FUI handles survey, drawings, approval coordination, itemized BOQ and site execution with one accountable team.
Cost and Scope
Kitchen cost is driven by cabinet length, appliance specification, countertop material, plumbing relocation, electrical load and whether a wall opening needs approval.
FUI surveys the existing kitchen, checks services and produces an itemized BOQ before fabrication so the finished kitchen matches the drawings and budget.
| Package | Included scope | Typical cost |
|---|---|---|
| Essential kitchen | Cabinet repaint or replacement fronts, countertop, sink, mixer, lighting and backsplash | AED 65,000-95,000 |
| Full villa kitchen | New carcasses, island, stone/quartz top, appliances, MEP relocation and lighting | AED 95,000-160,000 |
| Premium kitchen | Bespoke joinery, feature stone, concealed appliances, smart lighting and pantry integration | AED 160,000-240,000+ |
Approval Route
Simple cabinet replacement may not need authority approval, but wall removal, drainage relocation, electrical upgrades and facade/external works can trigger DAMAC and municipality requirements.
Useful Next Step
- Measure cabinet runs and appliance list
- Check plumbing, gas and electrical loads
- Freeze material samples before fabrication
FAQs
What is the average DAMAC Hills kitchen renovation cost?
A full villa kitchen usually lands between AED 95,000 and AED 160,000 depending on joinery, appliances and MEP relocation.
Can a kitchen wall be removed?
Sometimes, but structural and MEP checks are required before approval and demolition.
How long does fabrication take?
Typical custom kitchen fabrication and installation takes 4-9 weeks after drawings and materials are approved.
