What is the cost of a bathroom renovation in Dubai?+
First Unicorn Interiors offers bathroom renovations starting at AED 25K for standard 5-10 sqm spaces, including tiling, fixtures, and plumbing. Mid-range options with premium marble and smart features cost AED 40K-60K. Full luxury setups with glass enclosures and custom vanities range from AED 70K+.
How long does a kitchen renovation take in Dubai?+
Basic kitchen remodels take 4-6 weeks, covering cabinetry and countertop installation. Mid-tier projects with electrical rewiring and appliance integration last 6-8 weeks. Comprehensive designs including structural changes and approvals require 8-12 weeks.
What permits are needed for villa renovations in Dubai?+
Dubai Municipality (DM) issues building permits and NOCs for structural changes. DEWA approves electrical and plumbing modifications. For community-specific works, master developers like Emaar or Nakheel require additional approvals to ensure compliance with local regulations.
What does a full villa renovation cost in Dubai?+
Full villa renovations by First Unicorn start at AED 150K for 3-4 bedroom homes, including interiors, painting, and flooring. Larger 5+ bedroom villas with extensions cost AED 250K-400K. Packages encompass 3D visualization and municipality approvals.
How much for swimming pool renovation in Dubai?+
Swimming pool renovations begin at AED 145K for resurfacing, tiling, and pump upgrades on standard 30-50 sqm pools. Advanced projects with lighting, heating, and landscaping range AED 200K-300K. Includes waterproofing and DEWA electrical compliance.
What warranty applies?+
3-year craftsmanship warranty, covers workmanship + materials defects, includes structural, plumbing, electrical, tiling, joinery, finishes.