000-200,000 over 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 over 8-12 weeks. An infinity or overflow pool with a balance tank is AED 280,000-400,000 over 12-16 weeks. Community tier, finish level and villa size move the same job within that envelope: a compact three-bedroom plot sits toward the lower end, while a seven-bedroom villa, a luxury finish and a premium community push toward the top. New-build figures never sit below AED 145,000. Refurbishing an existing pool — resurfacing, retiling, plant upgrades — is AED 30,000-100,000 over 3-6 weeks and is not a new shell. These are indicative ranges as of 17 August 2026, confirmed only after an on-site survey. First Unicorn Interiors issues a fixed WhatsApp quote on +971 58 565 8002 and backs the pool with a 3-year warranty.

Which Dubai permits must a swimming pool contractor obtain before excavation?

A serious pool contractor in Dubai files more than a landscaping sketch. Dubai Municipality building or fit-out plan approval typically takes 10-15 working days. Where the villa sits under Dubai Development Authority — including Damac Hills 1 — the structural file goes to DDA; Damac Hills 2 stays with Dubai Municipality. Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions add a Trakhees cycle of 15-25 working days. Civil Defence fire and life-safety review is 5-10 working days. A DEWA connection or modification is 7-14 working days. Master-developer NOCs for Emaar, Nakheel or DAMAC run 10-20 working days and sit beside, not instead of, the authority stamp. DAMAC Living-app NOCs are 5-15 working days, with an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. Damac Hills 2 also needs a separate landscape NOC; major extensions pay a GFA fee, and Al Sa'fat 2.0 statements apply to structural additions over 50 percent of built-up area. Several clocks run partly in parallel — do not sum them. Title sits with the Dubai Land Department; RERA community rules can still restrict setbacks, working hours and contractor access after drawings are approved.

Should you hire a specialist pool builder or a villa renovation contractor in Dubai?

The best swimming pool companies in Dubai split into two workable models. Specialist pool builders concentrate on shell, waterproofing, filtration and commissioning. Villa renovation contractors such as First Unicorn Interiors fold the pool into a single structural, MEP and interior contract so the plant room, deck and finishes do not fight each other on site. For a new pool on a lived-in villa, the specialist path can be faster if drawings and NOCs are already in hand. For a full villa remodel — especially where the pool sits against a new extension or terrace — a single contractor who already holds the Dubai Municipality or DDA file reduces interface risk. Either model still has to clear Civil Defence, DEWA and the master-developer NOC; on Palm Jumeirah or Jebel Ali that includes Trakhees. Landscaping is often paired with a new pool, which is why a renovation contractor who already manages hardscape can keep one programme. Approval risk is medium. First Unicorn Interiors prices the pool inside the villa contract, offers a 3-year warranty, and quotes on WhatsApp at +971 58 565 8002.

Pool construction Dubai: permits, cost ranges and community approvals

Pool construction Dubai is a structural shell, waterproofing and MEP project, not a landscaping extra, and it cannot start until Dubai Municipality or Trakhees — plus, in gated villas, a master-developer NOC — have signed the drawings. Dubai Land Department (DLD) title should be clean first. RERA-regulated community rules, applied by Emaar, Nakheel and DAMAC, then fix setbacks, plant-room siting and whether an overflow edge is allowed. Dubai Municipality building and fit-out plan approval is 10-15 working days. Civil Defence fire and life safety is 5-10 working days. DEWA connection or modification is 7-14 working days. A master-developer NOC is commonly 10-20 working days. Trakhees (Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions) is 15-25 working days. Several of these clocks run partly in parallel and must not be summed. DAMAC Living-app NOCs for Hills 1 and 2, Akoya, Lagoons and Islands take 5-15 working days, with an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. Damac Hills 1 routes to Dubai Development Authority (DDA); Damac Hills 2 routes to Dubai Municipality and needs a separate landscape NOC. Structural additions over 50% BUA need an Al Sa'fat 2.0 sustainability statement. Indicative new-build cost as of 2026-08-17 is AED 145,000-400,000 over 6-16 weeks. Standard skimmer 8x4m: AED 145,000-200,000 in 6-10 weeks. Lap or oversized family: AED 200,000-280,000 in 8-12 weeks. Overflow or infinity with a balance tank: AED 280,000-400,000 in 12-16 weeks. Community tier, finish and villa size change the survey outcome, not extra published figures. Ranges are indicative only and confirmed only after on-site survey. First Unicorn Interiors delivers the pool inside a full villa contract with a 3-year warranty. WhatsApp +971 58 565 8002.

Which Dubai authorities must approve a villa swimming pool?

Dubai Municipality issues building and fit-out plan approval in 10-15 working days on the mainland. Civil Defence reviews fire and life safety in 5-10 working days. DEWA handles pump, lighting and plant-room connection or modification in 7-14 working days. Those files often overlap, so the calendar is not the sum of the three ranges. Gated communities add a master-developer NOC in 10-20 working days; Emaar, Nakheel and DAMAC each run their own portal, and RERA community rules sit behind those NOCs. Palm Jumeirah, Jebel Ali and other Trakhees areas go through Trakhees in 15-25 working days. DAMAC Hills 1 routes to Dubai Development Authority (DDA); DAMAC Hills 2 routes to Dubai Municipality. DAMAC Living-app NOCs take 5-15 working days, cost AED 1,050-5,000 in admin fees, and require a refundable security deposit of AED 5,000-20,000 against common-area damage and overruns past the approved period. Damac Hills 2 also needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC. DLD title should be unencumbered before the file opens. First Unicorn Interiors coordinates this sequence inside the villa contract.

How much does new pool construction cost in a Dubai villa?

The published new-build band is AED 145,000-400,000 over 6-16 weeks, as of 2026-08-17, with medium approval risk. No new-build figure should sit below AED 145,000. A standard skimmer pool at 8x4m is AED 145,000-200,000 in 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 in 8-12 weeks. An overflow or infinity pool with a balance tank is AED 280,000-400,000 in 12-16 weeks. Landscaping is often paired with a new pool and is one reason the upper end moves. Community grade, finish level from essential through ultra, and villa size all shift the survey number; those multipliers are described, not multiplied into extra headlines. Waterproofing specification, filtration plant, structural complexity and the developer approval cycle also move the outcome. These are indicative ranges only. Final cost depends on finish level, materials sourcing, structural complexity and developer approval cycle, and is confirmed only after on-site survey. First Unicorn Interiors prices the pool inside the full villa contract and holds a 3-year warranty. WhatsApp +971 58 565 8002 for a site survey, not a phone quote.

When is pool refurbishment cheaper than new construction in Dubai?

A new shell is a 6-16 week structural project at AED 145,000-400,000. If the villa already has a pool, resurfacing, retiling and plant upgrades are a different scope: AED 30,000-100,000 over 3-6 weeks. That refurbishment band is exempt from the new-build floor of AED 145,000 because it is not a new excavation. New work still needs Dubai Municipality or Trakhees drawings, Civil Defence where life-safety plant is altered, DEWA if pumps or lighting change, and a master-developer NOC in Emaar, Nakheel or DAMAC communities. Refurbishment is faster because the shell, setbacks and most of the paper trail already exist, though a DAMAC landscape NOC can still apply in Damac Hills 2 if paving and planting change. Al Sa'fat 2.0 sustainability statements apply to structural additions over 50% BUA — a new-build concern more than a retile. Approval risk is medium on new construction because drawings, waterproofing and DEWA hold the critical path. First Unicorn Interiors will not sell a refurb price as a new pool. Confirm the existing shell on site before choosing the cheaper path.

Swimming pool builders in Dubai: cost, permits and delivery

Swimming pool builders in Dubai deliver a structural, waterproofing and MEP package, not a landscaping extra. A new residential pool — shell, tanking, filtration and electrical plant — sits in an indicative range of AED 145,000-400,000 and typically takes 6-16 weeks on site. Those figures are current as of 17 August 2026. They are not a quoted price. Finish level, materials sourcing, structural complexity and the developer approval cycle all move the outcome, and the number is confirmed only after an on-site survey. Who permits the work depends on the community. Most villa plots file a building or fit-out plan with Dubai Municipality, commonly 10-15 working days. Palm Jumeirah, Jebel Ali and other Trakhees jurisdictions file with Trakhees instead, commonly 15-25 working days. Emaar, Nakheel and DAMAC also require a master-developer NOC, commonly 10-20 working days. DEWA reviews a new or modified connection for pumps, lighting and heating, commonly 7-14 working days. Where a plant room or neighbouring villa works raise a life-safety point, Civil Defence review commonly takes 5-10 working days. These tracks overlap. They must not be added into one total. The plot should match the Dubai Land Department title deed before submission, and the community developer should be the RERA-registered master developer for that project. Damac Hills splits: Hills 1 is routed to the Dubai Development Authority, Hills 2 to Dubai Municipality, plus a DAMAC community NOC. First Unicorn Interiors includes the pool in the villa contract, with a 3-year warranty. Scope is confirmed on WhatsApp at +971 58 565 8002.

What does a new swimming pool cost in Dubai in 2026?

For a new pool, price the tier that matches the water. A standard skimmer pool around 8x4 m is indicatively AED 145,000-200,000 and typically takes 6-10 weeks. A lap pool or an oversized family pool is indicatively AED 200,000-280,000 over 8-12 weeks. An overflow or infinity pool with a balance tank is indicatively AED 280,000-400,000 over 12-16 weeks. New construction starts at AED 145,000. The overall band of AED 145,000-400,000 is only the span of those three tiers. Inside the band, a prime early community sits higher than a later outer community. An essential finish sits below a premium specification; a luxury or ultra finish sits above it. A three-bedroom villa sits below a four-bedroom baseline, while five-bedroom, six-bedroom and larger homes step up because the shell, deck and plant grow. Landscaping is often paired with the pool and is not inside these figures. This is not a quotation. Ranges are indicative as of 17 August 2026 and are confirmed only after an on-site survey. First Unicorn Interiors prices in AED only and includes a 3-year warranty.

Which permits do pool builders file for Dubai villa communities?

The filing authority follows the plot, then the master developer. Dubai Municipality building or fit-out approval commonly takes 10-15 working days. Palm Jumeirah, Jebel Ali and other Trakhees areas file with Trakhees, commonly 15-25 working days. An Emaar, Nakheel or DAMAC master-developer NOC commonly takes 10-20 working days. DEWA reviews a new or modified pump and heating connection in 7-14 working days. Civil Defence life-safety review, where required, commonly takes 5-10 working days. These tracks run partly in parallel and must not be added into one total. DAMAC communities add their own NOC, commonly 5-15 working days, via the DAMAC Living app. The admin fee is indicatively AED 1,050-5,000 and the security deposit AED 5,000-20,000, refundable against common-area damage and overruns past the approved period. Damac Hills 1 routes to the Dubai Development Authority. Damac Hills 2 routes to Dubai Municipality and needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC. Al Sa'fat 2.0 applies only if a structural addition exceeds 50% of built-up area. The applicant must match the Dubai Land Department title, and the community its RERA-registered master developer. Approval risk on a new residential pool is medium.

How long does a Dubai pool take, including an existing-pool refurbishment?

On-site work for a new residential pool typically takes 6-16 weeks, separate from the permit clock. A standard 8x4 m skimmer pool is typically 6-10 weeks, a lap or oversized family pool 8-12 weeks, and an infinity or overflow pool with a balance tank 12-16 weeks. Dubai Municipality commonly takes 10-15 working days, Trakhees 15-25, a master-developer NOC 10-20 and DEWA 7-14. Several of these run partly in parallel, so drawings, the NOC and the DEWA file should overlap rather than queue. An existing pool is a different job. Resurfacing, retiling and plant upgrades are indicatively AED 30,000-100,000 and typically take 3-6 weeks. That band is only for a pool already built. It is not a new shell and sits outside the AED 145,000 floor for new construction. A new pool costs more than a resurface, and landscaping paired with either job is not included. Tanking failure, a tight plant room or a DEWA load increase can still move cost and weeks, so the range is confirmed only after survey. First Unicorn Interiors agrees scope before work starts, with a 3-year warranty. WhatsApp +971 58 565 8002.

Swimming pool construction companies in Dubai: cost, permits and delivery

swimming pool construction companies in dubai are building contractors who deliver the structural pit, the waterproofing envelope, filtration, the mechanical, electrical and plumbing plant, and the permit file as one scope. Dubai Municipality reviews the building plan in 10-15 working days. A master-developer no-objection certificate from Emaar, Nakheel or DAMAC takes 10-20 working days, and Trakhees takes 15-25 working days on Palm Jumeirah, Jebel Ali and other Trakhees plots. Those clocks run partly in parallel, so each one is read on its own. DEWA handles the electrical connection or modification for pumps and heating in 7-14 working days. Civil Defence fire and life-safety review, where the plant room requires it, takes 5-10 working days. Damac Hills 1 files route through the Dubai Development Authority. Damac Hills 2 files route through Dubai Municipality, and that community also needs a separate landscape no-objection certificate. DAMAC community management takes 5-15 working days, with an admin fee of AED 1,050-5,000 and a refundable security deposit of AED 5,000-20,000. A new residential pool is indicatively AED 145,000-400,000 over 6-16 weeks. First Unicorn Interiors carries the pool inside the villa contract, with a 3-year warranty, and confirms that cost on WhatsApp at +971 58 565 8002 only after an on-site survey. The Dubai Land Department affection plan fixes the plot boundary. RERA jointly owned property rules apply where the deck or overflow meets common area. Ranges are indicative as of 2026-08-17 and depend on finish, sourcing, structure and the approval cycle.

What should a swimming pool construction company in Dubai actually deliver?

A capable firm designs the pit and the deck as structure. The shell needs engineering for soil, the water table and surcharge from the villa, then a continuous waterproofing system before any finish goes down. Filtration, the balance tank on an overflow pool, lighting and the electrical feed are mechanical, electrical and plumbing work, so the same contractor owns the DEWA liaison and the load is known before equipment is ordered. Dubai Municipality expects a building drawing for the addition. The Dubai Land Department affection plan shows that the waterline sits inside the plot and clear of the setbacks on the title. Where the deck, overflow channel or plant room touches a neighbour or common area, RERA jointly owned property rules sit beside the master-developer no-objection certificate. Emaar, Nakheel and DAMAC each issue that certificate on their own clock of 10-20 working days, alongside the municipal drawing. First Unicorn Interiors treats the pool as part of the villa renovation, documents structure and plant together, and backs the installation with a 3-year warranty. Ask which authority route applies to your community before mosaic colour is discussed.

How much does a new swimming pool cost in Dubai?

For a new residential pool the indicative band is AED 145,000-400,000, and every new-build figure stays at or above AED 145,000. A standard skimmer pool on the standard 8 by 4 metre size sits at AED 145,000-200,000 over 6-10 weeks. A lap pool or an oversized family pool sits at AED 200,000-280,000 over 8-12 weeks. An overflow or infinity pool with a balance tank sits at AED 280,000-400,000 over 12-16 weeks. The full range is confirmed only after an on-site survey. Finish level, materials sourcing, structural complexity and the developer approval cycle move a project inside its tier. Community tier, finish and home size explain the spread. Tier-1 communities and luxury or ultra finishes push toward the top of the published band. Essential finishes and a three-bedroom home sit toward the lower end of that same band. Homes of five, six and seven or more bedrooms sit higher. The published ranges already contain that spread. Resurfacing, retiling or a plant upgrade on a pool that already exists is a separate scope, indicatively AED 30,000-100,000 over 3-6 weeks. First Unicorn Interiors confirms any figure on WhatsApp +971 58 565 8002 only after the survey.

Which permits and community rules delay a Dubai pool?

A new pool is programmed at 6-16 weeks, and authority clocks run partly in parallel with that programme, so each clock is read on its own. Dubai Municipality building approval is 10-15 working days. DEWA connection or modification is 7-14 working days. Civil Defence fire and life safety, where the plant room needs it, is 5-10 working days. Community control is the delay owners underestimate. A master-developer no-objection certificate for Emaar, Nakheel or DAMAC is 10-20 working days and varies by community. Trakhees jurisdictions, including Palm Jumeirah and Jebel Ali, take 15-25 working days. Inside DAMAC, community management takes 5-15 working days. Applications go through the DAMAC Living app. The admin fee is AED 1,050-5,000 and the security deposit is AED 5,000-20,000, refundable against common-area damage and overruns past the approved period. Damac Hills 1 routes to the Dubai Development Authority. Damac Hills 2 routes to Dubai Municipality and needs a separate landscape no-objection certificate. Structural additions over 50 percent of built-up area need an Al Sa'fat 2.0 sustainability statement. Major extensions pay a gross-floor-area fee to DAMAC Properties before the final no-objection certificate. Residential approval risk is medium. First Unicorn Interiors carries this file inside the villa contract.

Choosing a swimming pool contractor on Palm Jumeirah: permits, costs and timelines

Most people searching for a swimming pool contractor on Palm Jumeirah own a villa on the Fronds, a Signature Villa or a Garden Home. They need a builder who can also take the pool through the right authority. On Palm Jumeirah that authority is Trakhees, the building regulator of the Ports, Customs and Free Zone Corporation, not Dubai Municipality. Trakhees review typically takes 15-25 working days. The Nakheel master developer NOC takes 10-20 working days. If the pool plant needs new or upgraded power, the DEWA connection or modification approval takes 7-14 working days. These approvals run partly in parallel, so don't add them together. A capable contractor prepares the structural calculations, waterproofing details and filtration and MEP drawings, then submits the full package against the owner's DLD title deed. Indicative costs on Palm Jumeirah: a standard skimmer pool is AED 145,000-200,000 over 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 over 8-12 weeks. An infinity or overflow pool with a balance tank is AED 280,000-400,000 over 12-16 weeks. Frond plots usually sit toward the top of each range. The reasons are a high water table on reclaimed land, salt exposure from the sea, and tight site access for excavation and concrete pours. First Unicorn Interiors builds Palm Jumeirah pools under a single villa contract covering structure, tiling, plant room and landscaping, with a 3-year warranty. All ranges are indicative and are confirmed only after an on-site survey. WhatsApp +971 58 565 8002 for a fixed quote.

Do you need Trakhees or Dubai Municipality approval for a pool on Palm Jumeirah?

On Palm Jumeirah you need Trakhees, not Dubai Municipality. Trakhees handles building permits for Palm Jumeirah, Jebel Ali and its other jurisdictions, and a pool counts as a structural and MEP change, not a landscaping job. Its review typically takes 15-25 working days. Before Trakhees will accept the file, Nakheel as master developer usually issues its NOC, which takes 10-20 working days. Nakheel checks setbacks, boundary walls, how the pool relates to the beach or plot edge, and the community's design guidelines. If the pump, heater or chiller needs more electrical load, a DEWA connection or modification approval adds 7-14 working days. Several of these steps overlap, so a well-run contractor sequences them rather than queuing one after another. The submission normally includes the owner's DLD title deed, stamped structural and MEP drawings, a waterproofing specification and a site-logistics plan for the frond. Starting excavation before approvals can lead to stop-work notices and fines, and Nakheel may refuse the completion inspection.

How much does a new pool or a pool renovation cost on Palm Jumeirah?

A new residential pool in Dubai typically costs AED 145,000-400,000 in total, and new builds on Palm Jumeirah don't go below that floor. Within the range, a standard skimmer pool is AED 145,000-200,000 (6-10 weeks). A lap pool or oversized family pool is AED 200,000-280,000 (8-12 weeks). An infinity or overflow design with a balance tank is AED 280,000-400,000 (12-16 weeks). If you already have a pool, refurbishment is a separate scope: resurfacing, retiling and plant upgrades are indicatively AED 30,000-100,000 over 3-6 weeks. Three things move the price within a range. Prime communities like Palm Jumeirah price above mid-market areas. Finish level matters: luxury and ultra-luxury mosaic, natural stone and automation raise costs sharply compared with essential finishes. Larger villas with more bedrooms usually carry larger pools and decks. These are indicative figures and are confirmed only after an on-site survey.

What should you check before hiring a pool contractor on Palm Jumeirah?

Start with licensing. The contractor should hold a valid Dubai trade licence and be accepted to submit to Trakhees, and should be able to show recent Nakheel NOC approvals on Palm Jumeirah villas. Next, check the engineering. Ask how they will handle dewatering on reclaimed land, what waterproofing system they use, and whether the concrete and steel are specified for salt exposure. Ask where the plant room and balance tank will go, especially for infinity pools that face the Arabian Gulf. Then check the paperwork. You want a fixed-scope contract in AED, an approvals schedule that shows Trakhees, Nakheel and DEWA running in parallel, and a written warranty. First Unicorn Interiors offers a 3-year warranty. Finally, ask who coordinates landscaping, decking and lighting. On frond plots, splitting the pool and the landscaping between different companies often causes clashes at handover and failed completion inspections.

Choosing a swimming pool contractor in Dubai: permits, costs and timelines

A swimming pool contractor in Dubai has to do much more than dig and tile. A villa pool is a reinforced-concrete tank, and in many coastal communities it sits in saline ground with a high water table. The right contractor takes responsibility for the structural design, the waterproofing system, the filtration and MEP plant, and the permit file, from the first drawing through to handover. Which permits you need depends on where the villa is. In most freehold communities the drawings go to Dubai Municipality, which typically takes 10-15 working days for plan approval. You also need a master developer NOC from Emaar, Nakheel or Damac, which takes 10-20 working days. These approvals partly overlap, so the times don't simply add up. Palm Jumeirah, Jebel Ali and other Trakhees areas go through Trakhees instead, at 15-25 working days. Damac Hills 1 goes through the Dubai Development Authority and Damac Hills 2 through Dubai Municipality. If the pool plant needs a new or upgraded power supply, a DEWA connection or modification takes 7-14 working days. Have your DLD title deed ready, because the authority and developer applications need proof of ownership. Indicative budgets for a new residential pool are AED 145,000-400,000, with 6-16 weeks on site depending on size, overflow detailing and finish level. Before you shortlist anyone, ask who signs the structural drawings, which waterproofing membrane they use, and whether permit submissions are in their scope or left to you. First Unicorn Interiors handles all of these under one contract with a written warranty. All figures are indicative and confirmed only after an on-site survey.

How much does a swimming pool contractor in Dubai charge for a new villa pool?

Pricing follows the type of pool more than its area. A standard skimmer pool, around 8x4m, is indicatively AED 145,000-200,000 and takes 6-10 weeks. A lap pool or oversized family pool is AED 200,000-280,000 and takes 8-12 weeks, because of the longer shell, more reinforcement and bigger filtration plant. An overflow or infinity pool with a balance tank is AED 280,000-400,000 and takes 12-16 weeks. The balance tank, the precision edge and the extra pipework all add structural and MEP work. Three factors move a quote within these ranges. Premium communities cost more because of stricter developer rules and logistics. Higher-end finishes such as natural stone coping and glass mosaic push the price up, while essential finishes bring it down. Larger villas, with more bedrooms, usually get proportionally larger pools and decks. Landscaping is often done alongside the pool. A credible contractor will not give a fixed figure until they have surveyed the site, because soil conditions and access affect excavation and dewatering.

Which permits and NOCs does a pool contractor need in Dubai?

Every new pool needs authority approval and a community NOC. In Dubai Municipality areas, plan approval typically takes 10-15 working days. In Trakhees areas such as Palm Jumeirah and Jebel Ali, it takes 15-25 working days. Master developer NOCs from Emaar, Nakheel or Damac take 10-20 working days, depending on the community. DAMAC communities, including Damac Hills 1 & 2, Akoya, Lagoons and Islands, have their own process. You apply through the DAMAC Living app, and the community management NOC takes 5-15 working days. The admin fee is AED 1,050-5,000, and there is a refundable security deposit of AED 5,000-20,000. The deposit covers damage to common areas and work that runs past the approved period. Damac Hills 2 also needs a separate landscape NOC. Major extensions pay a GFA fee to DAMAC Properties before the final NOC is issued. Structural additions over 50% of BUA also need an Al Sa'fat 2.0 sustainability statement. Your contractor should prepare and track all of these submissions.

Should I renovate my existing pool or build a new one?

If the shell is structurally sound, refurbishment is usually the better value. Renovating an existing pool covers resurfacing, retiling and upgrading the plant, such as pumps, filters, lighting and automation. It costs an indicative AED 30,000-100,000 and takes 3-6 weeks. A new build starts at AED 145,000. Refurbishment usually needs less approval work than a new structure, but check your community's rules before work starts. Some developers still need notice or an NOC for contractor access and noise. A new build makes sense when the existing shell has persistent leaks, cracked structure or failed waterproofing. It also makes sense if you want to change the shape, add an infinity edge or move the pool. Ask your contractor for a leak test and a structural assessment before you commit either way. Retiling over a failed membrane only hides the problem until the next summer. A proper survey shows whether a refurbishment will last or whether rebuilding is the safer investment.

WhatsAppCall Now

Frequently Asked Questions About Swimming Pool Companies In Dubai

How much does swimming pool companies in dubai cost in Dubai?

Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.

How long does swimming pool companies in dubai take in Dubai?

Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.

Do I need permits or NOC for swimming pool companies in dubai?

External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.

Do you use subcontractors?

No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.

What warranty do you provide?

All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.

Which communities in Dubai do you cover?

We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.