Office fit-out reception and workspace planning
DESIGN & BUILD · UAE-WIDE

Fit-Out in Dubai & the UAE

First Unicorn delivers turnkey commercial and residential fit-out across the UAE — office, retail, restaurant, salon and warehouse — as a single design-and-build team: fixed per-scope price, every NOC handled in-house, on-time handover, 3-year warranty across 800+ projects.

Updated 2026-07-17 — Latest 2026 prices and availability

Quick Answer

First Unicorn delivers turnkey commercial and residential fit-out across the UAE — office, retail, restaurant, salon and warehouse — as a single design-and-build team: fixed per-scope price, every NOC handled in-house, on-time handover, 3-year warranty across 800+ projects.

VISUAL PROOF

Built, Designed and Delivered by One Team

Realistic visuals and project imagery help visitors understand the service before they ask for a quote. Every page now carries service-specific imagery instead of reading like a plain text article.

Office fit-out reception and workspace planningOffice fit-out reception and workspace planning
Restaurant and cafe fit-out with custom lightingRestaurant and cafe fit-out with custom lighting
Retail boutique fit-out with display lightingRetail boutique fit-out with display lighting
WHAT WE FIT OUT

Commercial & Residential Fit-Out

Residential interiors too — villa & home fit-out and interior design.

START

Fit Out With One Accountable Team

Fixed per-scope price, every NOC handled in-house, on-time handover, 3-year warranty across 800+ projects.

FAQ

Fit-Out in the UAE — Your Questions

How much does a fit-out cost in Dubai?

Roughly AED 80–400 per sqft depending on use and spec — offices AED 80–250/sqft, retail AED 150–400/sqft, restaurants driven by the kitchen, salons by wet-works. We quote fixed per scope after a free site visit.

Do you handle the fit-out NOCs and approvals?

Yes — building/mall fit-out NOC, Civil Defence, MEP, and the use-specific approvals (Foodwatch for F&B, DHA for clinics, signage for retail) are all secured in-house, in parallel.

How fast can you fit out and hand over?

From 2–4 weeks for a refresh to 8–16 weeks for a full commercial fit-out, including approvals. We commit to your handover/launch date in writing and run out-of-hours where needed.

Do you fit out across the UAE?

Yes — Dubai, Abu Dhabi, Sharjah and the northern emirates, with the correct authority path for each emirate and free zone.

Fit-Out Company Office Fit-Out Restaurant Fit-Out Commercial Fit-Out Warehouse Fit-Out Salon Fit-Out

First Unicorn Interiors offers turnkey salon fit out in Dubai starting from AED 25K for small salons, AED 45K for medium, and AED 150K+ for large luxury salons. Typical timeline: 4-6 weeks for small, 6-10 weeks for medium, 10-16 weeks for large. Includes design, permits, and 3-year warranty.

Key facts
  • Salon fit out from AED 25K (small) to AED 150K+ (large luxury)
  • Turnkey: design, permits, construction, all NOCs handled in-house
  • Timeline: 4-6 weeks small, 6-10 weeks medium, 10-16 weeks large
  • 3-year workmanship warranty on all fit-out work
  • Free site survey and line-by-line BOQ with fixed price

Quick answers

How much does a salon fit out cost in Dubai?
Salon fit out costs range from AED 25K for a small salon (1-2 stations) to AED 45K for medium (3-5 stations) and AED 150K+ for large luxury salons. Price includes design, permits, and construction.
How long does a salon fit out take?
Small salon fit out takes 4-6 weeks, medium 6-10 weeks, large luxury 10-16 weeks, depending on complexity and approvals.
Do I need permits / NOC for a salon fit out?
Yes, you need NOC from the landlord/master developer, DM approval for design, and DEWA connection. First Unicorn handles all permits in-house.
What is included in a turnkey salon fit out?
Turnkey includes design, MEP, flooring, walls, ceilings, salon stations, plumbing, electrical, HVAC, and all permits. You just bring your equipment.
Can you fit out a salon in a mall?
Yes, we have experience with mall salons. We coordinate with mall management for NOC and work during off-hours to minimize disruption.
What warranty do you offer?
We provide a 3-year workmanship warranty covering all fit-out work, including plumbing, electrical, and finishes.

Nursery Fit Out UAE: Complete Guide to Costs, Permits & Timelines

Nursery fit out UAE involves designing and constructing a child-safe, stimulating environment that complies with Dubai Municipality, KHDA, and civil defense regulations. For a typical 2,000–5,000 sq ft nursery, First Unicorn Interiors delivers turnkey fit-out starting from AED 180,000 (basic) to AED 450,000+ (premium with outdoor play areas). The process includes space planning, soft flooring, age-appropriate furniture, HVAC with fresh air intake, CCTV, fire alarms, and accessible toilets. Permits required: Dubai Municipality building permit, KHDA nursery license approval, Civil Defense fire safety certificate, and DEWA connection. Timeline: 8–12 weeks for design and approval, 12–16 weeks for construction. Popular communities: JLT, Dubai Marina, Arabian Ranches, The Springs, and Al Barsha. First Unicorn handles all NOCs with master developers (Emaar, Nakheel, etc.) and provides a 3-year warranty on workmanship. WhatsApp +971 58 565 8002 for a free site survey and fixed-price quote.

What is the average cost of nursery fit out in Dubai?

The cost varies by size and finishes. For a 2,000 sq ft nursery, expect AED 180,000–250,000 for basic fit-out (vinyl flooring, painted walls, standard furniture). Mid-range (3,000 sq ft) runs AED 250,000–350,000 with themed zones, soft play areas, and custom storage. Premium (5,000 sq ft) can exceed AED 450,000 including outdoor playground, sensory rooms, and high-end finishes. First Unicorn provides a line-by-line BOQ with no hidden fees. Additional costs: KHDA license (AED 10,000–15,000), Civil Defense approvals (AED 5,000–8,000), and DEWA connection (AED 2,000–5,000). Payment is milestone-based: 30% on signing, 40% on material delivery, 25% on completion, 5% after handover.

What permits are required for a nursery fit out in the UAE?

Key permits: (1) Dubai Municipality building permit – requires NOC from master developer (e.g., Emaar, Nakheel) and structural drawings. (2) KHDA (Knowledge and Human Development Authority) approval – for nursery license, including curriculum and staff qualifications. (3) Civil Defense fire safety certificate – for fire alarms, extinguishers, emergency exits, and sprinklers. (4) DEWA connection – for electricity and water. (5) Dubai Health Authority (DHA) approval – for hygiene and sanitation. First Unicorn handles all submissions and follow-ups. Typical approval time: 4–6 weeks. Failure to obtain permits can result in fines up to AED 50,000 and project delays.

How long does a nursery fit out take in Dubai?

A standard nursery fit out takes 12–16 weeks from design approval to handover. Phase 1 (design & approvals): 4–6 weeks – includes space planning, MEP drawings, and permit submissions. Phase 2 (demolition & MEP): 2–3 weeks – for existing shell modifications, plumbing, and electrical rough-ins. Phase 3 (finishing): 4–6 weeks – flooring, painting, ceiling, joinery, and installation of fixtures. Phase 4 (furniture & handover): 2–3 weeks – including soft furnishings, play equipment, and final inspections. First Unicorn guarantees on-time delivery with daily WhatsApp updates. For urgent projects, a 10-week express program is available with overtime shifts.