Dubai Hills

Rooftop Plunge Pool

Pools · 200 sqft · 30 days
×
HomePortfolioPools › Rooftop Plunge Pool
200 sqftPool Area
30 daysDelivered
DMApproved
5 StarRating

The Challenge

Pool construction in Dubai Hills. Client wanted premium finish with safety features.

Our Solution

New construction — excavation, structural, tiling, filtration, lighting, heating, safety barriers, landscaping.

Planning a rooftop pool dh? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

The Results

Stunning pool delivered on time. All NAKHEEL/DM safety requirements met. Client satisfaction: 5 stars.

“The pool is the jewel of our property now. Professional team, beautiful result.”
— Client · Dubai Hills
LocationDubai Hills
CategoryPools
Area200 sqft
Duration30 days
InvestmentAED 220K
I Want This — WhatsApp Free Site Visit →
At a Glance

Rooftop plunge pool construction in Dubai Hills by First Unicorn Interiors costs AED 220K for 200 sqft, takes 30 days, and includes excavation, structural work, tiling, filtration, lighting, heating, safety barriers, and landscaping to meet Nakheel and DM requirements.

Key facts
  • 200 sqft rooftop plunge pool in Dubai Hills delivered in 30 days for AED 220K.
  • New construction covers excavation, structural reinforcement, premium tiling, and advanced filtration systems.
  • Meets all Nakheel and Dubai Municipality (DM) safety standards with barriers and approvals.
  • Client received 5-star rating; includes heating, lighting, and integrated landscaping.
  • Similar projects: Palm Jumeirah infinity edge AED 250K+, Emirates Hills lap pool AED 180K.

Quick answers

How much does a rooftop plunge pool cost in Dubai Hills?
A 200 sqft rooftop plunge pool costs AED 220K including all construction and features. Smaller 150 sqft options start at AED 180K with basic tiling and filtration. Larger 250 sqft designs with infinity edges reach AED 280K incorporating heating and premium materials.
How long does it take to build a rooftop plunge pool in Dubai?
A standard 200 sqft rooftop plunge pool takes 30 days from excavation to completion. Basic setups without heating finish in 20 days. Complex designs with structural reinforcements and landscaping require 40 days.
What permits are needed for rooftop pool construction in Dubai Hills?
Dubai Municipality (DM) issues the building permit for structural safety. Nakheel, as the master developer, provides NOC for community compliance. DEWA approves electrical and plumbing connections for filtration and lighting systems.
What safety features are included in Dubai rooftop pools?
Safety barriers and non-slip tiling are mandatory, meeting DM standards. Filtration systems ensure water quality, with 100% compliance to Nakheel guidelines. Lighting and heating add 20% to safety in low-visibility conditions.
What is the pool area capacity for a Dubai Hills rooftop plunge pool?
The featured 200 sqft pool accommodates 4-6 swimmers comfortably. Depth averages 1.2 meters for plunge style. Capacity increases by 50% for family-oriented designs up to 300 sqft.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.