Cost and Scope
DAMAC communities can look straightforward until a renovation touches facade, structure, drainage, pool, pergola, MEP load or boundary conditions. Each scope needs a clear drawing pack before contractors mobilize.
FUI prepares the approval pack and build scope together, so your NOC submission matches the actual site execution plan.
| Package | Included scope | Typical cost |
|---|---|---|
| Minor renovation NOC | Method statement, contractor documents, basic drawings and community submission | AED 4,000-7,500 |
| Villa alteration pack | Architectural, structural and MEP coordination for kitchen, bathroom, facade or layout changes | AED 7,500-14,000 |
| Extension/pool/landscape pack | Full drawing set, calculations, authority coordination and resubmission support | AED 14,000-18,000+ |
What Is a DAMAC NOC and When Do You Need One?
A DAMAC NOC is written consent from DAMAC community management to carry out work on your villa. It is not the same as a building permit — it is the developer's approval that your proposed work respects the community's rules, and it must be in hand before any authority permit is issued and before a contractor mobilises on site.
You need one for structural changes, villa extensions, facade alterations, boundary-wall work, swimming pools, pergolas and shade structures, and any change to drainage or external MEP routing. Purely internal cosmetic work — painting, flooring, replacing joinery in the existing footprint — usually does not, but the community reserves the right to inspect.
Work started without an NOC risks a stop-work notice, forfeiture of your security deposit of AED 5,000–AED 20,000, and a legal notice from DAMAC community management. Reinstatement to the original condition is at the owner's cost.
DAMAC Communities Covered
The same NOC process applies across DAMAC's Dubai portfolio, with community-specific conditions layered on top:
- DAMAC Hills — villas and townhouses around the Trump International golf course
- DAMAC Hills 2 (formerly Akoya Oxygen) — additionally requires a separate landscape NOC for any change to soft landscaping
- DAMAC Lagoons — Mediterranean-themed clusters, with water-feature proximity rules
- DAMAC Islands — the newest phase, where handover-period restrictions still apply in several clusters
DAMAC Hills 1 and Hills 2 Go to Different Authorities
This is the single most common and most expensive mistake owners make, because the two communities sit under different regulators despite sharing a developer and a name.
- DAMAC Hills 1 falls under the Dubai Development Authority (DDA). After the DAMAC NOC, the building permit application goes to DDA.
- DAMAC Hills 2 follows Dubai Municipality (DM) protocols. The same drawing pack submitted to the wrong authority is returned unassessed.
The practical consequence is that drawing standards, submission portals and review durations differ between two communities a few kilometres apart. Dubai Municipality plan approval runs 10–15 working days; DDA review timelines vary with submission quality. Confirming which regulator applies before drawings are produced is the cheapest hour you will spend on the project.
How to Apply for a DAMAC Renovation NOC
DAMAC has moved community approvals onto the DAMAC Living app, which has shortened what used to be a counter-based process:
- Raise the request in the DAMAC Living app against your unit, selecting the modification category.
- Upload the drawing pack — layouts, elevations and, for structural scope, engineering calculations.
- Submit contractor credentials — a valid trade licence covering the work, plus insurance.
- Pay the administration fee and lodge the refundable security deposit.
- Community review — expect 5–15 working days for a complete submission; incomplete packs restart the clock.
- Receive the NOC, then proceed to DDA or Dubai Municipality depending on your community.
For major extensions, a Gross Floor Area (GFA) fee is payable to DAMAC Properties before the final NOC is released — budget for it early, because it is assessed on the added area and is not part of the administration fee.
Required Documents
- Title deed or Oqood, and Emirates ID of the registered owner
- Existing and proposed layout drawings, with elevations for any external change
- Structural calculations for extensions, roof works or load-bearing alterations
- MEP drawings where drainage, DEWA load or AC routing changes
- Contractor trade licence and public liability insurance
- Method statement and project programme
- Al Sa'fat 2.0 sustainability statement for structural additions exceeding 50% of built-up area
- Landscape drawings — a separate NOC in DAMAC Hills 2
DAMAC NOC Fees and Processing Time
| Item | Typical range | Notes |
|---|---|---|
| DAMAC administration fee | AED 1,050–AED 5,000 | Non-refundable; varies with scope |
| Security deposit | AED 5,000–AED 20,000 | Refundable against common-area damage and overruns |
| Community review | 5–15 working days | Complete submissions only |
| Dubai Municipality permit | 10–15 working days | DAMAC Hills 2 route |
| DEWA connection or modification | 7–14 working days | Where load changes |
| GFA fee | Assessed on added area | Major extensions, before final NOC |
These stages overlap only partially. A structural extension realistically spends six to ten weeks in approvals before construction can begin, which is why approval time belongs in the project programme rather than being treated as a preliminary.
Common Restrictions in DAMAC Communities
- Facade uniformity — external colour, cladding and window frames must match the approved community palette
- Boundary walls — height and finish are fixed; raising a wall for privacy needs explicit consent
- Pools and water features — setback from boundaries, drainage routing and equipment noise are all assessed
- Landscape — in DAMAC Hills 2, soft-landscaping change is a separate NOC, not part of the main approval
- Working hours — community-enforced, and stricter than Dubai Municipality's general limits during holidays
- Handover periods — newly handed-over clusters often restrict modification entirely for a defined window
Tips for Faster DAMAC NOC Approval
- Confirm the regulator first. DDA for Hills 1, Dubai Municipality for Hills 2 — this decides the drawing standard before anything is drawn.
- Submit complete. The commonest cause of a three-week approval becoming eight is a resubmission for a missing calculation or an expired trade licence.
- Raise the landscape NOC in parallel in Hills 2 rather than after the main approval.
- Budget the GFA fee up front on extensions; it gates the final NOC, not the first one.
- Keep the deposit intact by agreeing access routes and common-area protection with the community before mobilisation.
Approvals
DAMAC community NOC plus Dubai Municipality, Trakhees, DEWA or DCD as the project scope requires.
How FUI Prices It
We survey the property, confirm access and authority requirements, prepare an itemized BOQ, then lock the scope before work starts. Authority fees are paid transparently and are never hidden inside the construction margin.
