Al Barari

Natural Stone Pool

Pools · 500 sqft · 40 days
×
HomePortfolioPools › Natural Stone Pool
500 sqftPool Area
40 daysDelivered
DMApproved
5 StarRating

The Challenge

Pool renovation in Al Barari. Client wanted premium finish with safety features.

Our Solution

Complete renovation — excavation, structural, tiling, filtration, lighting, heating, safety barriers, landscaping.

Planning a natural pool ab? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

The Results

Stunning pool delivered on time. All NAKHEEL/DM safety requirements met. Client satisfaction: 5 stars.

“The pool is the jewel of our property now. Professional team, beautiful result.”
— Client · Al Barari
LocationAl Barari
CategoryPools
Area500 sqft
Duration40 days
InvestmentAED 350K
I Want This — WhatsApp Free Site Visit →
At a Glance

Natural stone pool renovation in Dubai costs AED 350K for 500 sqft in Al Barari, taking 40 days with DM approval and 5-star client rating. First Unicorn Interiors delivers premium finishes including excavation, tiling, filtration, lighting, heating, safety barriers, and landscaping. Includes 3-year warranty on all work.

Key facts
  • 500 sqft natural stone pool renovated in Al Barari for AED 350K investment.
  • 40-day timeline from excavation to full landscaping and safety features.
  • Meets Dubai Municipality (DM) and Nakheel safety requirements.
  • 5-star client satisfaction with premium tiling and filtration systems.
  • Delivered by First Unicorn Interiors, experts in 800+ Dubai projects.

Quick answers

How much does a natural stone pool renovation cost in Dubai?
A 500 sqft natural stone pool renovation in Al Barari costs AED 350K, covering excavation, structural work, tiling, filtration, lighting, heating, and safety barriers. Larger 800 sqft pools range from AED 450K to AED 550K. First Unicorn Interiors provides transparent quotes with 3-year warranty included.
How long does a natural stone pool renovation take in Dubai?
A standard 500 sqft natural stone pool renovation takes 40 days, including permits and full installation. For basic refreshes up to 300 sqft, expect 25-30 days. Complex projects over 700 sqft require 50-60 days with custom features like heating and landscaping.
What permits are needed for pool renovation in Dubai?
Pool renovations require No Objection Certificate (NOC) from Dubai Municipality (DM) for structural changes and safety compliance. Nakheel issues approvals for Al Barari developments. DEWA NOC is needed for electrical and filtration systems. First Unicorn Interiors handles all submissions.
What safety features are included in natural stone pool renovations?
Safety features include DM-approved barriers, non-slip tiling, and filtration systems preventing contamination. Projects incorporate child-proof fencing and lighting for 24/7 visibility. Over 95% of First Unicorn Interiors' pools achieve full safety certification on first inspection.
What materials are used in natural stone pool projects?
Natural stone pools use premium limestone or travertine tiling for durability in Dubai's climate, covering 500 sqft areas. Filtration systems handle 50,000 liters capacity. All materials meet DM standards, with 800+ projects completed using in-house sourced granite and marble accents.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.