Palm Jumeirah

Master Marble Bathroom — Palm Jumeirah

Bathrooms · 80 sqft · 12 days
×
HomePortfolioBathrooms › Master Marble Bathroom — Palm Jumeirah
PremiumMaster
12 daysDelivered
10-YearWaterproofing
5 StarRating

The Challenge

Bathroom renovation in Palm Jumeirah. Outdated fixtures, poor waterproofing, inefficient layout.

Our Solution

Complete strip-out, new waterproofing (10-year membrane), master marble bathroom design, premium sanitaryware, LED mirror lighting, heated towel rails.

Planning a bathroom palm jumeirah? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

The Results

Zero leaks. Premium finish. Client rates 5 stars.

“Our master marble bathroom is now a spa experience. The waterproofing gives us total peace of mind.”
— Client · Palm Jumeirah
LocationPalm Jumeirah
CategoryBathrooms
Area80 sqft
Duration12 days
InvestmentAED 45K
I Want This — WhatsApp Free Site Visit →
At a Glance

Master marble bathroom renovation in Palm Jumeirah, Dubai, costs AED 45K for 80 sqft, takes 12 days, and includes 10-year waterproofing with premium marble design and sanitaryware by First Unicorn Interiors. This project addressed outdated fixtures and poor waterproofing, delivering zero leaks and a 5-star client rating.

Key facts
  • 80 sqft master bathroom renovated in 12 days for AED 45K in Palm Jumeirah
  • Complete strip-out and 10-year waterproofing membrane installed
  • Premium marble design with LED mirror lighting and heated towel rails
  • Zero leaks achieved, client rated 5 stars for spa-like finish
  • Over 800 projects completed by First Unicorn Interiors with 3-year warranty

Quick answers

How much does a master marble bathroom renovation cost in Dubai?
A standard 80 sqft master marble bathroom renovation in Palm Jumeirah costs AED 45K, including premium sanitaryware and waterproofing. For larger 120 sqft designs, expect AED 65K-75K. Basic updates start at AED 25K for essential fixtures and tiling.
How long does a bathroom renovation take in Dubai?
A full master marble bathroom renovation takes 12 days for 80 sqft scopes. Medium projects with layout changes require 18-21 days. Simple fixture updates finish in 7-10 days, depending on in-house team efficiency.
What permits are needed for bathroom renovation in Dubai?
For structural changes in Palm Jumeirah villas, obtain a No Objection Certificate (NOC) from Nakheel as the master developer. Dubai Municipality (DM) issues building permits for plumbing and electrical work. DEWA approval is required for any water or power connections.
What features are included in a Palm Jumeirah master bathroom renovation?
Projects include complete strip-out, 10-year waterproofing membrane, premium marble finishes, LED mirror lighting, and heated towel rails. Area covered is typically 80 sqft, with zero-leak results and 5-star client satisfaction.
How does First Unicorn Interiors ensure quality in bathroom projects?
With over 800 projects completed, they use an in-house team for 12-day deliveries and provide a 3-year warranty. Investments start at AED 45K for premium results, backed by client testimonials praising spa-like experiences.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.