This is the 2026 renovation cost reference for DAMAC Hills. Real AED price ranges by service, community-specific NOC requirements, and what's included in a fixed-price quote from First Unicorn Interiors. Full villa renovation in DAMAC Hills starts at AED 202,500; kitchen from AED 60,800; bathroom from AED 33,800; swimming pool from AED 195,800.

DAMAC Hills is a premium master-planned community with consistent villa typologies and well-defined NOC pathways. Renovation budgets typically run 30–60% above Dubai's baseline depending on scope. Below are 2026 starting prices for the most common renovation services across standard, premium and luxury tiers.
| Service | Standard | Premium | Luxury | Timeline |
|---|---|---|---|---|
| Bathroom | AED 33,800 | AED 60,800 | AED 128,300 | 2–3 weeks |
| Kitchen | AED 60,800 | AED 128,300 | AED 270,000 | 4–6 weeks |
| Swimming Pool | AED 195,800 | AED 337,500 | AED 540,000 | 4–8 weeks |
| Full Villa | AED 202,500 | AED 675,000 | AED 2,025,000 | 8–16 weeks |
| Villa Extension | AED 162,000 | AED 378,000 | AED 945,000 | 8–14 weeks + 2–4 weeks DM permit |
All prices are starting points; final fixed-price BOQ delivered after a free site visit. VAT 5% extra. 3-year craftsmanship warranty on all works.
Planning a damac hills? Fixed-price quote in 24 hours
Free site visit for projects over AED 10,000. 3-year warranty on all works.

See it before you build it
Free 3D design concept for your damac hills — based on 800+ completed Dubai projects.
Tell us about your DAMAC Hills property and we'll deliver an itemised BOQ with locked pricing and 3-year warranty terms.
Costs vary based on scope, materials, and finish level. Budget projects start from AED 25,000, mid-range from AED 60,000, and luxury from AED 150,000+. Contact us for a free, itemised quote specific to your property — we provide transparent pricing with no hidden costs.
Timeline depends on project scope. Single room: 2-4 weeks. Multiple rooms: 4-8 weeks. Full villa renovation: 8-16 weeks. We provide an exact timeline in our detailed quote, and our in-house team ensures on-time delivery.
External modifications require NOC from your master developer (Emaar, Nakheel, DAMAC, Meraas) and potentially Dubai Municipality approval. Internal cosmetic changes generally do not. We handle all permit processing as part of our service — learn more about NOC processing.
No. Every trade — tiling, plumbing, electrical, joinery, painting, glass and aluminium — is handled by our in-house team of 50+. This means better quality control, single point of accountability, and faster completion.
All works carry a 3-year craftsmanship warranty covering defects in workmanship and materials. This covers structural work, plumbing, electrical, tiling, joinery, and all finishes installed by our team.
We work across 46+ Dubai communities including Emirates Hills, Arabian Ranches, Palm Jumeirah, Dubai Hills, Jumeirah Golf Estates, DAMAC Hills, The Valley, MBR City, and many more.