Swimming Pool Construction in The Heights

Build your dream pool in The Heights. From plunge pools to infinity edges — we've built 125+ pools across Dubai's villa communities. Fixed pricing, all approvals handled, 3-year warranty.

Plunge Pool

From AED 50,000

3x4m, ideal for compact plots. Includes filtration, tiling, lighting and deck finishing.

Family Pool

From AED 72,000

5x10m, shallow + deep end. Full filtration, LED lighting, mosaic tiling, deck.

Infinity Pool

From AED 105,000

Vanishing edge, premium mosaic, smart controls, heating ready. Statement feature.

Pool Construction Specialists in The Heights

We have extensive experience building swimming pools in The Heights and understand the specific requirements of this community — from plot layouts and soil conditions to community management approvals and setback requirements.

Every pool project in The Heights includes: structural engineering drawings, community NOC application and follow-up, excavation, reinforced concrete shell, waterproofing, premium tiling, filtration and pump installation, LED lighting, deck finishing, and full commissioning with water treatment setup.

What's Included

Our fixed-price pool construction packages include everything: design consultation, 3D visualisation, structural drawings, all approvals and NOCs, excavation and disposal, reinforced concrete pool shell, internal waterproofing, premium pool tiling (mosaic or porcelain), filtration system and pump, LED underwater and perimeter lighting, pool deck tiling or natural stone, safety fence or glass balustrade (if required), commissioning and water treatment, and a 3-year workmanship warranty.

Pool Types We Build

We build every type of residential pool: plunge pools for smaller plots, family pools with shallow and deep ends, lap pools for fitness, infinity and vanishing-edge pools, natural pools with stone features, and custom freeform designs. We also handle pool renovations — retiling, equipment upgrades, deck resurfacing, and conversions from chlorine to salt water systems.

The Process

Step 1: Free site visit in The Heights — we assess your plot, discuss your vision, and recommend the best pool type and position. Step 2: Design and quotation — 3D visualisation and fixed-price proposal. Step 3: Approvals — we handle all community NOC submissions. Step 4: Construction — 8-12 weeks from excavation to handover. Step 5: Commissioning and handover — water treatment setup, equipment training, warranty certificate.

Frequently Asked Questions

How much does a swimming pool cost in The Heights?

Plunge pools start from AED 50,000, family pools from AED 72,000, and infinity pools from AED 105,000. Final pricing depends on pool size, depth, materials, and features like heating or automation. We provide a fixed-price quote after a free site visit.

How long does pool construction take in The Heights?

Typically 8-12 weeks from excavation to handover. This includes structural work, plumbing, tiling, equipment installation and commissioning. Approval timelines are additional (2-4 weeks) and we handle the entire process.

Do I need approval to build a pool in The Heights?

Yes. Most communities require a No Objection Certificate (NOC) before pool construction begins. We prepare all documentation — structural drawings, plot plans, contractor credentials — and manage the entire approval process.

What type of pool is best for villas in The Heights?

This depends on your plot size, budget, and how you'll use the pool. For compact plots, a plunge pool (3x4m) is perfect. For families, a 5x10m pool with a shallow lounging area works best. We recommend the ideal option during our free site visit.

WhatsApp Us — Free Pool Consultation in The Heights →
FIRST UNICORN INTERIORS
Design. Build. Deliver. Done.
Interior Design · Fit-outs · Renovations · Construction
At a Glance

Swimming Pool Construction in The Heights Dubai by First Unicorn Interiors starts from AED 145,000 for a standard 6x3m pool, including design, permits, excavation, and installation. The process takes 8-12 weeks with Dubai Municipality approvals and 3-year warranty on workmanship and materials. Over 800 projects completed with in-house teams.

Key facts
  • Pool construction in The Heights starts at AED 145K for basic installs, up to AED 300K for luxury designs with lighting and heating.
  • Timeline: 8 weeks for standard pools, 12 weeks for custom with DEWA electrical NOC.
  • Requires Dubai Municipality building permit and master developer approval from Emaar for The Heights.
  • Includes 3-year warranty covering structural, plumbing, and tiling defects.
  • In-house team handles 3D visualization, engineering drawings, and full installation.

Quick answers

What maintenance is included after swimming pool construction?
First Unicorn offers annual maintenance contracts starting at AED 5,000, covering filter cleaning, chemical balancing, and leak checks for the first year post-installation.
What warranty applies?
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.