Pool — First Unicorn Interiors, Dubai

Swimming Pool Construction in The Lakes

Build your dream pool in The Lakes. From plunge pools to infinity edges — we've built 125+ pools across Dubai's villa communities. Fixed pricing, all approvals handled, 3-year warranty.

Plunge Pool

From AED 50,000

3x4m, ideal for compact plots. Includes filtration, tiling, lighting and deck finishing.

Family Pool

From AED 72,000

5x10m, shallow + deep end. Full filtration, LED lighting, mosaic tiling, deck.

Infinity Pool

From AED 105,000

Vanishing edge, premium mosaic, smart controls, heating ready. Statement feature.

Polr — First Unicorn Interiors project, Dubai

Pool Construction Specialists in The Lakes

We have extensive experience building swimming pools in The Lakes and understand the specific requirements of this community — from plot layouts and soil conditions to community management approvals and setback requirements.

Every pool project in The Lakes includes: structural engineering drawings, community NOC application and follow-up, excavation, reinforced concrete shell, waterproofing, premium tiling, filtration and pump installation, LED lighting, deck finishing, and full commissioning with water treatment setup.

What's Included

Our fixed-price pool construction packages include everything: design consultation, 3D visualisation, structural drawings, all approvals and NOCs, excavation and disposal, reinforced concrete pool shell, internal waterproofing, premium pool tiling (mosaic or porcelain), filtration system and pump, LED underwater and perimeter lighting, pool deck tiling or natural stone, safety fence or glass balustrade (if required), commissioning and water treatment, and a 3-year workmanship warranty.

Planning a renovation in The Lakes? Fixed-price quote in 24 hours

Free site visit for projects over AED 10,000. 3-year warranty on all works.

Pool — First Unicorn Interiors project, Dubai

Pool Types We Build

We build every type of residential pool: plunge pools for smaller plots, family pools with shallow and deep ends, lap pools for fitness, infinity and vanishing-edge pools, natural pools with stone features, and custom freeform designs. We also handle pool renovations — retiling, equipment upgrades, deck resurfacing, and conversions from chlorine to salt water systems.

The Process

Step 1: Free site visit in The Lakes — we assess your plot, discuss your vision, and recommend the best pool type and position. Step 2: Design and quotation — 3D visualisation and fixed-price proposal. Step 3: Approvals — we handle all community NOC submissions. Step 4: Construction — 8-12 weeks from excavation to handover. Step 5: Commissioning and handover — water treatment setup, equipment training, warranty certificate.

Frequently Asked Questions

How much does a swimming pool cost in The Lakes?

Plunge pools start from AED 50,000, family pools from AED 72,000, and infinity pools from AED 105,000. Final pricing depends on pool size, depth, materials, and features like heating or automation. We provide a fixed-price quote after a free site visit.

How long does pool construction take in The Lakes?

Typically 8-12 weeks from excavation to handover. This includes structural work, plumbing, tiling, equipment installation and commissioning. Approval timelines are additional (2-4 weeks) and we handle the entire process.

Do I need approval to build a pool in The Lakes?

Yes. Most communities require a No Objection Certificate (NOC) before pool construction begins. We prepare all documentation — structural drawings, plot plans, contractor credentials — and manage the entire approval process.

What type of pool is best for villas in The Lakes?

This depends on your plot size, budget, and how you'll use the pool. For compact plots, a plunge pool (3x4m) is perfect. For families, a 5x10m pool with a shallow lounging area works best. We recommend the ideal option during our free site visit.

WhatsApp Us — Free Pool Consultation in The Lakes →
FIRST UNICORN INTERIORS
Design. Build. Deliver. Done.
Interior Design · Fit-outs · Renovations · Construction
At a Glance

Swimming pool construction in The Lakes, Dubai, by First Unicorn Interiors starts at AED 145,000 for a standard 6x3m pool, including design, permits, and installation. Projects typically take 8-12 weeks with in-house engineering and 3-year warranty. Costs cover excavation, reinforced concrete, tiling, and DEWA approvals, with full villa pool extensions from AED 120,000.

Key facts
  • Swimming pool installation in The Lakes starts at AED 145,000 for 18m² pools, including all materials and labor.
  • Timeline: 8 weeks for basic pools, 12 weeks for custom designs with 3D visualization.
  • Dubai Municipality NOC required for pool construction; DEWA approval for electrical and plumbing integration.
  • First Unicorn Interiors offers 3-year warranty on structural and waterproofing works.
  • Over 800 projects completed, with in-house team handling permits and fitouts.

Quick answers

How much does swimming pool construction cost in The Lakes, Dubai?
Basic 6x3m swimming pool construction costs AED 145,000 to AED 200,000, including excavation, reinforced concrete shell, tiling, and filtration system. Custom designs with lighting and heating add AED 50,000 to AED 100,000. First Unicorn Interiors provides transparent quotes starting from AED 145,000 for standard installations.
How long does it take to build a swimming pool in The Lakes?
Basic pool construction takes 8 weeks, covering design, permits, and installation. Mid-tier projects with custom features require 10 weeks. Complex villa extensions with pool integration last 12 weeks, including testing and handover.
What permits and NOCs are needed for swimming pool construction in Dubai?
Dubai Municipality (DM) issues the Building Permit and NOC for structural safety and zoning compliance in The Lakes. DEWA approval is required for electrical wiring and plumbing connections. Emaar, as master developer, mandates additional site plan approval before DM submission.
What sizes and types of swimming pools are suitable for The Lakes villas?
Standard infinity-edge pools measure 6x3m at AED 145,000, fitting most villa gardens. Larger 8x4m family pools cost AED 180,000 and accommodate 6-8 swimmers. Plunge pools under 4x2m start at AED 90,000 for compact outdoor spaces.
What maintenance costs apply after swimming pool installation?
Annual maintenance contracts start at AED 5,000, covering filter cleaning and chemical balancing. Quarterly servicing costs AED 1,500 per visit for pH testing and pump checks. First Unicorn offers AMC packages from AED 199 monthly for basic pool care.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.

Swimming Pool Construction in other Dubai communities

Swimming pool contractor the lakes: costs, permits, and timelines

Swimming pool contractor the lakes: if you're searching for a swimming pool contractor in The Lakes, Dubai, you're likely a homeowner or villa owner planning to install or renovate a private pool. This guide answers your questions about costs, permits, and timelines, specifically for The Lakes community. As a Dubai-based renovation contractor, we understand the unique requirements of building pools in villa communities like The Lakes, managed by Emaar. For a new residential pool, costs typically range from AED 145,000 to AED 400,000, depending on size, finish, and complexity. The process involves obtaining approvals from Dubai Municipality and the master developer (Emaar), which can take 10-20 working days for the NOC. The total timeline for a new pool is 6-16 weeks, including construction. For existing pools, renovation costs range from AED 30,000 to AED 100,000, with a shorter 3-6 week timeline. Always remember that final costs are confirmed only after an on-site survey, as factors like soil conditions and access can affect the price. Our team at First Unicorn Interiors handles everything from design to approvals, ensuring a smooth process.

What permits are required for building a swimming pool in The Lakes?

Building a swimming pool in The Lakes requires approvals from Dubai Municipality and the master developer, Emaar. The Dubai Municipality approval for building/fit-out plans takes 10-15 working days. Additionally, you'll need an NOC from Emaar, which typically takes 10-20 working days. If your pool involves structural changes, you may also need approval from the Dubai Development Authority (DDA) or other authorities depending on the area. It's essential to work with a contractor who handles these permits, as missing approvals can lead to fines or delays. Our team at First Unicorn Interiors manages all necessary paperwork, including NOC processing and municipality approvals, to ensure your project complies with local regulations.

How much does a swimming pool cost in The Lakes?

The cost of a new swimming pool in The Lakes ranges from AED 145,000 to AED 400,000, depending on the type and finish. For a standard 8x4m pool, expect to pay AED 145,000-200,000. A larger lap pool or oversized family pool costs AED 200,000-280,000. For an infinity or luxury pool with a balance tank, the cost is AED 280,000-400,000. These figures are indicative and can vary based on finish level (essential, premium, luxury, ultra) and size. For example, a luxury finish can increase costs by up to 45%, while an essential finish reduces them by 25%. Remember, these are indicative ranges; a final quote is provided after an on-site survey. If you're renovating an existing pool, costs are lower: AED 30,000-100,000, depending on the scope.

How long does it take to build a swimming pool in The Lakes?

The timeline for building a swimming pool in The Lakes is 6-16 weeks, depending on the complexity. A standard pool takes 6-10 weeks, a lap or large pool 8-12 weeks, and an infinity or luxury pool 12-16 weeks. This includes construction, but not the approval process, which can add 10-20 working days for the Emaar NOC and 10-15 working days for Dubai Municipality approval. Some approvals run in parallel, so the total time from start to finish is typically 8-20 weeks. For renovations, the timeline is shorter: 3-6 weeks. Factors like weather, material availability, and design changes can affect the schedule. Our team ensures efficient project management to minimize delays and keep you informed throughout the process.