DEWA-approved solar panel installation across Dubai — villa rooftop, commercial, hybrid + battery. AED 15,000–45,000 for villas. Save 60-90% on DEWA bills. Free ROI study shows exact payback. 25-year panel warranty. 800+ projects delivered.
Based on 800+ projects, here's what goes wrong with solar — and how we prevent it.
Many contractors sell the biggest system your roof fits, not the one that matches your DEWA bill. Result: excess kWh you can't use or sell profitably. We size to your actual consumption + DEWA slab tariff structure for maximum ROI.
Roof penetrations for solar mounts cause leaks within 2-3 years. We're a full renovation company — waterproofing is our core trade. Every mounting point is sealed with 10-year waterproof membrane, not just silicone.
Contractors who don't know DEWA's Shams Dubai process cause 3-6 month delays. We handle the full process — application, single-line diagram, commissioning, meter installation — in 4-6 weeks.
Dubai dust reduces panel output 15-20% without regular cleaning. Most contractors install and disappear. We include 2-year AMC with quarterly cleaning + monitoring in every package.
Same project, two very different outcomes. Here's exactly how our service compares to the industry standard.
| What You Get | First Unicorn Solar | Typical Dubai Provider |
|---|---|---|
| Waterproofing Expertise | ✓ Core trade — 10-year membrane under every mount | ✗ Silicone sealant, hope for the best |
| DEWA Shams Process | ✓ 4-6 week approval track record | ✗ 3-6 months typical |
| Roof Assessment | ✓ Full structural + waterproofing survey before design | ✗ Visual inspection only |
| System Sizing | ✓ Sized to your DEWA bill slabs for max ROI | ✗ Biggest system your roof fits |
| Post-Install Maintenance | ✓ 2-year AMC included: quarterly cleaning + monitoring | ✗ Optional AMC, usually extra cost |
| Electrical Integration | ✓ In-house electricians, DB upgrade included | ✗ Electrical work subcontracted |
| Warranty | ✓ 25-year panels + 10-year inverter + 3-year workmanship | ✗ 25-year panels, 5-year inverter, 1-year labour |
| Renovation Integration | ✓ Solar + villa reno together = one mobilisation cost | ✗ Solar only — separate contractor for anything else |
| Financing | ✓ 0% EMI 12 months or bank finance up to 24 months | ✗ Limited or no financing |
| Monitoring | ✓ App + web dashboard + WhatsApp alerts | ✗ Basic inverter app |
Not marketing copy — operational advantages from a renovation company doing solar.
Planning a villa renovation? Add solar at zero extra mobilisation cost. Roof work, electrical, waterproofing — all our in-house trades. One PM, one schedule, one warranty.
Every solar mount penetrates your roof. We're waterproofing specialists — 10-year membrane under every mount point. Solar-only companies use silicone and hope for the best.
We model your DEWA bill slab-by-slab, size the system to maximise savings at each tariff tier, and show you exact payback — not generic estimates. Free ROI study before you commit.
We handle the entire DEWA Shams Dubai process — application, single-line diagram, site inspection, meter installation, commissioning. 4-6 week track record.
Our in-house electricians upgrade your DB, install isolators, connect to grid — no subcontractors. EV charger integration available for future-proofing.
Every system designed battery-ready. Add storage later without rework. Hybrid inverters standard on Premium+ packages.
App + web dashboard showing real-time generation, consumption, savings. WhatsApp alerts for any system issues. Quarterly performance reports.
25-year panel performance warranty. 10-year inverter warranty. 3-year workmanship warranty. 2-year AMC included. Industry-leading coverage.
Three packages. Fixed price. No hidden costs. DEWA-approved Tier 1 panels + inverters included.
A proven 6-step process. We handle everything — you just watch your DEWA bill shrink.
Site visit, roof survey (structural, waterproofing, shading), DEWA bill analysis, consumption pattern review. Detailed ROI model showing exact savings per month and payback period. No obligation.
Custom system design — panel layout, inverter sizing, wiring diagram, single-line diagram. Proposal with exact pricing, expected generation, monthly savings, and payback timeline.
Full DEWA application: Shams Dubai registration, single-line diagram submission, site inspection coordination. We handle all paperwork — you just sign.
Waterproof membrane at all mount points, racking installation, panel mounting, inverter + DB connection, wiring, isolators. In-house electricians — no subcontractors.
DEWA site inspection, meter installation, grid connection, system commissioning. Full testing of generation, safety systems, monitoring app setup.
System live. App monitoring active. First quarterly cleaning scheduled. WhatsApp group for alerts. Quarterly performance reports. 25+10+3 year warranty documentation.
Every trade needed for solar — done by our team. No subcontractors.
Application, inspection, meter, commissioning
10-year membrane at every mount point
Roof load capacity analysis before design
DB upgrade, isolators, grid connection
Custom layout, ROI modelling, slab optimisation
Tier 1 mono PERC / TOPCon panels
String, hybrid, micro — battery ready
App, web dashboard, WhatsApp alerts
Solar-optimised EV charging circuits
Quarterly cleaning, inspection, reporting
DM/community NOC if structural changes needed
Add solar to any renovation project
Recent solar projects — villas, commercial, hybrid systems. All DEWA Shams Dubai approved.

10 kW system on 5-bedroom villa. 18 panels, hybrid inverter, battery-ready. Monthly DEWA bill went from AED 2,800 to AED 280. 4.5 year payback.

22 kW system on 8-bedroom mansion. 38 panels, dual hybrid inverters, 10kWh battery. DEWA bill: AED 6.50/month. Full roof waterproofing included.

7 kW system on 4-bedroom villa. 12 panels, string inverter. DEWA bill reduced 65%. Payback in 4 years. EV charger added 6 months later.

85 kW commercial system on logistics warehouse. 148 panels, dual string inverters. Annual savings AED 120,000. ROI in 3.5 years.

12 kW hybrid system with 15kWh battery. 20 panels. Pool pump + AC running on solar during peak hours. DEWA bill: AED 45/month.

Full villa renovation + 15 kW solar added during roof works. Zero extra mobilisation cost. Single warranty covering all trades including solar.
Get an instant estimate based on your project specifics. For exact quote, request a free consultation — we respond in 60 minutes.
Inputs below give a rough estimate. WhatsApp us for exact fixed-price quote.
DEWA-approved system · Tier 1 panels · 2-year AMC included
4.9/5 rating from 127 Google reviews. Real savings from real installations.
"DEWA bill was AED 3,200/month. After First Unicorn installed 10kW, it's been AED 180-320 depending on season. The ROI study they showed me before installation was accurate to within 5%. Payback on track for 4.5 years."
"What sold me was the waterproofing. Previous solar company left my roof leaking after 2 years. First Unicorn removed the old system, re-waterproofed properly, and reinstalled with their own panels. Zero leaks since."
"Added solar during our villa renovation — saved the entire mobilisation cost vs doing it separately. One team, one PM. DEWA bill is now AED 6.50. My neighbours are asking for the same company."
Transparent track record. Updated quarterly. No marketing fluff — just numbers.
The questions DEWA doesn't answer clearly — we do. WhatsApp us — answered within 60 minutes.
Villa solar systems typically cost AED 15,000-45,000 depending on size. 5 kW (3-4 BR villa): AED 15,000-22,000. 10 kW (5-6 BR): AED 25,000-38,000. 15+ kW (large villa): AED 38,000-65,000+. Price includes Tier 1 panels, inverter, installation, DEWA approval, and 2-year AMC.
Most villa owners save 60-90% on electricity bills. A 10 kW system on a villa with AED 2,500/month DEWA bill typically reduces it to AED 250-400/month. Exact savings depend on your consumption pattern, DEWA slab tariff, and system size. Our free ROI study shows exact projections.
Shams Dubai is DEWA's program allowing you to connect solar panels to the grid. Excess electricity you generate goes back to DEWA — you get credit on your next bill (net metering). No battery needed for daytime savings. We handle the entire Shams Dubai application process.
From signing to system live: 4-6 weeks total. Installation itself takes 2-3 days on-site. The rest is DEWA approval process, which we manage entirely. Much faster than the 3-6 months typical with solar-only companies.
Typical villa payback: 4-7 years depending on system size and consumption. After payback, you enjoy 18-21 years of near-free electricity (panels last 25-30 years). Commercial systems often pay back in 3-5 years due to higher DEWA tariffs.
Not for most villa owners. DEWA net metering means you use the grid as your 'battery' — excess goes to DEWA, you pull back at night. Batteries (AED 8,000-25,000) make sense for: backup during outages, off-grid areas, or maximising self-consumption. We design every system battery-ready so you can add later.
Not with proper installation. The #1 cause of solar-related roof damage is poor waterproofing at mounting points. We install a 10-year waterproof membrane under every mount — we're a renovation company, waterproofing is our core trade. Solar-only companies use silicone sealant.
Yes — and you should. Adding solar during renovation saves the entire mobilisation cost (AED 3,000-5,000). Roof waterproofing done once, electrical work integrated, one PM managing everything. This is our unique advantage — we're the only company in Dubai that does both.
Panels: Tier 1 manufacturers — Longi, JA Solar, Canadian Solar, Jinko. Mono PERC or TOPCon technology for UAE heat performance. Inverters: Huawei, SolarEdge, Fronius (string); Huawei, GoodWe (hybrid). All equipment comes with manufacturer warranty.
Yes — 0% EMI up to 12 months (in-house). Bank financing up to 24 months with competitive rates. PPA (Power Purchase Agreement) available for commercial — zero upfront cost, pay only for electricity generated.
Dubai dust reduces output 15-20% without cleaning. Our 2-year AMC (included) covers quarterly professional cleaning, system inspection, monitoring review, performance reporting. After 2 years, optional AMC at AED 1,500-3,000/year depending on system size.
Absolutely. We pre-wire for EV chargers in Premium+ packages and can install a solar-optimised EV charging circuit. Charge your car from sunshine — typical EV uses 8-12 kWh/day, well within a 10 kW system's capacity.
Free site visit + DEWA bill analysis + exact payback calculation. No obligation. 800+ solar projects delivered. 25-year warranty.